Baicells Technologies SBS81040 User Manual

04
Nova-246 Outdoor Base Station
All rights reserved © Baicells Technologies Co., Ltd.
Nova-246 Outdoor LTE Base Station Installation Guide
Date
Version
Description
10 July, 2018
01
Initial Released.
15 Aug, 2018
02
Optimize the structure of the document.
15 Aug, 2018
03
Add new models.
18 Oct., 2019
04
Change LED indicators and description.
Baicells Technologies Co., Ltd.
Address:
3F, Hui Yuan Development Building, No.1 Shangdi Information Industry Base, Haidian Dist., Beijing, China, 100085
E-mail: support_cn@baicells.com (Non-North America region)
support_na@baicells.com (North America region)
Website:
http://www.baicells.com/
About This Document
This document is a guidance of Nova-246 hardware installation for installation personnel, including the preparation of installation tools and supporting materials, the demands for installation environment, installation procedure, cable connection and power on.
Accomplish the installation of the device according to this guide, the installation personnel can avoid potential damage to the device during the installation procedure, which makes sure the subsequent good running of the device.
This document suit for the models of sBS series base stations.
Copyright Notice
Baicells copyrights this specification. No part of this specification may be reproduced in any form or means, without the prior written consent of Baicells.
Disclaimer
This specification is preliminary and is subject to change at any time without notice. Baicells assumes no responsibility for any errors contained herein. For more information, please consult our technical engineers.
Disposal of Electronic and Electrical Waste
Pursuant to the WEEE EU Directive, electronic and electrical waste must not be disposed of with unsorted waste. Please contact your local recycling authority for disposal of this product.
Revision Record
Contact Us
Nova-246 Outdoor Base Station Installation Guide
Table of Contents
1. Product Overview ......................................................................................................... 1
Introduction ........................................................................................................... 1 1.1
Features ................................................................................................................. 1 1.2
Appearance ............................................................................................................ 2 1.3
1.3.1 FDD Models ..................................................................................................... 2
1.3.2 TDD Models .................................................................................................... 4
Technical Specification............................................................................................ 7 1.4
1.4.1 Hardware Specification ................................................................................... 7
1.4.2 Software Specification ..................................................................................... 7
1.4.3 Environment Specification ............................................................................... 9
1.4.4 Model List ....................................................................................................... 9
2. Installation Preparation ............................................................................................ 10
Support Materials ............................................................................................... 10 2.1
Installation Tools ................................................................................................ 10 2.2
Installation Environment....................................................................................... 11 2.3
2.3.1 Locational Requirements ............................................................................... 11
2.3.2 Environmental Requirements ........................................................................ 11
Personnel Requirements ....................................................................................... 11 2.4
Against Lightening and Grounding Protection ....................................................... 11 2.5
Weatherproof Protection ..................................................................................... 12 2.6
3. Base Station Installation ............................................................................................. 13
Unpacking............................................................................................................ 13 3.1
Installation Procedure ........................................................................................ 13 3.2
Install GPS Antenna .............................................................................................. 13 3.3
Install on Pole ....................................................................................................... 14 3.4
Install on Wall ....................................................................................................... 16 3.5
Connect Cable ...................................................................................................... 16 3.6
Nova-246 Outdoor LTE Base Station Installation Guide
3.6.1 Requirement for Cable Laying........................................................................ 16
3.6.2 Connect GPS Antenna.................................................................................... 17
3.6.3 Connect RF Cable .......................................................................................... 17
3.6.4 Connect Optical Fiber .................................................................................... 17
3.6.5 Connect Ethernet Cable ................................................................................. 18
3.6.6 Connect Power Connector ............................................................................. 18
3.6.7 Connect Ground Cable .................................................................................. 19
Install Antenna Feeder System .............................................................................. 19 3.7
3.7.1 Install Omnidirectional Antennas ................................................................... 19
3.7.2 Install Directional Antennas ........................................................................... 21
4. Power On.................................................................................................................... 23
A.1 Regulatory Compliance ........................................................................................ 24
Nova-246 Outdoor Base Station Installation Guide
List of Figures
Figure 1-1 Nova-246 FDD Appearance ........................................................................ 2
Figure 1-2 Nova-246 FDD Interfaces and Indicators ................................................... 3
Figure 1-3 Nova-246 TDD Appearance ........................................................................ 4
Figure 1-4 Nova-246 TDD Interfaces and Indicators (1) .............................................. 5
Figure 1-5 Nova-246 TDD Interfaces and Indicators (2) .............................................. 5
Figure 3-1 Installation Procedure of Nova-246 .......................................................... 13
Figure 3-2 Location of Grounding Screws.................................................................. 19
Figure 3-3 Omnidirectional Antenna Installation (1) ................................................... 20
Figure 3-4 Omnidirectional Antenna Installation (2) ................................................... 20
Figure 3-5 Assembling Procedure of Directional Antennas ....................................... 21
Figure 3-6 Transportation the Antennas in the Height ............................................... 21
Figure 3-7 Directional Antenna Installation ................................................................ 22
Figure 4-1 LED Indicators........................................................................................... 23
List of Tables
Table 1-1 Nova-246 FDD Interface Description ........................................................... 3
Table 1-2 Nova-246 FDD Interface Indicators .............................................................. 3
Table 1-3 Nova-246 TDD Interface Description (1) ...................................................... 6
Table 1-4 Nova-246 TDD Interface Description (2) ...................................................... 6
Table 1-5 Nova-246 TDD Interface Indicators .............................................................. 6
Table 2-1 Support Materials ....................................................................................... 10
Table 2-2 Environmental Requirements ..................................................................... 11
Nova-246 Outdoor Base Station Installation Guide
1. Product Overview
Introduction 1.1
Baicells Nova-246 is a type of high performance outdoor macro base station based on LTE technology, which offers multiple models to support different TDD and FDD frequency bands. Also TDD models support dual carriers (DC) to satisfy the demands of higher speed and system capacity. The Nova-246 supports wired backhaul connections to backbone networks, and provides LTE access to user terminals, implemented voice and data service transmissions.
The Nova-246 makes use of the current transmission resources to reduce the operator’s investment, implement the low-cost construction of LTE networks and enhance indoor coverage, thereby providing high-speed broadband access for users in assembly occupations.
The Nova-246 can be widely used by telecom operators, broadband operators, enterprises, and so on.
Features 1.2
Adopt compact integrated design of baseband and RF to suit for private and public
scenarios.
Excellent Non-Line of Sight (NLOS) coverage performance to offer broader
coverage.
For TDD models, support two carriers, and software upgradable to two CC carrier
aggregation.
Based on 3GPP technology; provide high speed data service.
For FDD models, support peak rate of DL: 150Mbit/s, UL: 50Mbit/s with 20MHz
spectrum.
For TDD models, support peak rate of DL: 220Mbit/s, UL: 14Mbit/s with 20MHz
spectrum.
For FDD models, maximum 256 concurrent users.  For TDD models, maximum 192 concurrent users per eNodeB.  Support 5MHz/10MHz/15MHz/20MHz operation bandwidth.  Any IP based backhaul can be used, including copper (RJ-45), optical port and
public transmission, flexible to deploy.
1
Nova-246 Outdoor LTE Base Station Installation Guide
Support RED function AISG 2.0.  Security services to provide timely protection against potential security risks and
illegal intrusion.
Support simple and convenient local and remote web management.  Integration as required, easy to installation and deployment, accurate
coverage and improved network capacity.
Support network management functions, which includes the management,
monitoring and maintenance.
Smooth evolution to C-RAN architecture, which support centralized scheduling for
better networking performance, with Baicells’ central network unit (CNU).
Appearance 1.3
1.3.1 FDD Models
The appearance of Nova-246 FDD base station is shown in Figure 1-1.
Figure 1-1 Nova-246 FDD Appearance
The interfaces and indicators Nova-246 FDD base station are shown in Figure 1-2.
2
Nova-246 Outdoor LTE Base Station Installation Guide
Interface Name
Description
PWR
Power interface: -48V (-57V to -42V) DC
GPS
External GPS antenna, N-female connector.
ANT0
External antenna 0, MIN-DIN female connector.
ANT1
External antenna 1, MIN-DIN female connector.
OPT
Optical interface, connect to external transmission network, used for data backhaul.
ETH
RJ-45 interface, used for debug or data backhaul.
SNF
Sniffer for network listening, N-female connector.
Identity
Color
Status
Description
PWR
Green
Steady On
Power On
Figure 1-2 Nova-246 FDD Interfaces and Indicators
The Nova-246 FDD interfaces are described in Table 1-1.
Table 1-1 Nova-246 FDD Interface Description
The Nova-246 FDD interface indicators are described in Table 1-2.
Table 1-2 Nova-246 FDD Interface Indicators
3
Nova-246 Outdoor LTE Base Station Installation Guide
OFF
No Power Supply
RUN
Green
Steady On
Reserved
Fast flash: 0.125s on,0.125s off
The board is loading.
Slow flash: 1s on,1s off
The board is running. OFF
No power input or board fault
ACT
Green Steady On
The transmitting channel works normally
OFF
The transmitting channel works abnormally
ALM
Red Steady On
Hardware alarm, e.g. VSWR alarm
OFF
No alarm
1.3.2 TDD Models
The appearance of Nova-246 TDD base station is shown in Figure 1-3.
Figure 1-3 Nova-246 TDD Appearance
The interfaces and indicators of Nova-246 TDD base station are shown in Figure 1-4 and Figure 1-5.
4
Loading...
+ 21 hidden pages