![](/html/f6/f6e4/f6e42e2b343efb191dac456f8f94be17629ceb7e1aa95be7f8cfbee845b87c02/bg1.png)
INSTALLATION MANUAL
NEBULON
© 2015 Aveo Engineering Group, s.r.o. All rights reserved. The informa tion contained within this document
must not be discl ose d, copi ed or reproduced in whole or in part without prior written permission from
Engineering Gro up, s.r .o.
agreed by
Aveo Engineering Group, s.r.o.
TM
DOC.NO: AVE-WP-51G-IM
Aveo
Distribution of this document shall only be as stated in Table 02 unles s o t he rwi se
![](/html/f6/f6e4/f6e42e2b343efb191dac456f8f94be17629ceb7e1aa95be7f8cfbee845b87c02/bg2.png)
Installation Manual
Issue 03
Nebulon AVE-WP-51G-IM
Part 0 Manual Administration
0.1 Table of Contents
PART 0
0.1 TABLE OF CONTENTS 2
0.2 DOCUMENT APPROVAL 3
0.3 AMENDMENT RECORD PROCEDURE 3
0.4 EFFECTED PAGES PROCEDURE 4
0.5 DISTRIBUTION LIST 4
1. NEBULON™ 5
2. OPERATING INSTRUCTIONS 5
3. INSTALLATION SCHEMATIC / WIRING DIAGRAM 6
4. CONTROL & POWER INPUT’S: 6
5. TECHNICAL SPECIFICATION 6
6. TECHNICAL DRAWING 7
MANUAL ADM IN IS T RATION 2
7. WIRING CHART 7
8. EQUIPMENT LIMITATION 8
9. TESTING OF THE LIGHT BEFORE INSTALLATION 8
10. CARE AND CLEANING OF YOUR AVEO ENGINEERING AVIATION LIGHTS 9
11. NOTES ON INSTALLATION 9
12. CONTINUED AIRWORTHINESS INFORMATION 9
_______________________________________________________________________________________________________________________
Page 2 of 10
![](/html/f6/f6e4/f6e42e2b343efb191dac456f8f94be17629ceb7e1aa95be7f8cfbee845b87c02/bg3.png)
New Technical drawing with higher clearance in
Installation Manual
Issue 03
Nebulon AVE-WP-51G-IM
0.2 Document approval
This document has been established in accordance with an alternative procedure to DOA approved
under EASA AP429.
This installation manual is according EASA ETSO [Authorization number] and applicable for part number
AVE-WPR-51G-401 and AVE-WPG-51G-402.
Compiled by: 3. – Jul - 2017
Petr Jaroš
Engineer, Aveo Engineering Group, s.r.o.
Approved by: 3. – Jul - 2017
Georg Hartl
Head of DO, Aveo Engineering Group, s.r.o.
0.3 Amendment Record procedure
The master copy of this document shall be kept electronically as a read only
document under the control of Aveo Engineering Group, s.r.o. as Master Copy.
ALL amendments to this manual will initiate a raise of Issue
ALL raises of issue will be given a sequential Alphabetic Issue Ident sequentially
from 01 to 99 in Table 01 - Issue No: Column– Initial Issue of Document will
be “01”
ALL Issues of this document will be approved by Head of DO
No.
02
03
_______________________________________________________________________________________________________________________
Page 3 of 10
Voltage values changed, Technical Sp e c ific ation
attaching holes (not marked), spec of installing
Details Date
20.Jul.2015
upgraded
3.Jul. 2017 7 & 9
screws added
Pages
2
5, 6 & 8