Bardiani BBZP, BBYP, BBZR, BBYR, BBYT Instruction, Use And Maintenance Manual

...
Instruction, Use and Maintenance Manual
SINGLE SEAT VALVE
BBZP - BBZR - BBZT BBYP - BBYR - BBYT
Bardiani Valvole S.p.A.
via G. di Vittorio, 50/52 - 43045 Fornovo di Taro (PR) - Italy tel. +39 0525 - Fax 0525 3408 bardiani@bardiani.com - www.bardiani.com
EN-IST-BBZP-0418
Instruction, Use and Maintenance Manual
INDEX
1 Safety,Warning and Mandatory Signs 5 2 General safety warnings 8 3 Technical data 9 4 Checking / Unpacking / Lifting 10 5 Installation 12 6 Operation 15 7 Troubleshooting 16 8 Cleaning 17 9 General maintenance 18 10 Scheduled maintenance 20 11 Tools useful for Disassembly/Reassembly 21 12 Pneumatic valves BBZP - BBZR - BBZT- BBYP - BBYR - BBYT 22 13 Disassembly of the BBZP - BBZR - BBZT - BBYP - BBYR - BBYT 24 A Disassembly of the BBZP - BBZR - BBZT - BBYP - BBYR - BBYT 25 B Disassembly of the BBZP P7-LL 29 14 Assembly of the BBZP - BBZR - BBZT - BBYP - BBYR - BBYT 36 A Assembly of the BBZP - BBZR - BBZT - BBYP - BBYR - BBYT 42 B Assembly of the BBZP P7-LL 46 15
Pneumatic Valves BBZP - BBZR - BBZT- BBYP - BBYR - BBYT Diverters 50 16 Disassembly of the BBZP - BBZR - BBZT- BBYP - BBYR - BBYT Diverters 53 A Disassembly of the BBZP - BBZR - BBZT- BBYP - BBYR - BBYT Diverters 54 B Disassembly of the BBZP M8-LLL Diverter 59 17
Assembly of the BB ZP - BBZR - BBZT- BBYP - BBYR - BBYT Diverters 66 A Assembly of the BB ZP - BBZR - BBZT- BBYP - BBYR - BBYT Diverters 72 B Assembly of the BBZP M8-LLL Diverter 77 18 Pneumatic Valves BBZT - BBYT 81 19 Disassembly of the BBZT - BBYT 83 20 Assembly of the BBZT - BBYT 87 21 Annexes 94 22 2D diagram BBZP 95 23 2D diagram BBZP M8-LL 96 24 2D diagram BBZP P7-LL 97 25 2D diagram BBZR 98 26 2D diagram BBZT 99 27 2D diagram BBYP 100 28 2D diagram BBYR 101
2
EN-IST-BBZP-0418
Instruction, Use and Maintenance Manual
29 2D diagram BBYT 102 30 2D diagram BBZP Diverter 103 31 Diagram BBZP M8-LLL Diverter 104 32 Diagram BBZP M9-LLL Diverter 105 33 2D diagram BBZR Diverter 106 34 2D diagram BBZT Diverter 107 35 2D diagram BBYP Diverter 108 36 2D diagram BBYR Diverter 109 37 2D diagram BBYT Diverter 110 38 Warranty 111 39 Recommendations 112
MANUAL REVISION DATE
EN-IST-BBZP-0418
3
Instruction, Use and Maintenance Manual
INTRODUCTION
This “Instruction, Use and Maintenance Manual” has been prepared to provide guidance and recommendations to assist qualified skilled technicians in the understanding, running and maintenance orf the Products supplied.
It forms an integral part of the Products supplied and must be read prior to any installation, operation and/or maintenance of all types of valves provided.
This manual must be saved for future reference and be kept readily available at the unit.
With regards to the use of valves compliant with EU Directive 2014/34/UE (ATEX), consultation

The essential characteristics of all types of valves described herein being consistent, the Manufacturer reserves the right to alter and or complement and or update at any time and with no obligation to notify so in writing, the data and or information relevant to the use of the valves described in this "Instruction, Use and Maintenance Manual".
A constantly updated version of this "Instruction, Use and Maintenance Manual" is available at the Manufacturer's website www.bardianivalvole.it.
Under no circumstance shall the Manufacturer be held liable for consequences resulting from failure and or improper use of the instructions contained in this Manual and relating to the installation, operating, maintenance and storage of the products.
All rights reserved.
Full or part reproduction, transfer and or recording of any part of this "Instruction, Use and Maintenance Manual" by all means, whether it be electronic, on hard copy, mechanical or any other means or recording or reuse is strictly prohibited without the prior written consent of the Manufacturer and for any use other than that of the Buyer.
(Translation of the Original Instructions in the italian Language)
4
EN-IST-BBZP-0418
Instruction, Use and Maintenance Manual

1 Safety,Warning and Mandatory Signs

WARNING SIGNS
Pictogram Description Notes
WARNING General
WARNING Hand crushing
This tells the person in question that the operation described involves (when not performed in accordance with the relative safety regulations) the risk of personal injury.
Exercise caution in executing the procedure Hand crushing hazard
WARNING Heavy loads
WARNING Severe burns
WARNING Risk of explosions
MANDATORY SIGNS (FOR THE OPERATOR IN CHARGE OF ASSEMBLY/DISASSEMBLY)
Pictogram Description Notes
OBLIGATION General
PROTECTIVE GLOVES
Exercise caution in executing the procedure Heavy suspended loads.
Heat emission hazard Very hot surface, risk of severe burns
Take Care, risk of explosions
Special instructions must be followed to avoid injury to persons.
Safety gloves must be available for handling objects which could cause hand injuries.
EN-IST-BBZP-0418
HARD HAT
FOOTWEAR
SUITABLE CLOTHING
A hard hat must be worn during machine lifting operations to protect against hazards generated by suspended loads.
Use safety footwear to protect against the risks of falling objects during operations to transport the machine.
Suitable clothing such as overalls. It is strictly prohibited to wear clothes with large flapping sleeves and/or other loose items which could easily get caught up in machine parts.
5
Instruction, Use and Maintenance Manual
MANDATORY SIGNS (FOR THE OPERATOR IN CHARGE OF MECHANICAL MAINTENANCE)
Pictogram Description Notes
OBLIGATION General
Special instructions must be followed to avoid injury to persons.
PROTECTIVE GLOVES
HARD HAT
FOOTWEAR
SUITABLE CLOTHING
SAFETY GLASSES
Protective gloves must be available for handling objects which could cause hand injuries or when there is the possibility of coming into contact with harmful substances..
Hard hats must be available when lifting heavy parts.
Use safety footwear to protect against injuries caused by falling objects during maintenance operations (particularly when dismantling parts).
Suitable clothing such as overalls. It is strictly prohibited to wear clothes with large flapping sleeves and/or other loose items which could easily get caught up in machine parts.
Protective glasses must be available when there is the possibility of contact which harmful substances which could cause eye injuries.
OPERATING SIGNS
Pictogram Description Notes
SKILLED PERSONNEL
NOTE
ENVIRONMENTAL NOTE
CLAMP
CLAMP WITH SOFT JAWS
Dismantling/Assembling and maintenance operations must be carried out by expert technicians only.
Follow the indicated note with care
Follow the regulations in force in the country of used governing waste disposal.
Use of a clamp
Use of a clamp with jaws made from soft material
6
EN-IST-BBZP-0418
Instruction, Use and Maintenance Manual
OPERATING SIGNS
Pictogram Description Notes
PRESS
Use of a press
PRESS (release)
ELECTRICAL CONNECTION
ELECTRICAL DISCONNECTION
PNEUMATIC CONNECTION
PNEUMATIC DISCONNECTION
1
APPLICATION OF FOODSAFE GREASE
Use of a press Gradual release of the pressure force
Electrical connection to the control unit (consult the relative instruction manual).
Electrical disconnection from the control unit (consult the relative instruction manual).
Connection of the air to the valve.
Disconnection of the air from the valve
Use FOODLUBE HI-TEMP 2 15254 grease only
2
APPLICATION OF FOODSAFE GREASE
APPLICATION OF MULTIPURPOSE GREASE
THREADLOCK APPLICATION
OPTIONAL
Use FOODLUBE Multi-paste 15756 grease only
Use AGIP GREASE MU EP 2 SE 463754 only
Use SPEED BOND M500 threadlock only
EN-IST-BBZP-0418
7
Instruction, Use and Maintenance Manual

2 General safety warnings

Intended use
Bardiani valves have been exclusively for moving fluids.
Prohibited use
The valve must not be used:
• for any operations different to those described under the heading “Intended Use”,
• for handling fluids different to the type specified by the manufacturer;
• for moving fluids at different pressures to those envisaged by the manufacturer and indicated in the
valve's technical data.
Limitations on valve use
It is forbidden to:
• use the valve in a construction configuration different to the one envisaged by the manufacturer.
• use the valve where there is a risk of explosion and/or fire, unless envisaged by the manufacturer (if
the valves are certified in accordance with Directive 2014/34/EU, please refer to the ATEX Manual)-;
• integrate other systems and/or equipment which were not considered by the manufacturer during the
executive design phase,
• use the valve for purposes other than those specifically envisaged by the manufacturer.
WARNING The machine may not he used inside premises where there is a potentially explosive atmosphere or

with Directive 2014/34/EU please refer to the ATEX Manual).
BARDIANI VALVOLE S.p.A. declines all liability for installation, use or maintenance which fails to comply with the indications provided in this manual!
8
EN-IST-BBZP-0418
Instruction, Use and Maintenance Manual

3 Technical data

VALVE DATA
Maximum pressure PN10 Maximum seal pressure See catalogue Storage temperature from -10°C to 25°C Material in contact with the product AISI 316L (1.4404). Check the resistance to corrosion in
relation to products and detergents
Gasket material in contact with the product
Surface finish in contact with the product
Connectors 1/8” BSP Steam maximum temperature 130°C (266°F) Gaskets material FKM
EPDM, FKM, HNBR and other gaskets on request. Check compatibility with products and detergents
Ra 0.8 µm. Other finishes available on request
VAPOUR BARRIER DATA
PNEUMATIC ACTUATOR DATA
Connectors 1/8” BSP Pipe dimensions 6 mm external diameter, 4 mm internal diameter Air pressure from 6 bar (87 psi) to 8 bar (116 psi) Air quality Class 2, 4, 3 ISO8573-1 External material AISI 304L (1.4307) Seals NBR Noise levels 76 dB Electrical supply See Giotto Top
GASKET MATERIALS COMPATIBILITY
Product EPDM FKM HNBR MVQ
Temperature (applications with air) -10 to +140°C -10 to +200°C -10 to +130°C -70 to +230°C Caustic soda 2% 60°C 30°C To be checked Unsuitable Nitric Acid 2% 60°C 80°C To be checked Unsuitable Saturated steam 125°C Suitable To be checked Suitable Unsuitable Greases Unsuitable Suitable Suitable Unsuitable Alcohols Suitable Unsuitable Suitable Suitable
The valve is complies to PED
2014/68/EU directive, with special reference to Annex III, Module A,
concerning internal manufacturing checks as indicated in the Conformity Assessment Procedures.
The DN15--25 valves are included in compliance with Article 4, paragraph 3: Valves designed for use with gas, liquid gas, gases dissolved under pressure, steam and those liquids with a vapour pressure at maximum admissible temperature exceeding 0.5 bar at normal atmospheric pressure (1.013 mbar) within the following limits:
- For group 1 fluids when DN is from 25 to 100.
- For group 2 fluids when DN is 125 and over.
In the event of any doubt, please contact Bardiani Valvole S.p.A.
EN-IST-BBZP-0418
9
Instruction, Use and Maintenance Manual

4 Checking / Unpacking / Lifting

1. CHECK:
- Check the valve show no signs of damage caused during transport and that it corresponds with the order;
- Check the inside of the valve.
2. UNPACKING:
The valve packaging is made up of cardboard, wood and plastic. The valve is mainly made up of metal materials. The gaskets are usually made from elastomers. Disposal must be in compliance with local legislation.
10
EN-IST-BBZP-0418
Instruction, Use and Maintenance Manual
3. VALVE LIFTING:
Take care as to the type of valve you are handling. Based on the size there are two different lifting procedures.
CAUTION!
Before lifting the valve, make sure there are no disassembled or separate valve parts which could fall off causing injury to persons and damage to the valve.
A
BBZP
Size
DN
10-65 A
80-100 B
125-150 C
Weight
Kg
DN10 and DN65
Weight lower to 25 kg
C
B
DN80 and DN100
Weight between 25 kg and 50 kg
CAUTION!
The figures above are used purely to represent the methods and procedures for hoisting the valves. Bardiani Valvole S.p.A. declines all liability for any damage to things and/or injuries to persons caused by improper and/or incorrect hoisting of the valve.
EN-IST-BBZP-0418
DN125 and DN150 Weight over 50 Kg
11
Instruction, Use and Maintenance Manual

5 Installation

1. ELECTRICAL AND PNEUMATIC ENERGY SUPPLY
- Use expert personnel for installation/uninstallation operations;
- Check that the air pressure and quality are correct (see "Technical Data");
- Check the power supply to the control unit is correct (consult the relative instruction manual).
A = Upward movement of the valve member B = Downward movement of the valve member In single acting valves there is only one of the aforementioned commands.
2. REDUCING THE STRESS TO WHICH THE VALVE IS SUBJECTED:
- Vibrations;
- Thermal expansion of the piping;
- Excessive welding;
- Overload.
B
A
CAUTION!
The seal seats may become deformed or cause valve malfunctioning.
12
EN-IST-BBZP-0418
Instruction, Use and Maintenance Manual
3. CORRECT DIRECTION OF FLOW:
Flow in the opposite direction to valve closure minimizes water hammer
.
Valve 1L
4. VALVE CONNECTIONS/CONNECTORS:
If the valve is fitted with connectors, you may proceed with installation. Correctly insert the gaskets and tighten the connectors
Valve 3LL
Valve P7-LL
Valve M8-LL
.
Valve M8-LLL
Valve M9-LLL
CAUTION!
Bardiani Valvole S.p.A. declines all liability for any damage to things and/or injuries to persons caused by any failure to correctly follow the installation procedures.
EN-IST-BBZP-0418
13
Instruction, Use and Maintenance Manual
5. WELDING THE VALVE BODY ONTO PIPING:
Remove the body from the rest of the valve before proceeding with welding operations. Please refer to the following pages in this manual.
CAUTION!
Hand crushing hazard. During operation there is a risk of crushing inside the valve body in the area between the actuator and the valve body.
A
6. MINIMUM MAINTENANCE CLEARANCES:
Make sure there is enough room around the valve for it to be disassembled (with the control unit installed).
BBZP-BBZM - BBYP - BBZT - BBZR
DN A (mm) B (mm) C (mm)
10-25 240 240 240 32-40 265 255 255
50 280 270 270 65 290 285 285
80 300 300 300 100 325 315 315 125 410 400 400 150 440 425 425
C
B
CAUTION!
Bardiani Valvole S.p.A. declines all liability for any damage to things and/or injuries to persons caused by any failure to correctly follow the installation procedures.
14
C
EN-IST-BBZP-0418
Instruction, Use and Maintenance Manual

6 Operation

1. VALVE INSPECTION BEFORE OPERATION:
- Supply air to the actuator:
- Power the valve (via the control unit);
- Open and close the valve several times;
- Check that the valve works correctly and accurately.
A = Upward movement of the valve member B = Downward movement of the valve member In single acting valves there is only one of the aforementioned commands.
B
A
CAUTION!
Hand crushing hazard. During operation there is a risk of crushing inside the valve body in the area between the actuator and the valve body.
2. DUAL FUNCTION OF THE VALVE CYLINDER:
Depending on how the valve cylinder is turned and installed, operation will be in normally open or normally closed mode.
Normally closed Normally open
EN-IST-BBZP-0418
15
Instruction, Use and Maintenance Manual

7 Troubleshooting

PROBLEM POSSIBLE CAUSE POSSIBLE SOLUTION
External leak Leaks inside the closed valve
caused by normal wear
External leak
Premature leaks inside the closed valve
Difficulty opening and closing
Worn gasket Replace the seal
Excessive pressure Excessive temperature Aggressive fluids Too many commands active Difficulty opening and closing
Incorrect type of elastomer used for the gaskets
Incorrect positioning of the actuator
Incorrect operation of the actuator
Impurities in the actuator
Incorrect valve body positioning
Replace with a gasket of a different type of elastomer
Modify the operating conditions
Replace with a gasket of a different type of elastomer
Install the actuator correctly
Change from normally open (NO) to normally closed (NC) or vice versa
Actuator inspection and maintenance
Disassemble and correctly reposition the valve body
16
EN-IST-BBZP-0418
Instruction, Use and Maintenance Manual

8 Cleaning

1. VALVE CLEANING WITH DETERGENTS:
The system in which the valve is installed must be cleaned by expert personnel in observance of the following:
- Abide by the indicated detergent concentration values;
- Observe the instructions provided by the detergent manufacturer.
- Always wear protective safety glasses and gloves.
Risk of stainless steel corrosion
IMPORTANT!
- Accurately dose detergents to avoid excessive concentration;
- Always rinse thoroughly with clean water after washing.
- Check compatibility of valve materials.
CAUTION!
Burns hazard. The valves and piping may be very hot. Wear protective gloves
WARNING
After installing a new or serviced valve, perform an internal washing cycle before using the piping for food liquids. If it there has been any welding work, passivation treatment must be carried out.
Risk of damage elastomers
EXAMPLE OF INTERNAL WASHING CYCLE (CIP)
Phases Temperature °C Washing product
Initial rinse Environment Chlorine- and chloride-free
Washing 70 °C Caustic soda (NaOH) at 1%
Intermediate rinse Environment Chlorine- and chloride-free
Washing 70 °C Nitric acid (HNO3) at 0.5%
End rinse Environment Chlorine- and chloride-free
Recommended washing product velocity = 2m/s
EN-IST-BBZP-0418
water
water
water
17
Instruction, Use and Maintenance Manual

9 General maintenance

1. MAINTENANCE PRECAUTIONS
Maintenance operations must be carried out by expert technicians only.
CAUTION!
Maintenance operations must be carried out with the line stopped and all utilities (electricity, compressed air) disconnected.
CAUTION!
Always discharge the fluid pressure in the valve and piping before disassembling the valve.
CAUTION!
Burns hazard. The valves and piping may be very hot. Wear protective gloves
18
EN-IST-BBZP-0418
Instruction, Use and Maintenance Manual
2. CLEANING AWAY DEPOSITS:
- Thoroughly wash and clean all the valve parts before disassembly;
- Pay attention to any possible detergent or other aggressive fluid deposits (see "Cleaning");
- Always use protective safety glasses and gloves when required.
CAUTION!
Hand crushing hazard. During operation there is a risk of crushing inside the valve body in the area between the actuator and the valve body.
3. REPLACEMENT OF WORN VALVE PARTS:
Always use original spare parts
EN-IST-BBZP-0418
19
Instruction, Use and Maintenance Manual

10 Scheduled maintenance

SCHEDULED MAINTENANCE VALVE GASKETS ACTUATOR GASKETS
Preventive Replace after 12 months Replace after 24 months
In the event of leaks Replace at the end of the day Replace in the event of leaks
Periodical
Check correct operation and
that there are no leaks
Record the actions carried out Record the actions carried out
Check correct operation and
that there are no leaks
20
EN-IST-BBZP-0418
Instruction, Use and Maintenance Manual

11 Tools useful for Disassembly/Reassembly

TOOLS
Soft
EN-IST-BBZP-0418
21
Instruction, Use and Maintenance Manual
12 Pneumatic valves BBZP - BBZR - BBZT- BBYP -
BBYR - BBYT
NO. DESCRIPTION
1 Lower body 2 Shutter 6 Sealing ring 7 Sealing washer 8 Screw
9 Cylinder 10 Bush 14 Sealing ring 17 Bush 19 Sealing ring 24 Air connector 28 Shutter nut 33 Clamp 34 Screw 35 Assembly 40 Cap 42 Upper body 45 Steam barrier 47 Sealing ring 50 Gasket holder disc 57 Sealing ring
108 Sealing ring 120 Bush 154 Thickness 156 Sealing ring 157 Sealing ring 168 Bush 274 Sealing ring 275 Sealing ring 276 Sealing ring 277 Sealing ring
22
EN-IST-BBZP-0418
Instruction, Use and Maintenance Manual
(DN125-150)
276
17
277
7
19
120
50
157
50
157
(BBYP ­ BBYR)
24
40
275
10
35
274
9
(DN125-150)
(BBZR - BBYR)
154
34 (DN10-100) 8 (DN125-150)
(BBYP - BBYR)
156
2
6
7
14
(BBZP:
33
42
1
M8-LL / P7-LL)
156
(BBZP P7-LL)
2
14
EN-IST-BBZP-0418
47
168
45
168
47
57
33
(P.T.F.E.)
2
14
28
108
33
1
23
Instruction, Use and Maintenance Manual
13 Disassembly of the BBZP - BBZR - BBZT - BBYP -
BBYR - BBYT
a
(BBZP - BBZR - BBZT - BBYP - BBYR - BBYT)
(25 - 28)
b
24
(BBZP P7-LL)
(29 - 31)
EN-IST-BBZP-0418
Instruction, Use and Maintenance Manual
A Disassembly of the BBZP - BBZR - BBZT - BBYP -
BBYR - BBYT
a
1
(Normally closed)
(ormally open or double acting)
1
33
EN-IST-BBZP-0418
25
Instruction, Use and Maintenance Manual
c
1
2
(BBZP M8-LL)
c
42
108
1
(Normalmente
(Normally closed)
chiusa)
33
(Normalmente
(ormally open or
aperta o doppio
double acting)
effetto)
42
33
26
EN-IST-BBZP-0418
Instruction, Use and Maintenance Manual
(BBYP - BBYR - BBYT)
a
3
50
d
3
50
2
EN-IST-BBZP-0418
2
27
Instruction, Use and Maintenance Manual
14
a
4
(P.T.F.E.)
e
4
a
5
2
2
e
5
14
28
28
(32)
EN-IST-BBZP-0418
Instruction, Use and Maintenance Manual

B Disassembly of the BBZP P7-LL

b
1
b
2
1
(Normally closed) (ormally open or
double acting)
33
2
EN-IST-BBZP-0418
29
Instruction, Use and Maintenance Manual
b
3
50
42
33
b
4
42
30
108
EN-IST-BBZP-0418
Instruction, Use and Maintenance Manual
b
5
2
(P.T.F.E.)
e
5
b
6
2
14
2
e
6
14
28
EN-IST-BBZP-0418
(32)
31
Instruction, Use and Maintenance Manual
7
(BBYP - BBYR - BBYT)
d
7
50
156
8
d
8
120
50
157
50
156
10
d
9
50
157
45
d
11
45
57
d
33
47
47
45
12
d
168
45
168
32
EN-IST-BBZP-0418
Instruction, Use and Maintenance Manual
(DN125-150)
13
(BBZR - BBYR)
35
(DN10-100)
34
8
13
f
154
35
(DN10-100)
34
8
(DN125-150)
EN-IST-BBZP-0418
33
Instruction, Use and Maintenance Manual
14
40
(BBZT - BBYT)
g
14
40
24
(BBZT - BBYT)
(84- 94)
34
24
EN-IST-BBZP-0418
Instruction, Use and Maintenance Manual
(DN 125-150)(DN 10-100)
15
16
h
h
17
9
10
275
15
i
7
7
17
i
10
274
h
276
17
277
16
19
9
6
EN-IST-BBZP-0418
35
Instruction, Use and Maintenance Manual
14 Assembly of the BBZP - BBZR - BBZT - BBYP - BBYR
- BBYT
2
1
1
14
10
85°C
H O
2
36
a b c
EN-IST-BBZP-0418
Instruction, Use and Maintenance Manual
(DN 10-100)
h
3
h
4
276
17
277
275
10
274
3
(DN 125-150)
i
19
9
6
h
5
9
i
4
7
7
EN-IST-BBZP-0418
37
Instruction, Use and Maintenance Manual
6
(BBZT - BBYT)
40
24
7
40
24
(BBZR - BBYR)
f
7
38
(DN10-100)
34
8
(DN125-150)
35
154
35
(DN10-100)
34
8
(DN125-150)
EN-IST-BBZP-0418
Instruction, Use and Maintenance Manual
(BBYP - BBYR - BBYT)
d
8
168
45
168
d
11
d
9
47
45
47
d
12
10
d
45
57
1
2
1
45
33
EN-IST-BBZP-0418
39
Instruction, Use and Maintenance Manual
13
120
50
157
(BBYP - BBYR - BBYT)
d
13
14
14
15
1
50
156
1
d
15
1
d
40
157
50
50
1
156
EN-IST-BBZP-0418
Instruction, Use and Maintenance Manual
a
(BBZP - BBZR - BBZT - BBYP - BBYR - BBYT)
(42 - 45)
b
EN-IST-BBZP-0418
(BBZP P7-LL)
(46 - 49)
41
Instruction, Use and Maintenance Manual
A Assembly of the BBZP - BBZR - BBZT - BBYP - BBYR
- BBYT
a
16
2
14
(P.T.F.E.)
16
17
e
14
e
28
2
42
EN-IST-BBZP-0418
Instruction, Use and Maintenance Manual
a
18
(BBYP - BBYR - BBYT)
18
d
50
2
50
2
EN-IST-BBZP-0418
43
Instruction, Use and Maintenance Manual
19
a
20
a
2
1
(Normally closed)
33
(Normally open or double acting)
44
EN-IST-BBZP-0418
Instruction, Use and Maintenance Manual
(BBZP M8-LL)
c
21
42
108
1
2
33
(BBZT - BBYT)
(84 - 94)
EN-IST-BBZP-0418
45
Instruction, Use and Maintenance Manual

B Assembly of the BBZP P7-LL

b
16
2
(P.T.F.E.)
14
16
17
e
14
28
e
2
46
EN-IST-BBZP-0418
Instruction, Use and Maintenance Manual
b
18
42
108
19
b
2
50
EN-IST-BBZP-0418
33
42
47
Instruction, Use and Maintenance Manual
20
b
21
b
48
2
(Normally closed)
(Normally open or double acting)
EN-IST-BBZP-0418
Instruction, Use and Maintenance Manual
b
22
2
33
1
EN-IST-BBZP-0418
49
Instruction, Use and Maintenance Manual
15
Pneumatic Valves BBZP - BBZR - BBZT- BBYP - BBYR ­BBYT Diverters
NO. DESCRIPTION
1 Lower body
2 Upper shutter
6 Sealing ring
7 Sealing washer
8 Screw
9 Cylinder 10 Bush 14 Sealing ring 17 Bush 19 Sealing ring 24 Air connector 28 Shutter nut 30 Double shutter 33 Clamp 34 Screw 35 Assembly 40 Cap 42 Upper body 45 Steam barrier 47 Sealing ring 50 Gasket holder disc 51 Lower shutter 57 Sealing ring 92 Intermediate body 94 Sealing ring
108 Sealing ring 120 Bush 154 Thickness 156 Sealing ring 157 Sealing ring 168 Bush 212 Shutter stem 213 Sealing ring 274 Sealing ring 275 Sealing ring 276 Sealing ring 277 Sealing ring
50
EN-IST-BBZP-0418
Instruction, Use and Maintenance Manual
24
40
10
276
17
277
275
274
(DN125-150)
7
19
9
(DN125-150)
6
(BBZR - BBYR)
(BBYP - BBYR)
120
50
50
157
156
A
33
7
42
157
156
CB
35
154
34 (DN10-100) 8 (DN125-150)
(BBYP - BBYR)
33
47
168
45
168
108
33
14
14
30
(P.T.F.E.)
212
14
30
14
28
EN-IST-BBZP-0418
47
57
1
51
Instruction, Use and Maintenance Manual
BBZP M8-LLL
2
14
33
B
51
33
94
213
33
42
108
BBZP M9-LLL
C
92
108
33
42
108
33
92
108
33
14
14
30
1
1
52
EN-IST-BBZP-0418
Instruction, Use and Maintenance Manual
16
Disassembly of the BBZP - BBZR - BBZT- BBYP - BBYR ­BBYT Diverters
a
(BBZP - BBZR - BBZT - BBYP - BBYR - BBYT)
(54 - 58)
b
(BBZP M8-LLL)
EN-IST-BBZP-0418
(59 - 65)
53
Instruction, Use and Maintenance Manual
A
Disassembly of the BBZP - BBZR - BBZT- BBYP - BBYR ­BBYT Diverters
a
1
(Normally closed)
33
1
(Normally open or double acting)
54
EN-IST-BBZP-0418
Instruction, Use and Maintenance Manual
(BBZP M9-LLL)
c
1
c
2
92
33
1
c
3
92
108
33
(Normally closed)
(Normally open or double acting)
EN-IST-BBZP-0418
55
Instruction, Use and Maintenance Manual
a
4
a
5
56
30
a
6
14
14
EN-IST-BBZP-0418
Instruction, Use and Maintenance Manual
(P.T.F.E.)
e
5
30
e
6
14
28
e
7
212
EN-IST-BBZP-0418
14
57
Instruction, Use and Maintenance Manual
(BBYP - BBYR - BBYT)
a
8
d
8
42
50
33
a
9
50
33
42
42
58
108
EN-IST-BBZP-0418
Instruction, Use and Maintenance Manual

B Disassembly of the BBZP M8-LLL Diverter

b
1
b
2
33
1
EN-IST-BBZP-0418
59
Instruction, Use and Maintenance Manual
b
3
213
b
4
51
94
b
5
b
6
92
108
60
33
92
EN-IST-BBZP-0418
Instruction, Use and Maintenance Manual
b
7
(Normally closed)
(Normally open or double acting)
42
33
EN-IST-BBZP-0418
61
Instruction, Use and Maintenance Manual
b
8
42
108
9
50
b
10
2
b
2
11
b
2
14
62
EN-IST-BBZP-0418
Instruction, Use and Maintenance Manual
12
(BBYP - BBYR - BBYT)
d
12
50
156
13
13
120
50
157
d
50
156
15
d
14
50
157
45
d
16
45
57
d
33
47
47
45
17
d
168
45
168
EN-IST-BBZP-0418
63
Instruction, Use and Maintenance Manual
(DN125-150)
(BBZR - BBYR)
18
18
f
19
35
34
8
154
35
34
(BBZT - BBYT)
64
40
24
(82 - 94)
EN-IST-BBZP-0418
Instruction, Use and Maintenance Manual
20
17
9
20
(DN 125-150)
i
7
21
22
10
275
10
274
276
17
21
7
i
19
9
6
EN-IST-BBZP-0418
277
65
Instruction, Use and Maintenance Manual
17
Assembly of the BB ZP - BBZR - BBZT- BBYP - BBYR ­BBYT Diverters
2
1
1
14
10
85°C
94
H O
2
66
a b c
EN-IST-BBZP-0418
Instruction, Use and Maintenance Manual
3
276
17
277
(DN 125-150)
i
3
19
9
4
5
275
10
274
6
i
4
7
9
EN-IST-BBZP-0418
7
67
Instruction, Use and Maintenance Manual
6
(BBZT - BBYT)
40
24
7
40
24
(BBZR - BBYR)
f
7
68
34
8
(DN125-150)
35
154
35
34
EN-IST-BBZP-0418
Instruction, Use and Maintenance Manual
(BBYP - BBYR - BBYT)
d
8
168
45
168
d
11
d
9
47
45
47
d
12
10
d
45
57
1
2
1
45
33
EN-IST-BBZP-0418
69
Instruction, Use and Maintenance Manual
13
120
50
157
(BBYP - BBYR - BBYT)
d
13
14
14
15
1
50
156
1
d
15
1
d
70
157
50
50
1
156
EN-IST-BBZP-0418
Instruction, Use and Maintenance Manual
a
(BBZP - BBZR - BBZT - BBYP - BBYR - BBYT)
(72 - 76)
b
EN-IST-BBZP-0418
(BBZP M8-LLL)
(77 - 81)
71
Instruction, Use and Maintenance Manual
A
Assembly of the BB ZP - BBZR - BBZT- BBYP - BBYR ­BBYT Diverters
(BBZP M9-LLL)
c
16
a
17
18
42
108
(BBYP - BBYR - BBYT)
d
a
18
92
108
42
50
2
33
50
42
2
33
72
EN-IST-BBZP-0418
Instruction, Use and Maintenance Manual
(P.T.F.E.)
19
30
a
14
14
19
e
e
20
212
14
21
e
14
28
EN-IST-BBZP-0418
30
73
Instruction, Use and Maintenance Manual
22
a
23
a
74
(Normally closed)
(Normally open or double acting)
EN-IST-BBZP-0418
Instruction, Use and Maintenance Manual
24
a
25
a
2
33
1
92
(BBZP M9-LLL)
(Normally closed)
(Normally open or double acting)
EN-IST-BBZP-0418
75
Instruction, Use and Maintenance Manual
(BBZP M9-LLL)
c
26
2
(BBZT - BBYT)
1
33
(82 - 94)
76
EN-IST-BBZP-0418
Instruction, Use and Maintenance Manual

B Assembly of the BBZP M8-LLL Diverter

b
16
2
b
14
17
EN-IST-BBZP-0418
50
b
2
18
42
108
77
Instruction, Use and Maintenance Manual
b
19
20
b
2
42
33
(Normally closed)
(Normally open or double acting)
78
21
b
92
108
EN-IST-BBZP-0418
Instruction, Use and Maintenance Manual
22
b
23
b
213
51
94
2
b
24
33
92
(Normally closed)
EN-IST-BBZP-0418
(Normally open or double acting)
79
Instruction, Use and Maintenance Manual
b
26
2
33
80
EN-IST-BBZP-0418
Instruction, Use and Maintenance Manual

18 Pneumatic Valves BBZT - BBYT

NO. DESCRIPTION
23 Upper pin 24 Air connector 66 Piston 88 Grub screw
99 Cylinder 129 Pin 169 Sealing ring 170 Screw 171 Sealing ring 172 Sealing ring 173 Buffer 175 Bush 177 Elastic wire 204 Bush
EN-IST-BBZP-0418
81
Instruction, Use and Maintenance Manual
175
173
88
172
66
99
129
171
204
171
23
170
177
82
24
169
EN-IST-BBZP-0418
Instruction, Use and Maintenance Manual

19 Disassembly of the BBZT - BBYT

1 2
3 4
177
EN-IST-BBZP-0418
83
Instruction, Use and Maintenance Manual
5 6
175
173
88
7
8
129
84
EN-IST-BBZP-0418
Instruction, Use and Maintenance Manual
9 10
11 12 13
66
171
EN-IST-BBZP-0418
66
204
172
66
171
85
Instruction, Use and Maintenance Manual
24
14
16
15
170
170
99
169
99
17
23
(35)
86
EN-IST-BBZP-0418
Instruction, Use and Maintenance Manual

20 Assembly of the BBZT - BBYT

1 2
23
3 4
99 99
169
EN-IST-BBZP-0418
87
Instruction, Use and Maintenance Manual
5
170
99
24
6
88
EN-IST-BBZP-0418
Instruction, Use and Maintenance Manual
7
171
172
66
8
66
204
9
66
171
10
EN-IST-BBZP-0418
89
Instruction, Use and Maintenance Manual
11
12
13
129
90
EN-IST-BBZP-0418
Instruction, Use and Maintenance Manual
14
88
15 16
175
173
17
EN-IST-BBZP-0418
91
Instruction, Use and Maintenance Manual
18 19
177
20 21
92
EN-IST-BBZP-0418
Instruction, Use and Maintenance Manual
22
23
EN-IST-BBZP-0418
93
Instruction, Use and Maintenance Manual
FACSIMILE

21 Annexes

EC DECLARATION OF CONFORMITY
OF THE MACHINERY
(EC) 2006/42, Annex. II, p. 1 A
BARDIANI VALVOLE S.p.A.
Via G. di Vittorio 50/52 – 43045 Fornovo di Taro (Pr) – Italy
Declares
under its own responsibility that the machine:
GB - EC Declaration of conformity - A3-P-PRG-GB
Type: Model: Serial number: Function: Year of construction: Reference
complies with all relevant provisions of the following EC directives:
(EC) 2006/42 MACHINERY
and also comply with the following EC Directives and Regulations:
(EU) 2014/30 ELECTROMAGNETIC COMPATIBILITY DIRECTIVE (EMC)
and the following harmonized standards, rules and / or technical specifications applied:
EN ISO 12100:2010
REGULATION (EC) 1935/2004 and subsequent amendments and additions with regard to steel and elastomers in contact with the product
REGULATION (EC) 10/2011 and subsequent amendments and additions with regard to PTFE in contact with the product
P
NNEEUUMMAATTIICCVVAALLVVEES
P
Fluid handling 2016
S
A3-P-PRG-GB Ed. 1. Rev. 0
94
Fornovo di Taro 10/10/2016 ______________________________
Emanuela Bardiani
Legal representative
BARDIANI VALVOLE S.p.A..
Via G. di Vittorio 50/52
43045 Fornovo di Taro (Pr)
EN-IST-BBZP-0418
Instruction, Use and Maintenance Manual

22 2D diagram BBZP

DN125 - 150
EN-IST-BBZP-0418
DN125 - 150
PTFE Execution
22
95
Instruction, Use and Maintenance Manual

23 2D diagram BBZP M8-LL

96
PTFE Execution
22
EN-IST-BBZP-0418
Instruction, Use and Maintenance Manual

24 2D diagram BBZP P7-LL

EN-IST-BBZP-0418
PTFE Execution
22
97
Instruction, Use and Maintenance Manual

25 2D diagram BBZR

98
PTFE Execution
22
EN-IST-BBZP-0418
Instruction, Use and Maintenance Manual

26 2D diagram BBZT

EN-IST-BBZP-0418
22
99
Instruction, Use and Maintenance Manual

27 2D diagram BBYP

100
PTFE Execution
22
22
EN-IST-BBZP-0418
Loading...