Avaya X330F2 Installation Manual

Avaya
Avaya X330F2 Installation Guide
The Avaya X330F2 Expansion sub-module provides two fiber Fast Ethernet 100Base-Fx ports.
Installing the Expansion Sub-module in the Avaya P330
1 Remove the blanking plate or other sub-module (if installed). 2 Insert the sub-module gently into the slot, ensuring that the Printed Circuit
Board (PCB) is aligned with the guide rails. The PCB not the metal base plate fits into the guide rail.
3 Press the sub-module in firmly until it is completely inserted into the
Avaya P330.
4 Gently tighten the two screws on the front panel of the expansion sub-module
by turning the screws.
Caution: The expansion sub-modules contain components sensitive to electrostatic discharge. Do not touch the circuit board unless instructed to do so.
Removing an Existing Expansion Sub-module
1 Loosen the screws by turning the knobs. 2 Grasp the two knobs one near each side of the front panel, and pull gently but
firmly towards yourself.
3 Insert another expansion sub-module or the blanking plate.
Note: The Avaya P330 switch must not be operated with the expansion slot open; the expansion sub-module should be covered with the supplied blanking plate if necessary.
Note: X330F2 sub-modules are hot swapable and can be inserted or removed in an operating base unit.
Catalog No. 130102 Rev. B June 2001 1
Avaya X330F2 Installation Guide
Cabling
A fiber optic cable may be connected to either of the 100Base-FX ports, via a pair of SC connectors. The maximum fiber cable length connected to a 100Base-FX port is 412 m (1,352 ft) when operating in half duplex, and 2 km (6,562 ft.) when operating in full duplex, over MMF.
Fiber optic cable should be MMF cable, 62µm or 50µm.
Please refer to the P330 User’s Guide for more detailed information.
Avaya.com
All trademarks, registered trademarks, service names, product and/or brand names are the sole property of their respective owners.
Copyright © 2001, Avaya Inc. All rights reserved.
2 Avaya X330F2 Installation Guide
Loading...