Baxi Baxi Boston 2 80 OF, Baxi Boston 2 70 OF, Baxi Boston 2 60 OF, Baxi Boston 2 50 OF, Baxi Boston 2 40 OF User Operating Instructions Manual

Please keep these Instructions safe.
Baxi Boston 2 OF
Floor Standing Room Sealed Gas Fired Central Heating Boilers
Comp N° 235306 - Iss 4 - 7/00
User’s Operating Instructions
Should you move house, please hand
them over to the next occupier.
OPERATING YOUR BOSTON 2 - Page 2
Natural Gas
Your Baxi Boston 2 is a gas fired, open flued central heating boiler providing heating for your home and domestic hot water where required.
Baxi Boston 2 80 OF
G.C. No. 41 077 84
Baxi Boston 2 70 OF
G.C. No. 41 077 83
Baxi Boston 2 60 OF
G.C. No. 41 077 82
Baxi Boston 2 50 OF
G.C. No. 41 077 81
Baxi Boston 2 40 OF
G.C. No. 41 077 80
Baxi UK Limited is one of the leading manufacturers of domestic heating products in the UK.
Our first priority is to give a high quality service to our customers. Quality is built into every Baxi product - products which fulfil the demands and needs of customers, offering choice, efficiency and reliability.
To keep ahead of changing trends, we have made a commitment to develop new ideas using the latest technology – with the aim of continuing to make the products that customers want to buy.
Baxi is also the largest manufacturing partnership in the country. Everyone who works at the company has a commitment to quality because, as shareholders, we know that satisfied customers mean continued success.
We hope you get a satisfactory service from Baxi. If not, please let us know.
Baxi is a BS-EN ISO 9001 Accredited Company
All CORGI registered installers carry a CORGI identification card and have a registration number. Both should be recorded in your boiler Log Book. You can check your installer is registered by telephoning 01256 372300 or writing to:­1 Elmwood, Chineham Business Park, Crockford Lane, Basingstoke. RG24 8WG
1 Remove door panel as shown. 2 Turn the boiler thermostat knob to
the ‘OFF’ position fully anti-clockwise. 3 Turn on the main gas and electricity
supplies to the appliance. 4 To light the pilot: Looking through
the pilot viewing window press the gas control knob fully inwards and hold. Press in igniter button and release. Repeat until pilot ignites. Continue to hold in gas control knob for approximately 15 seconds and then release. Pilot should stay alight.
NOTE: If pilot fails to remain alight or is extinguished at any time, wait at least 3 minutes then repeat the procedure from the start of section “4”. Once the pilot is alight it may be left on permanently.
5 To light the boiler: Ensure that all external controls, e.g. room thermostat, timer, etc. are calling for heat. Turn boiler thermostat fully clockwise to high setting. Main burner will then light.
The optimum boiler setting depends upon type of system, external controls and your requirements. Your installer will be able to advise you on this matter.
NOTE: If the pilot light is persistently extinguished the flue system may be unsound. Your installer or local gas region should be contacted as soon as possible in such circumstances.
“Benchmark” Installation, Commissioning and Service Record Log Book
Please ensure that your Installer has completed the installation and Commissioning sections of the Log Book, and hands the Log Book over. The details of the Log Book will be required in the event of any warranty work. Keep the Log Book in a safe place and ensure that the relevant sections are completed at each subsequent regular service visit.
Loading...
+ 2 hidden pages