Rear Stone Grid
Left Stone Tab
Pilot Stone Tab
Right Stone Tab
(2) 8-32 x 3/8” Screws
Front Stone Grid
(3) Bags of glass (2.5 lbs. each)
Compatibility
564 HO with Diamond-Fyre Burner
Installation Tips
(sku 94700730)
Install the stones after the firebacks and stone grid are in place.
Stone Grid Installation
1. Place the front stone grid upside down on a non-scratching surface. Insert the left stone tab from
below through the slot as shown below. Secure the tab with one of the included screws.
Each stone has a number etched into and a slot. Place the stones onto the stone grid,
matching the number on the stone to the number on the grid. EXAMPLE: Stone marked “3”
is inserted over the tab marked “3” on the stone grid.
NOTE: Numbers on the stones always face the rear of the firebox.
1. Starting with stone number 1, place the stones in numerical order on the stone grid, paying close
attention to the notch/tab alignment and making sure the numbers face the rear of the firebox.
The stone placement sequence is shown below.
2. Carefully pour the glass around the floor of the firebox, as shown below. Now we are working with
your inner artist. Here you must pay attention to create the best possible look. For hard to reach
areas, you can use a teaspoon to ensure all the black surfaces are covered.
The completed installation should look like the photos below.
(sku 94700730)
3. The pilot area must be kept clear of glass to provide quick burner ignition.