Baseline Systems BL-5200R User Manual

BL-5200R Series Powered biCoder™
Installation Guide
Each terminal of the Baseline’s Powered biCoder has a serial number which is used as an address to identify it to the BaseStation controller. The BaseStation broadcasts a message along the two-wire and the biCoder responds by turning the attached valve on or off.
Powered biCoder Installation Instructions
2. After you have finished copying the programming information, disconnect valve wires (one at a time) from your clock, making sure to indicate which wire belongs to which zone. (Masking tape works well for this.)
3. Connect the valve wires to the valve terminals on the Powered biCoder, writing down which valve and zone is being attached to which terminal.
Note: Wire connections must be DBR/Y or equivalent moisture-resistant connectors. Install all connections according to the manufacturer’s instructions.
4. If you are using biSensors, connect the valve wiring for the zones where the sensors are
located to terminals A1, A2, B1, or B2.
5. If you are using two-wire, connect it to the two-wire terminals.
6. Configure your system according to the configuration section in your controller user manual.
7. Power up the controller and verify that the LEDs on the front panel are lit.
BL5224 24 Valve Powered biCoder (The 12 Valve Powered biCoder has only A1 - A12 terminals populated. The 36 & 48 Valve Powered biCoder incorporates a second BL5224 PCA.)
1-866-294-5847 Rev 11.5.2012 www.baselinesystems.com
Sensor Terminal
DBR/Y or equivalent moisture-resistant connectors
BL-5200R Series Powered biCoder™
Installation Guide
Sensor Terminal
Zone Terminals
Common Terminals
See “Burying the biSensor” details in the biSensor Install
Use wire nuts to test communication, and then replace with Baseline approved moisture-resistant connectors before burying.
Follow Local Electrical Codes and Practices
biSensor Installation Instructions
1. Install the biSensor near the closest valve location. Follow the “Burying the biSensor” instructions included with the biSensor.
2. Connect the red wire from the biSensor to the power wire or pilot wire of the valve and black wire from the biSensor to the common wire of the solenoid using the provided DBG or equivalent waterproof connectors. It is critical that polarity be maintained.
3. Connect the pilot wire from the valve to either the A1, A2, B1, or B2 terminals on the controller.
4. Press the biSensor update button and verify that the light above the terminal (A1, A2, B1,or B2) stays on.
5. Assign the biSensor and test its operation according to the instructions in the controller’s user manual.
1-866-294-5847 Rev 11.5.2012 www.baselinesystems.com
Loading...