Please read these instructions carefully before starting installation and keep in a safe place for future reference. ENSURE the room is well heated and ventilated.
Check the contents of the pack carefully before installation. Bauhaus will
not be held responsible for any de-t / re-t costs where faulty product has been tted.
If any fault is found with materials or workmanship, it must be reported immediately to the manufacturer. Remedial action will be taken, based on information received, on condition that: 1. Full details are supplied to the
manufacturer; 2. The product has not been modied or tampered with;
3. The manufacturer is informed of any damage/shortages prior to
installation. 4. The product has not been installed, or attempts have been made to install.
We do not accept responsibility for any problems that may occur through incorrect installation.
Advice & Safety
This product should be only be installed by a suitably qualied Plumber/ installer. Should the installation be completed by a non-qualied person any
product guarantee maybe considered invalid. For a claim made under our
warranty written certication of your installers qualications can be required.
It is advised that all doors and drawers are removed prior to tting to avoid
unnecessary damage occurring.
It is recommended that the furniture and accessories are installed after
tiling, ensuring that the product is installed at to the tile face and allows
product to be easily removed if required in the future.
This document has been prepared for your guidance, you must exercise due care at all times.
Please note that some units are heavy. Always take care when lifting, and
follow health and safety guidelines. It is recommended that 2 people carry out the installation of larger basin/vanity units over 30Kgs gross weight.
Warning! Please check for any hidden pipes or electrical cables before drilling holes in the oor or walls.
When using power tools always follow the manufacturer’s user instructions.
This installation guide details tting to a solid wall. If your bathroom has studded/plasterboard walls, please use appropriate plasterboard xings. Please ensure the wall can take weight of units detailed above. Before
installing a wooden bathroom unit into a new property, extension or recently
plastered room we strongly advise the building/room is completely dry, well
ventilated and adequately heated.
Important pre-installation notes
To ensure full working use of the drawers we recommend the use of
Bauhaus basin furniture trap BTR0410W.
Care & Cleaning
Cast mineral marble products should be cleaned regularly with warm soapy water, then rinsed with clean water and, if desired, dried and polished with
a soft cloth. Lime scale deposits can be removed using a 50:50 solution of
warm water and lime scale remover and soft clean cloth. We recommend
regular cleaning with Bauhaus Cream Polish SD150RW, specially
formulated to clean and help protect the surface of cast mineral marble basins.
Do not use abrasive cleaners or bleach in this will permanently damage the
high gloss surface.
Use a well wrung chamois leather or micro bre cloth to clean furniture
carcasses.
If any maintenance is required then it must be carried out by a qualied Plumber.
The manufacturer reserves the right to make technical modications without
prior notice.
IMPORTANT - Advice and safety - Please read before installation
Tools & equipment needed: Drill, 8mm Suitable drill bit, Phillips screwdriver, Spirit level, Ruler/tape measure, Pencil, Silicone sealant (clear).
BATHROOM FURNITURE RANGE
LINEA
INSTALLATION INSTRUCTIONS
LN1200D
600 Single Drawer Basin Unit
& Basin
750 Single Drawer Basin Unit
& Basin
1000 Single Drawer Basin Unit
& Basin
1200 Drawer, 2 Door
2 Basin Unit & Basin
x2
x4
x2
LN0621SRW
LN0721SRW
LN6000D
LN7500D
LN1021SRW
LN1000D
x2
x4
x2
x2
x4
x2
x2
x4
x4
34kg with basin 40.5kg with basin 68kg with basin 70kg with basin
LN1211SRW
LN1221SRW
LN1011SRW
LN0711SRW
LN0611SRW
‘Wall bracket’ installation
Use the measurements above, to position the ‘wall brackets’.
a: Important: The measurements given above are the maximum the brackets can
be spaced apart, the brackets must t
within that measurement.
b: Mark the bracket xing holes onto the wall. Drill Ø 8mm holes, insert the
wall plugs on solid walls and attach the brackets (c).
Important: If the basin unit and/or basin are not tted level this may result in the basin not draining correctly.
Position the unit on the brackets.
2
Remove the drawer before installation. Pull the drawer fully out (1) and lift the front (2) as shown.
Step 1 Step 2
Plan unit position
Decide on the position and
height of the unit.
The recommended basin
height is between 860mm and 870mm from oor to top
of basin.
Step 3
600 Basin Unit 1200 Basin Unit
532mm 1132mm
860mm ­870mm
360mm ­370mm
932mm
1000 Basin Unit
a
c
Top
b
115
mm
Note: The Units can be hung using one of two options, ‘Hanging hooks’ or ‘Wall brackets’ depending on your requirements and wall structure. It is recommended to use the bracket option on non-solid walls.
‘Hanging hook’ installation
Use the measurements above, to position the ‘hanging hooks’.
a: Mark the xing hole positions onto the wall.
Drill Ø 8mm holes, insert the wall plugs and the ‘hanging hooks’.
b: The ‘hanging hooks’ should protrude from the wall by 5-7mm.
Position the unit on the hanging hooks.
115 mm
a
5-7mm
b
115 mm
750 Basin Unit
682mm
300mm
300mm
532mm
185 mm
115
mm
115 mm
115 mm
115 mm
185mm
300mm
532mm
300mm
1200 Basin Unit Only
600, 750 & 1000 Basin Units
Basin & Basin Unit Installation - 600 Unit is shown as a typical example
1
2
3
a: Attach the tap to basin and
carefully bed in the waste using silicone only.
b: Carefully apply silicone to the top edges of the unit.
c: Carefully position the basin down onto the unit, ensure it is
centrally positioned and ush
at the back.
Connect the tap and waste.
Apply a bead of silicone to the join between the basin/unit and
wall, on all 4 sides.
Leave silicone, 24 hours to dry.
Re-t drawer: Pull both drawer runners
fully out.
1: Set the drawer down onto the runners.
2: Push the drawer fully in until it locks
(click).
Test to make sure the drawer operates correctly.
Tower Storage Unit Installation -
LN3516F 27Kg
Step 1
The storage unit is designed to offer
universal left/right hand door opening
without removal of hinges.
a: Decide on the opening side of the
door. Rotate the whole unit to change the opening side.
b: We suggest positioning the tower storage unit so it is level with any other units that have been installed.
a b
Note: Basin waste and tap ttings when over tightened can create stress within the basin material which may in time cause the failure of the product. Waste ttings should be carefully bedded in silicone and the back nut hand tightened an
additional quarter turn using a suitable spanner is sufcient to create the required watertight seal. Care should also be taken when tting brassware to tap platforms in order to prevent similar stress related failures.
Step 4
a: Check the unit is level.
If levelling is required, use a screwdriver to adjust the hanging position, as follows:
b: To lift or lower the unit, adjust the screw shown.
c: To move the unit closer or further from the wall, adjust the screw shown.
b
c
a
Step 5
Step 6
1
2
‘click’
a c
b
For any further information please contact Bauhaus on: 0845 873 8840
Or visit our web-site at: www.bauhaus-bathrooms.co.uk
The manufacturer reserves the right to make technical
modications without prior notice.
To move door up or down: Loosen screws shown and move door up or down to suit. Re-tighten.
To move door in or out: Loosen screw shown and move door in or out to suit. Re-tighten.
To move door left or right: Loosen screw shown and move door left or right to suit. Re-tighten.
Step 3
Check the unit is level. If levelling is required: inside the unit, use a screwdriver to adjust the hanging position.
a: To lift or lower the unit, adjust the screw shown.
b: To move the unit closer or further from the wall, adjust the screw shown.
c: Once levelled, apply a bead of silicone
to the join between the unit and wall, on all four sides.
Leave silicone, 24 hours to dry.
If the alignment of the door needs adjusting, follow the instructions below.
Important information
All ceramic sanitary ware is subject to the limitations of the manufacturing process. Unlike machine nished products, natural
clay based products shrink and move during high temperature
ring and, because it is not possible to control this process
absolutely, minor variations in the dimensional tolerance, form
and surface of the nished products will occur.
Before installing a wooden bathroom into a new property, extension or recently plastered room we strongly advise the
building/room is completely dry, well ventilated and adequately
heated.
Step 2
286mm
48
mm
Back of unit
a
a: Use the measurements opposite, to
position the ‘hanging hooks’.
b: Mark the xing hole positions onto the
wall.
Drill Ø 8mm holes, insert the wall plugs
and the ‘hanging hooks’.
c: The ‘hanging hooks’ should protrude
from the wall by 5-7mm.
Position the unit on the hanging hooks.
286mm
48
mm
b
5-7mm
c
c
Hinge adjustment
a
b
Loading...