Atmos InterCombi HE32 Installation & Servicing Instructions Manual

Atmos
InterCombi
Installation & Servicing Instructions for HE32
Atmos Heating Systems
West March
Daventry
Northants, NN11 4SA
Tel: 01327 871990
Fax: 01327 871905
e-mail: sales@atmos.co.uk
internet: www.atmos.co.uk
Issue 01.11.11 (Main revision)
2
© 2011 Atmos Heating Systems
The information provided applies to the product in the standard model. Atmos Heating Systems can therefore not be held liable for any damage resulting from the product specifications that deviate from the standard model.
The information provided has been compiled with the utmost care. However, Atmos Heating Systems cannot be held liable for any faults in the information nor for the consequences thereof. Atmos Heating Systems cannot be held liable for any damage resulting from the activities carried out by third parties.
To be changed without prior notice
Building Regulations and the Benchmark Checklist
Building Regulations (England & Wales) require notification of the installation of a heating appliance in a dwelling to the relevant Local Authority Building Control Dept. This can be achieved via a Competent Persons Self Certification Scheme as an option to notifying the Local Authority directly. Similar arrangements apply in Scotland and Northern Ireland. Atmos Heating Systems is a member of the Benchmark Scheme and the Benchmark Checklist is included at the back of these Instructions. The Benchmark Checklist provides a Commissioning Checklist and Service Record to be completed by the Installer/ Service Engineer.
Benchmar
k places responsibilities on both manufacturers and installers.
The purpose is to ensure that customers are provided with the correct equipment for their needs, that it is installed, commissioned and serviced in accordance with the manufacturer’s instructions by competent persons and that it meets the requirements of the appropriate Building Regulations. The Benchmark Checklist can be used to demonstrate compliance with Building Regulations and should be provided to the customer for future reference.
Installers are required to carry out installation, commissioning and servicing work in accordance with the Benchmark Code of Practice which is available from the Heating and Hotwater Industry Council who manage and promote the Scheme. Refer to www.centralheating.co.uk for more information.
3
TABLE OF CONTENTS
1. Safety Regulations 7
1.1 General ....................................................................................................................................................................... 7
1.2 CH system ................................................................................................................................................................... 7
1.3 Gas system ................................................................................................................................................................. 7
1.4 Electrical system ......................................................................................................................................................... 7
1.5 Domestic water system ............................................................................................................................................... 7
1.6 Flue discharge and air supply ..................................................................................................................................... 7
2. Description of the Appliance 8
2.1 General ....................................................................................................................................................................... 8
2.2 Operation .................................................................................................................................................................... 8
2.3 Operating conditions ................................................................................................................................................... 8
2.4 PC interface .............................................................................................................................................................. 10
2.5 Test programmes ...................................................................................................................................................... 11
3. Main Components 12
3.1 Accessories ............................................................................................................................................................... 13
4. Installation 14
4.1 Overall dimensions .................................................................................................................................................... 14
4.2 Unpacking the appliance ........................................................................................................................................... 15
4.3 Additional dimensions ............................................................................................................................................... 15
4.4 Boiler location ............................................................................................................................................................ 16
4.5 Mounting and General Information ............................................................................................................................ 17
4.6 Mount the appliance .................................................................................................................................................. 18
4.7 Fit the pipework cover (optional item) ....................................................................................................................... 18
4.8 Condensate disposal ................................................................................................................................................. 19
5. Connections 20
5.1 Connect the CH system ............................................................................................................................................ 20
5.2 Hot water system ...................................................................................................................................................... 21
5.3 Connecting the gas supply ........................................................................................................................................ 22
5.4 Electrical connection ................................................................................................................................................. 22
5.5 General Flue Requirements ...................................................................................................................................... 25
5.6 Flue discharge and air supply ................................................................................................................................... 26
5.7 Roof outlet prefabricated chimney............................................................................................................................. 32
5.8 Atmos MS System ..................................................................................................................................................... 33
5.9 Atmos Communal Flue System (CFS) ...................................................................................................................... 34
6. Commissioning 35
6.1 Fill and de-aerate the appliance and the system ....................................................................................................... 35
6.2 Commissioning of the appliance ............................................................................................................................... 36
6.3 System Shutdown ..................................................................................................................................................... 37
7. Setting and Adjustment 38
7.1 Directly via operating panel ....................................................................................................................................... 38
7.2 Settings through the service code ............................................................................................................................. 38
7.3 Parameters ................................................................................................................................................................ 39
7.4 Setting maximum CH power...................................................................................................................................... 40
7.5 Setting pump position ................................................................................................................................................ 40
7.6 Weather-dependent control ....................................................................................................................................... 41
7.7 Conversion to other gas type .................................................................................................................................... 41
7.8 Gas-air control ........................................................................................................................................................... 41
7.9 Setting gas-air control ............................................................................................................................................... 42
7.10 Carbon monoxide : carbon dioxide ratio (CO/CO2 ratio) ........................................................................................... 43
8. Faults 44
8.1 Display last fault code. .............................................................................................................................................. 44
8.2 Burner does not ignite ............................................................................................................................................... 45
4
8.3 Burner ignites with much noise ................................................................................................................................. 45
8.4 Burner resonates ....................................................................................................................................................... 46
8.5 No heating (CH) ........................................................................................................................................................ 46
8.6 Reduced output ......................................................................................................................................................... 47
8.7 CH does not reach the correct temperature .............................................................................................................. 47
8.8 No hot water (HW) .................................................................................................................................................... 47
8.9 Hot water does not reach the correct temperature .................................................................................................... 48
9. SERVICING THE BOILER AND COMPONENT REPLACEMENT 49
9.1 SERVICING THE BOILER ........................................................................................................................................ 49
9.2 COMPONENT REPLACEMENT ............................................................................................................................... 50
10. Technical Specifications 54
10.1 Electrical diagram ...................................................................................................................................................... 55
11. CE Declaration 56
NOTE The Benchmark Checklist & Service Record are included at the back of the Manual.
5
This manual
Using this manual you can safely install and maintain this appliance. Carefully follow the instructions.
In case of doubt, contact Atmos Heating Systems. Keep these instructions near the appliance.
Abbreviations and names used
Description
To be referred
to as
High Efficiency
HE
Atmos InterCombi wall
-
mounte
d gas heater
Appliance
Appliance with piping for central heating
CH system
Appliance with piping for domestic water
HW system
Icons
The following symbols are used in this manual:-
CAUTION
Procedures that, when not carried out with due care, may result in damage to the product or the environment or in personal injury.
Service and technical support
For information about specific adjustments, installation, maintenance and repair activities, please contact:
Atmos Heating Systems, West March, DAVENTRY, Northants, NNII 4SA Tel: 01327 871990; fax: 01327 871905 Email: sales@atmos.co.uk; internet: www.atmos.co.uk
Environment
When the appliance needs replacement, your installer may
arrange for disposal. Should this not be possible, then make enquiries with your local council about the possibilities for re-use or environmental-friendly processing of the materials used, or contact a scrap dealer about disposal.
Various plastics and metals have been used in producing the appliance. Also, the appliance contains electronic components that are electronic waste.
Intended use
The appliance as described in this documentation is intended for heating rooms with a central heating system and/or for supplying hot water. Any other use is outside the scope of intended use for this appliance. Any liability for damage resulting from improper use shall not be accepted.
6
Atmos Warranty – Short version
1. Atmos Warranty covers any material, construction or operation faults that are found to be of original manufacturing origin. A full statement of the Atmos Warranty can be found on www.atmos.co.uk.
2. Atmos boiler warranty is two years from date of invoice or 12 months from date of installation, whichever is the later. This warranty covers the cost of replacement parts and associated labour. However the ignition & ionisation probe and the glass fuse are excluded from this warranty. The warranty for the heat exchanger is 10 years in total, but this covers the cost of associated labour only for the first two years from date of invoice.
3. There is no carriage charge for the delivery of replacement parts covered by the warranty. Any alleged faulty part must be returned to Atmos carriage prepaid. Carriage will be credited if the fault is found to be a manufacturer’s fault.
4. The serial number of the boiler must be supplied with any warranty claim.
5. All products must be used in an appropriate application and manner. This includes, but is not limited to, correct boiler sizing, system design, system cleansing and use of corrosion inhibitors. If the boiler installed is a combi boiler, an approved water conditioner device must be fitted in areas where the water hardness exceeds 200ppm, as required by Building Regulations.
6. The Benchmark Checklist & Service Record, found in the back of the installation Instructions, must be filled in. Failure to install and commission according to the manufacturer’s instructions and complete the Benchmark Commissioning Checklist invalidates the warranty.
7. The Warranty card must be completed and the signed Atmos copy must be received within 14 days of installation together with a copy of the Benchmark Commissioning Checklist, completed by the installer. By signing the Warranty card the buyer agrees that the goods have been delivered in a satisfactory condition.
Exceptions
8. In the event of full payment for a product not being received, Atmos shall be discharged from all further contractual or warranty obligations.
9. Surface and/or transport damage are outside the scope of this warranty.
10. Any warranty provision shall not apply if Atmos determines that the fault is due to improper application, use, neglect, accidental damage or injudicious treatment, non-observance of instructions contained in Atmos Manuals or due to improper repair, adjustment, installation or maintenance or due to work carried out by unqualified engineers. The warranty also lapses if the Atmos boiler has not had a yearly service in accordance with instructions.
11. This warranty shall not apply if the fault is caused by scale, failure or abnormality of gas or water supply, or impact of any external influence that adversely affects the normal operation of the product. This shall include but not be restricted to dehydration, abnormal or high voltage, and hard water.
12. Excluded parts are the ignition & ionisation probe and the glass fuse as these are subject to wear and tear in normal use.
Loading...
+ 14 hidden pages