A. INTRODUCTION
Congratulations on choosing the Atlas™ Triton Series™
high ef ciency boiler! The Triton Series™ combines solid
engineering and innovative design with all the quality and
features you would expect from a company with a proud
100 year tradition of building safe, reliable, high quality
products in the USA.
Your Triton boiler is E.T.L. tested, certi ed and listed and
is constructed and stamped in accordance with Section IV
of the ASME Code. The boiler is also AHRI IBR Listed per
BTS 2000.
A.1. STANDARD FEATURES & BENEFITS
A.1.a. Compact Water Tube Design
The Triton is a compact, vertically red water tube boiler
utilizing a double row, high nned copper tube design to
maximize ef ciency while minimizing the boiler footprint.
The gasketless cast iron headers are a 4-pass con guration.
A.1.b. Quality Construction Built in the USA.
Triton Series™ boilers are 100% designed and manufactured in the USA in accordance with ASME Code Section
IV. The nest quality components are used for many years
of trouble free service.
A.1.c. Advanced Pre-mix Gas Delivery and
Combustion System
Triton Series™ boilers provide clean, ef cient combustion
with very low emission levels. The gas delivery system is
powered by a combustion blower which forces air and gas
into the venturi which pre-mixes the gas before entering
the combustion chamber. The Triton burner is a knit metal
alloy ber design which optimizes heat transfer, minimizes
surface temperatures, and is resistant to clogging.
A.1.f. Ease of Installation and Maintenance
Triton Series™ boilers include a heavy steel base with pallet jack access for ease of installation and movement. Routine maintenance and service are made simple with easy
access to all components front and rear. The entire heat
exchanger is easily removable and replaceable using hand
tools only, without performing welding or cutting operations
and without the use of gaskets.
A.1.g. Smart Boiler Control System
Triton Series™ boilers are factory equipped to accept the
Triton Series™ boilers are factory equipped to accept the
accessory Smart Boiler Control System™. The Ace Heating
accessory Smart Boiler Control System™. The Ajax Boiler
Solution, LLC proprietary Smart Boiler Control is a web-based
Inc. proprietary Smart Boiler Control is a web-based system
system providing 24/7 access to the boilers operational
providing 24/7 access to the boilers operational perfor-
performance from any computer or smart phone with an internet
mance from any computer or smart phone with an internet
connection. The system allows personnel to conveniently
connection. The system allows personnel to conveniently
monitor critical boiler information including inlet/ outlet
monitor critical boiler information including inlet/ outlet
and much more can be easily accessed and analyzed, to
and much more can be easily accessed and analyzed, to
maximize boiler performance and safety
maximize boiler performance and safety.
A.2. MISCELLANEOUS
This manual covers installation, maintenance, and operat-
This manual covers installation, maintenance, and operating
ing instructions for Atlas™ Triton Series™ High Efciency
instructions for Atlas™ Triton Series™ High Efficiency
hot water boilers. Please review the entire manual carefully
hot water boilers. Please review the entire manual carefully
before installation or operation, and keep it in legible condi-
before installation or operation, and keep it in legible
tion with the boiler at all times for reference. If this manual
condition with the boiler at all times for reference. If this
is misplaced or lost, check the Ajax Boiler Inc. website,
manual is misplaced or lost, check the Ace Heating
www.ajaxboiler.com to print an electronic copy or contact
Solutions, LLC. website, www.aceheatingllc.com to print an
your local Ajax Boiler Inc. representative.
electronic copy or contact your local Ace Heating Solutions,
LLC. representative. The following terms and signs are used
The following terms and signs are used throughout this
throughout this manual to bring attention to the presence of
manual to bring attention to the presence of hazards of
hazards of various risk levels, or to important information
various risk levels, or to important information concerning
concerning product life.
product life.
DANGER:
!
A.1.d. Controls
The Triton Series™ uses the advanced Honeywell SOLA
control system and high-resolution color LCD touch screen
Operator Interface display. This system provides the user
clear, quick and easy access to all of the system’s features
and capabilities from a single, user-friendly interface. Up
to 8 Triton Series™ boilers can be operated in a lead-lag
installation using standard controls.
A.1.e. Heavy Duty, Solid Steel Cabinet
Triton Series™ boilers include a solid, 18 gauge steel cabinet. The cabinet is nished inside and out with a tough UV
rated, outdoor quality powder coat paint.
Indicates an imminently hazardous situation
which, if not avoided, will result in death, serious
injury or substantial property damage.
!
WARNING:
Indicates a potentially hazardous situation which,
if not avoided, could result in death, serious injury
or substantial property damage.
A 2
CAUTION:
!
Indicates a potentially hazardous situation which,
if not avoided, may result in moderate or minor
injury or property damage.
!
NOTE:
Indicates special instructions on installation,
operation, or maintenance which are important
but not related to personal injury hazards.
WARNING: If the information in this
manual is not followed exactly, a
re or explosion may result causing
property damage, personal injury or
loss of life.
- Do not use or store gasoline or other
ammable vapors and liquids in the
vicinity of this or any other appliance.
- WHAT TO DO IF YOU SMELL GAS
• Do not try to light any appliance
• Do not touch any electrical switch;
do not use any phone in your
building.
• Immidiately call your gas supplier
from a neighbors phone. Follow
the gas suppliers instructions.
• If you cannot reach your gas supplier, call the re department.
- Installation and service must be performed by a quali ed installer, service agency or the gas supplier.
Touch Screen
T-200
Control Display
Front Door
Panel
Gas Inlet
Valv e
Return Water
Inlet
Front Panel Rear Panel
Pallet Jack
Base
Rear Door
Panel
Pressure
Flow
Switch
Hot Water
Outlet
Condensate
Drain
Relief
Valv e
Combustion
Main System
FRONTREARSIDE
Temp./
Pressure
Gauge
Manifold
Side Panel (L)
Flue
Collar
Air Inlet
Drain
Gas
Inlet
Valv e
Figure A.1.1. Features and Components
B 3
A
B. PRE-INSTALLATION
B
T
ce Heating Solutions, LLC. strongly recommends that this
Ajax Boiler Inc. strongly recommends that this manual be
manual be
reviewed thoroughly before installing your Triton Series™
reviewed thoroughly before installing your Triton Series™
high efciency boiler. The factory warranty does not apply
high efficiency boiler. The factory warranty does not apply
to boilers that have been improperly installed or operated
to boilers that have been improperly installed or operated
(Refer to the warranty in chapter 8). If, after reviewing this
(Refer to the warranty in chapter 8). If, after reviewing this
manual, you still have questions not covered in this manual,
manual, you still have questions not covered in this
please contact the manufacturer or your local Ajax Boiler
manual,
Inc. representative.
please contact the manufacturer or your local Ace Heating
Solutions, LLC representative.
This section is intended to provide guidance in planning,
This section is intended to provide guidance in planning,
design, construction and preparing the space prior to physi-
design, construction and preparing the space prior to
cal installation of the boiler, its venting, and the necessary
physical
electrical and plumbing connections.
installation of the boiler, its venting, and the necessary
electrical and plumbing connections.
!
NOTE:
The installation must conform to the requirements of the
authority having jurisdiction or, in the absence of
A
S
R
P
H
G
F
E
C
Q
REARSIDE
M
N
L
K
D
J
Figure A.2. Dimensions
such requirements, to the National Fuel Gas Code, ANSI
Z223.1/NFPA 54, and/or Natural Gas and Propane
Installation Code, CAN/CSA B149.1.
The boiler must not be installed on carpeting.
Local and state codes requiring greater clearances supersede these minimum clearances.
• Multiple appliances may be installed side by side with
6” clearance between adjacent appliances to allow
suf cient air for the pilot blower. It is recommended to
maintain 16” clearance between adjacent boilers to
allow access for service to the rear of the unit.
• The minimum clearance between a Triton Series™
boiler and a storage tank is 6”. For alcove installations, the minimum clearance to combustible construction is 6” to side, 24” to rear walls and 22” from
top of the unit to the ceiling. The front alcove shall
remain open. This will allow boiler to be serviced in its
location without movement or removal of the unit.
B.1. DETERMINING UNIT LOCATION
The boiler should be mounted on a level, structurally sound
surface. The boiler is not approved for mounting on a
combustible surface and Gas fueled equipment installed
in enclosed parking garages must be located at least 18”
above the oor.
A: Total Height
B: Total Width
C: Base Height
D: System Drain Height
E: Condensate Drain Ht.
F: Air Intake Height
G: Flue Collar Height
H: Inlet/ Outlet Height
J: Syst. Drain Clearance
K: Air Intake Clearance
L: Flue Collar Clearance
M: Gas Valve Clearance
N: Manifold Clearance
P: Inlet/ Outlet Clearance
Q: Drain/ Flue Center
R: Air Intake Center
S: Gas Valve Height
T: Gas Valve Center
The optimal location for the boiler is as close to an exterior
MODEL
T-80T-100 T-150 T-200
60 11/16 60 11/16 68 11/16 76 11/16
31 1/231 1/231 1/231 1/2
3 3/83 3/83 3/83 3/8
2 1/42 1/42 1/42 1/4
10 11/16 10 11/16 10 11/16 10 11/16
15 11/16 15 11/1616 3/416 3/4
20 7/1620 7/162223 15/16
32 13/16 32 13/16 40 13/16 48 13/16
4 5/84 5/84 5/84 5/8
1111
7 1/87 1/87 1/87 1/8
6 3/86 3/86 3/86 3/8
12 3/412 3/412 3/412 3/4
16161616
15 3/415 3/415 3/415 3/4
6 11/166 11/166 11/166 11/16
39 7/839 7/847 7/855 7/8
9 15/169 15/169 15/169 15/16
Table A.2. Triton Dimensions (inches).
All measurements are approximate and subject to change.
wall as possible to reduce vent loss and to minimize costly
stainless steel ue venting. Maintain minimum speci ed
clearances for adequate operation. All installations must
allow suf cient space behind the boiler to service vent connections, water pipe connections, piping and other auxiliary
equipment, as well as the appliance.
MODEL
Top Clearance:18”18”18”18”
Front Clearance:36”36”36”36”
Side Clearance:6”6”6”6”
Bottom Clearance:0”0”0”0”
Figure B.1.1. Triton Minimum Clearances Chart.
T-80T-100 T-150 T-200
B 4
CAUTION:
!
• Locate the unit so that the condensate can be treated
and piped to meet city and local code requirements.
• The boiler shall be installed such that the gas ignition
system components are protected from water (dripping, spraying, rain, etc.) during boiler operation or
service (circulator replacement, control replacement,
etc.)
• Keep the area around the unit(s) free from combustibles and ammable liquids.
• It is highly recommended that you allow suf cient
space in front and the rear of the unit for replacement
and adjustment of all parts requiring such attention.
B.1.a. Outdoor Installations (Optional)
CAUTION:
!
Triton Series™ boilers are available for certi ed outdoor
installations.
• Boilers must not be installed under an overhang that
is less than 3’ from the top of the vent terminal.
• Three sides must be open in the area under the
overhang.
• Roof water drainage must be diverted away from
boiler(s) installed under overhangs.
B.1.b. Installations at Elevation.
Rated inputs are suitable for up to 2,000 ft.. elevation
without de-rating. Consult the factory for installations over
2,000 ft.. above sea level. No hardware changes are required to the unit. (Adjustments may be required).
B.2. CONNECTION INFORMATION
!
NOTE:
The boiler, when used in connection with a refrigeration
system, must be installed so the chilled
medium is piped in parallel with the boiler with appropriate valves to prevent the chilled medium from
entering the boiler.
The boiler piping system of a hot water boiler connected
to heating coils located in air handling
units where they may be exposed to refrigerated air circulation must be equipped with ow control valves
or other automatic means to prevent gravity circulation of
the boiler water during the cooling cycle.
All plumbing and electrical connections are conveniently
made at the rear of the boiler without the need to remove
any panels or components.
MODEL
Inlet Temp.
Outlet Temp.
Rec. Flow Rate (gpm)
Pressure Drop For Rec. Flow
Min. Flow Rate (gpm)
Max. Flow Rate (gpm)
Cold Water Inlet
Combustion Air Inlet
MODEL
Gas Connection:1”1”1”1 1/4”
Water Connection (In):3” MPT 3” MPT 3” MPT 3” MPT
Water Connection (Out):3” FPT 3” FPT3” FPT 3” FPT
Vent Intake:8”8”8”8”
Exhaust Vent:6”6”8”8”
System Drain1 1/4”1 1/4”1 1/4”1 1/4”
Condensate Drain1/2”1/2”1/2”1/2”
Figure B.2.1. Piping Connection Sizing Chart.
T-80T-100 T-150 T-200
34-6943-8565-12985-172
Table A.1. Triton Recommended Flow Rates.
Electrical Connection
Gas Inlet
Hot Water Outlet
Exhaust Vent
Condensate Drain
System Drain
Figure B.2.1. Connection Locations
T-80T-100 T-150 T-200
B.3. COMBUSTION AND VENTILATION AIR
!
WARNING:
• The lack of adequate combustion air is the single
biggest operating problem encountered with gas
fi red water boilers.
B 5
A
• Use of the boiler in construction areas where ne
particulate matter, such as concrete dust or drywall
dust, is present may result in damage to the boiler
that is not covered by the warranty. If operated in a
construction environment, a clean source of combustion air must be provided directly to the boiler.
• Your Triton Series™ boiler is equipped with a lter to
help prevent such an occurrence above and must be
checked at least every month. A single replacement
lter is located inside the control box.
B.3.a. Indoor Units (Standard)
The boiler must be supplied with suf cient quantities of
non–contaminated air to support proper combustion and
equipment ventilation. Triton Series™ boiler combustion air
can be taken using the boiler room air or may be vented
directly outside.
It is generally recommended to take combustion air from a
well ventilated boiler room whenever possible. However
when using direct combustion air venting, the boiler is capable of up to 30 ft. of equivalent venting. If more than 30 ft.
of equivalent venting is required, an enlarged vent diameter
may be used to extend maximum vent lengths, but must be
properly sized to allow for suf cient combustion air to be
supplied to the boiler.
All installations must comply with the requirements of the
National Fuel Gas Code, NFPA 54, Canada B149, and all
local codes.
• Note: All additional gas red equipment should be
considered when calculating the necessary air supply.
B.3.b. Direct Vent (Ducted Combustion Air)
If outside air will be drawn through the intake vent directly
to this unit for combustion:
• The exhaust vent must be installed with a slight upward
slope of not more than ¼ inch per foot of horizontal run
to vent terminal.
• The exhaust vent must be insulated through the length
of the horizontal run.
• Intake and exhaust vents with vertical termination
should have a rain cap installed.
• It is recommended to install a drain on the exhaust
vent.
In cold climates, and to mitigate potential freeze up,
• In cold climates, and to mitigate potential freeze up,
ce Heating Solutions, LLC highly recommends the
Ajax Boiler Inc. highly recommends the installation of a
installation of a motorized sealed damper to prevent
motorized sealed damper to prevent circulation of cold
circulation of cold air through the boiler during the non –
air through the boiler during the non – operating hours.
operating hours. When installing motorized damper
When installing motorized damper actuator with switch
actuator with switch contacts, prove the damper is fully
contacts, prove the damper is fully open to prevent unit
open to prevent unit from firing when damper is not fully
from ring when damper is not fully open.
open.
B.3.c. Conventional Combustion Air Supply
U.S. Installations
All Air from inside the building
!
NOTE:
• In calculating free area, the required size of the opening for combustion, ventilation, and dilution air shall
be based on net free area of each opening. If free
area through a design of louver or grill is known, it
shall be used in calculating the size opening required
to provide the free area speci ed. For additional information, refer to the latest NFGC code requirements.
• Provisions for combustion and ventilation air must be
in accordance with Air for Combustion and Ventilation,
of the latest edition of the National Fuel Gas Code,
ANSI Z223.1. In Canada the latest edition of CGA
Standard B149 Installation Code for Gas Burning Appliances and Equipment, or applicable provisions of
the local building codes.
• In order to protect electrical components, the boiler
room ambient air temperature shall not exceed 100
• The equipment room MUST be provided with properly sized openings to assure adequate combustion
and ventilation air when unit is installed with a basic
Category IV venting system.
If all combustion air is drawn from inside the building and
the mechanical equipment room does not receive air from
outside, the following applies:
• The mechanical room must be provided with two
permanent openings communicating directly with additional room(s) of suf cient volume so that the combined volume of all spaces meets the criteria for an
uncon ned space. (An uncon ned space is de ned as
a space whose volume is more than 50 cubic feet per
1,000 BTUH of the aggregate input rating of all appliances installed in that space. (NFGC).
• Each opening must have a minimum free area of 1
sq. in. per 1,000 BTUH of the total input rating of all
o
F.
gas utilization equipment in the mechanical room.
• One opening must commence within 12” of the top, and
one opening must commence within 12” of the bottom
of the room.
B 6
A
!
NOTE:
Ajax Boiler Inc. recommends that one opening shall com-
ce Heating Solutions, LLC recommends that one opening
mence with 6” from the top and one opening shall com-
shall commence with 6” from the top and one opening shall
mence 6” from the bottom. The combined area of the two
commence 6” from the bottom. The combined area of the two
openings should not be less than 200 sq. in. for the rst
openings should not be less than 200 sq. in. for the first
100,000 BTUH boiler input, and 100 sq. in. for each ad-
100,000 BTUH boiler input, and 100 sq. in. for each additional
ditional 100,000 BTUH boiler input.
100,000 BTUH boiler input.
All Air from Outdoors
If all the combustion air is drawn from the air outside the
building, and the mechanical equipment room directly communicates with outdoor air, either of the following methods
can be used:
Louvers and grilles.
!
NOTE:
The required size openings for combustion, ventilation and dilution air shall be based on the net free area
of each opening. Where free area through a louver or
grille design is known, it shall be used in calculating the
size opening required to provide the free area speci ed.
Where the louver and grille design, and free area are not
known, it shall be assumed that wood louvers will have
25% free area, and metal louvers and grilles will have
75% free area (NFGC).
Canadian Installations
Method 1
• The mechanical equipment room must be provided with
two permanent openings. One commencing within 12”
of the top and one commencing within 12” from the bottom of the room.
• The openings must communicate directly, or by ducts,
with the outdoors
• Each opening must have a minimum free area of 1 sq.
in. per 4,000 BTUH of all equipment in the room when
the opening is communicating directly with the outdoors
or through vertical ducts. The minimum free area required for horizontal ducts is 1 sq. in. per 2,000 BTUH
of the total input rating to all the equipment in the room.
(For addition information, refer to the latest NFGC)
Method 2 (normally applied in cold climate regions):
• The mechanical equipment room must be provided with
at least one permanent opening, commencing within
12” of the top of the enclosure.
• The opening must communicate directly or by ducts
with the outdoors.
• The opening must have a minimum free area of 1 sq.
in. per 3,000 BTUH of the total input rating of all equipment in the room, or no less than the sum of the areas
of all vent connectors in the con ned space.
CAUTION:
!
All combustion air must be drawn from the outside air of
the building; the mechanical equipment room must communicate directly with outdoor air.
!
WARNING:
Care must be taken to ensure that the equipment room is
not under negative pressure conditions.
• Ventilation of the space occupied by the boiler shall
be provided by an opening(s) for ventilation air at
the highest practical point communicating with the
outdoors. The total cross-sectional area of such an
opening(s) shall be at least 10% of the area required
in (2) below, but no less than 10 sq. in.
• For boilers using a barometric damper vent system
there shall be a permanent air supply opening(s)
having a cross section area of not less than 1 sq. in.
per 7,000 BTUH up to and including 1 million BTUH,
plus 1 sq. in. per 14,000 BTUH in excess of 1 million
BTUH. This opening(s) shall be located at or ducted
to a point no more than 18” nor less than 6” above
oor level. The duct can also “goose neck” through
the roof. The duct is preferred to be straight down
and terminated 18” from the oor, but not near the
piping. This air supply opening requirement shall be
in addition to the air opening for ventilation air required in (1). (above)
(For additional information, refer to the latest NFGC)
!
WARNING:
Do not use the “one permanent opening” method if the
equipment room is under negative pressure conditions
or the equipment is common vented with other gas red
appliances.
For additional information, refer to CGA, B149
B.4. CONVENTIONAL FLUE VENTING
CAUTION:
!
Proper ue venting is critical for the safe and ef cient
operation of the boiler.
B 7
Defi nition of ANSI Categories for High Effi ciency
Appliances
• Boilers are divided into four vent type categories based
on the pressure produced in the exhaust and the likelihood of condensate production in the vent. Atlas™
Triton Series™ Boilers require Category IV venting.
(See NFGC, NFPA 54, Section 7 “Venting Equipment”
for more detailed information).
• Category IV: A boiler which operates with a positive
vent pressure and with a gas temperature that may
cause excessive condensate production in the vent.
!
NOTE:
This de nition applies to the appliance and does not
necessarily re ect the performance of the connected vent
system.
• For additional information on appliance categorization, see appropriate ANSI Z21 Standard and the
NFGC (US), or CGA (Canada) B149, or applicable
provisions of local building codes.
• Triton Series™ boilers are designed to operate with a
chamber pressure of 0 to +0.5” WC. The boiler is capable of 100 feet of vertical equivalent exhaust when
equipped with the standard exhaust vent. When more
than 100 feet of exhaust venting is used, the chamber pressure could increase beyond the maximum
designed +0.5” WC. An optional enlarged vent may
be used to increase vent runs in case more than the
100 ft. maximum is needed, however venting must
be designed by a professional engineer to ensure the
boiler chamber pressure stays within the designed
range. Boiler vents must be constructed of AL29-4C
or similar suitable material acceptable for use with
exposure to condensate.
!
WARNING:
Using improper venting materials can result in per-
sonal injury, death or property damage.
U.S. Installations
Refer to the latest edition of the National Fuel Gas Code.
• Vent must terminate at least 4 ft. below, 4 ft. horizontally from, or 1 ft. above any door, window or gravity
air inlet to the building.
• The vent must not be less than 7 ft. above grade
when located adjacent to public walkways.
• Terminate the vent at least 3 ft. above forced air inlet
located within 10 ft..
• The vent must terminate at least 4 ft. horizontally, and
in no case above or below unless 4 ft. horizontal distance is maintained, from electric meters, gas meters,
regulators, and relief equipment.
• Terminate the vent at least 6 ft. away from adjacent
walls.
• Do not terminate vent closer than 5 ft. below roof
overhang.
• Terminate vent at least 1 ft. above grade, including
snow line.
• Multiple direct vent installations require a 4 ft. clearance between the ends of vent caps located on the
same horizontal plane.
!
WARNING:
Canadian Installations
Refer to the latest edition of CGA, B149 Installation
Code.
• A vent shall not terminate directly above a paved
sidewalk or driveway which is located between two
single family dwellings and serves both dwellings.
• A vent shall not terminate less than 7 ft. above a
paved sidewalk or paved driveway located on public
property.
• A vent shall not terminate within 6 ft. of a mechanical
air supply inlet to any building.
• A vent shall not terminate above a meter/regulator
assembly within 3 ft. horizontally of the vertical center
line of the regulator.
• A vent shall not terminate within 6 ft. of any gas service regulator.
• A vent shall not terminate less than 1 ft. above grade
level.
• A vent shall not terminate within 3 ft. of a window or
door which can be opened in any building, any non –
mechanical air supply inlet of any other appliance.
• A vent shall not terminate underneath a verandah,
porch or deck, unless the verandah, porch or deck
is fully open on a minimum of two sides beneath the
oor, and the distance between the top of the vent
termination and the underside of the verandah, porch
or deck is greater than 1 ft..
Vent Termination Location
!
NOTE:
During winter months check the vent termination cap and
make sure no blockage occurs from buildup of snow and
ice. Condensate can freeze on the cap. Frozen condensate on the vent cap can result in a blocked ue.
• Give special attention to the location of the vent
termination to avoid possibility of property damage or
personal injury.
B 8
• Gases may form a white vapor plume in the winter.
The plume could allow hazardous ue gas in through
an open window or obstruct a window view if the
termination is installed near windows.
• Prevailing winds, in combination with below freezing
temperatures, can cause freezing of condensate and
water/ice build up on building, plants or roofs.
• The bottom of the vent terminal and air intake shall
be located at least 12” above grade, including normal
snow line.
• Non-insulated single wall Category IV metal vent pipe
shall not be used outdoors in cold climates for venting gas– red equipment without insulation.
• Through-the-wall vents for Category IV appliances
shall not terminate over public walkways or over an
area where condensate or vapor could be detrimental
to the operation of regulators, relief valves, or other
equipment.
• Locate and guard vent termination to prevent accidental contact by people or pets.
• Do not terminate vent in a window well, stairwell,
alcove, courtyard or other recessed area.
• Do not terminate above any door, window, or gravity
air intake. Condensate can freeze, causing ice formations.
• Locate or guard vent to prevent condensate from
damaging exterior nishes. Use a rust resistant sheet
metal backing plate against brick masonry surfaces.
• Do not extend exposed vent pipe outside of building
beyond minimum distance required for vent termination. Condensate could freeze and block vent pipe.
C. INSTALLATION
A
A
For Your Safety:
!
C 9
!
WARNING:
• Altering any Atlas™ Triton Series™ boiler’s pressure
ltering any Atlas™ Triton Series™ boiler’s pressure
vessel by installing replacement heat exchangers,
vessel by installing replacement heat exchangers,
tube bundles, coils or any ASME parts not manufac-
tube bundles, coils or any ASME parts not manufactured
tured and/or approved by Ajax Boiler Inc. will instantly
and/or approved by Ace Heating Solutions, LLC will
void the ASME and E.T.L. rating of the vessel and
instantly void the ASME and E.T.L. rating of the vessel
any warranty on the vessel. Altering the ASME or
and any warranty on the vessel. Altering the ASME or
E.T.L. ratings of the vessel also violates national,
E.T.L. ratings of the vessel also violates national,
state, and local codes.
• Installation and service must be performed by a quali ed installer, service agency or gas supplier.
• Improper installation, adjustment, alteration, service
or maintenance can cause property damage, personal injury, loss of warranty, exposure to hazardous
materials or loss of life. Review the information in this
manual carefully.
• Make sure the gas on which the boiler will operate is
the same as that speci ed on the boiler rating plate
(natural gas/propane).
• Caution when servicing gas train components. Propane (LPG) is heavier than air and may be trapped
in pipes, vents, combustion chamber, or other areas.
Always handle with care.
• Should overheating occur or if the gas supply valve
fails to shut, do not turn off or disconnect the electrical supply to the boiler. Instead, shut off the gas supply at a location external to the boiler.
• Do not use this boiler if any part has been under
water. Immediately call a quali ed service technician
to inspect the boiler and to replace any part of the
control system or any gas control which has been
under water.
• To minimize the possibility of improper operation,
serious injury, re, or damage to the boiler:
1. Always keep area around the unit(s) free of chlorine, combustible materials, gasoline, and other
ammable liquids and vapors.
2. Water to be heated in the boiler should be free
or have low levels of chlorine or other chemicals
or water conditions that would be harmful to the
copper heat exchanger. Boiler room ambient
temperature shall not exceed 100 degrees F.
3. Boiler should never be covered or have any
blockage to the ow of fresh air to the boiler.
• Risk of electrical shock. More than one disconnect
switch may be required to de–energize the equipment
before servicing.
• When servicing ceramic ber based refractory or
insulation blanket, gloves and respirators should
be worn to reduce exposure to airborne refractory
ceramic bers.
Do not store or use gasoline or other ammable vapors
and liquids or other combustible materials in the vicinity
of this or any other appliances. To do so may result in an
explosion or re.
WHAT TO DO IF YOU SMELL GAS:
• Do not try to light any appliance
• Open any windows and secure area
• Do not touch any electrical switch; do not use any
phone in your building.
• Immediately call your gas supplier from a neighbor’s
phone. Follow the gas supplier’s instructions.
• If you cannot reach your gas supplier, call the re
department.
!
NOTE:
• In order to meet commercial hot water needs, the
high limit safety control on this hot water boiler is adjustable up to 240 degrees F. by the OEM or installer
only.
• Safety and energy conservation are factors to consider when setting the temperature aquastat on the unit.
The most energy–ef cient operation will result when
the temperature setting is the lowest that satis es the
needs of the application.
C.1. PRODUCT INSPECTION
1. Upon receipt of the boiler, visually inspect the external
packaging and unit for damage. If the packaging or
boiler is damaged, make a note to that effect on the Bill
of Lading when signing for the shipment.
!
NOTE:
The boiler packaging is equipped with a tip and tell label.
If label indicates boiler has been tipped over during shipping, remove crate and inspect before trucker leaves
2. Remove the shipping carton from the boiler and inspect
it internally for both damage, and accuracy of the unit
against the bill of lading and original purchase order.
Report any damage, missing or incorrect parts, or other
discrepancy to the carrier and supplier immediately.
• Claims for damages must be led with the carrier
by the consignee.
• Permission to return goods must be received from
the factory prior to shipping.
• Goods returned to the factory without an authorized Return Goods Authorization number will not
be accepted.
• Ajax Boiler Inc. is not responsible for any dam-
ce Heating Solutions, LLC is not responsible for
any dam-
C 10
age that the unit receives while in shipping. As
each shipping company has its own procedure for
ling a claim, please contact the shipper for claim
instructions.
C.1.a. Model Identifi cation
• Your Atlas™ Triton Series™ Boiler carries two identi cation plates. The coil identi cation plate, which carries
the ASME Code Stamping and Registration Number
(when applicable), is attached to the water inlet, with a
duplicate on the heat exchanger top plate. The unit’s
nameplate is located on the right side of the rear panel
of the unit, and lists information concerning the input
and output of the unit, electrical and gas ratings, working pressure and clearance to adjacent construction
gures. In addition, the model and serial numbers are
on the plate. You will need these to order replacement
parts from the manufacturing representative in your
area or from the factory.
• The information on the National Board plate is the
same as on the nameplate with the exception of the
National Board registration number, which is required in
most states for installation of the unit.
C.1.b. The Boiler Name Plate
The following illustration is an accurate depiction of the
nameplate found on the rear side of the boiler. You will also
nd an ASME nameplate on the inlet pipe with some of the
same information.
!
NOTE:
• Minimum Btu/Hr. ratings apply to high-low and modulating type boilers only.
• Boiler output ratings are based on factory tests under
appropriate conditions. Field results may vary.
• Maximum allowable working pressure for the boiler
relief valve set pressure should not exceed the lowest
MAWP of any component in your system.
• Applies to forced draft type burners only.
• Minimum and maximum gas pressure values are
measured at the point of connection to the boiler gas
train. Manifold gas pressures are measured after the
gas train.
!
WARNING:
Do not remove any of these plates from the unit for any
reason. Removal of these plates will void the warranty.
C.1.c The Boiler Model Number
ATLAS T 150 P - W
Brand:
• ATLAS
Boiler Type:
• T = Triton Series
Since 1919
Ace Heating Solutions, LLC
AJAX BOILER INC.
AJAX BOILER INC.
DISCRIPTION
MODEL NO.SERIAL NO.MIN. RELIEF VALVE CAP.
MAX. BTU. /HR. INPUT
MIN. BTU. /HR. INPUT
VOLTSHERTZPH.AMPS.MOT. AMPS. CTRL. VOLT CTRL. AMP
MIN. GAS PRESS.MAX. GAS PRESS.MANIFOLD PRESS.FUEL TYPE
#2 OIL
FOR EITHER INDOOR OR OUTDOOR INSTALLATION.
NOT FOR INSTALLATION ON COMBUSTIBLE FLOORING.
9900456
BTU. /HR. OUTPUT
BTU. /HR. OUTPUT
IF OIL FIRED, DO NOT USE
OIL HEAVIER THAN #2
ETL LISTED
CONFORMS TO
UL STD 795
CERTIFIED TO
CAN STD 1-3.1
2701 S. HARBOR BLVD. SANTA ANA, CA 92704
714.437.9050 FAX 714.437.9060
H.P.HEATING SURFACE
GROSS E.D.R.M.A.W.P.
INTEGRAL GROUP
PRIMARY SAFETY
MINIMUM CLEARANCES TO
ADJACENT CONSTRUCTION
Firing Rate:
080 = 800,000 Btu/Hr150 = 1,500,000 Btu/Hr
100 = 1,000,000 Btu/Hr200 = 2,000,000 Btu/Hr
Fuel Type:
• G = Natural Gas
• P = Propane
Cabinet Application:
• W = Outdoor
• (No Suf x refers to Indoor Jacketing)
C.2. RATING AND CERTIFICATIONS
• All units must be installed in accordance with all state
and local codes, and national codes, including but not
limited to:
• ANSI Z223.1/ NFPA 54, National Fuel Code
• ANSI/ NFPA 70, National Electric Code
• All Atlas™ Boilers are National Board approved and
designed–certi ed and tested by Intertek (E.T.L.),
standards for the US and Canada (Can Std 1-3.1), and
UL 795. Each unit is constructed in accordance with
A
A
Section IV of the American Society of Mechanical Engineers (ASME) Boiler Pressure Vessel Code and bears
the ASME “HLW” stamp or “H” stamp.
C.3. INSTALLATION CODES
• Installation of the Triton Series™ boilers must conform
to the require ments of the authority having jurisdiction,
or in the absence of such requirements, to the National
Fuel Gas Code, ANSI Z223.1/ NFPA 54, and/ or NaturalGas and Propane Installation Code, CAN/CSA B149.1.
C 11
6. Move the boiler to its nal installed position.
!
NOTE:
Ajax Boiler Inc. strongly recommends that you secure the
ce Heating Solutions, LLC strongly recommends that
boiler to the base pad by the mounting holes provided at
you secure the boiler to the base pad by the mounting
the base of the unit.
holes provided at the base of the unit.
C.5. WATER SYSTEM PIPING
• Where required by the authority having jurisdiction, the
installation must conform to the Standard for Controls
and Safety Devices for Automatically Fired Boilers,
ANSI/ASME CSD1
Installations must also follow:
• Local, state, provincial, and national codes, laws,
regulations and ordinances.
• If any code listed above con ict, the stricter of the
con icting codes shall be followed for installation.
• Installation and Service must be performed by a
quali ed installer, service agency or the gas supplier
C.4. PREPARING THE BOILER
!
NOTE:
Your Atlas™ Triton boiler comes equipped with a steel
pallet jack base for safe and easy movement and placement.
1. Place the boiler in its approximate installed location, on
a clean, level, structurally sound surface.
CAUTION:
!
This boiler requires forced water circulation when burner
is operating. See minimum and maximum ow rates
in Table C.3.1. below. Severe damage will occur if the
boiler is operated without proper water ow circulation.
A ow switch is used to ensure that water ows through
the boiler, but does not check for the minimum ow rate
into the boiler. Numbers are approximate and may vary
depending on installation.
!
NOTE:
Ajax Boiler Inc. strongly recommends that you secure the
ce Heating Solutions, LLC strongly recommends that
boiler to the base pad by the mounting holes provided at
you secure the boiler to the base pad by the mounting
the base of the unit.
holes provided at the base of the unit.
All hot water outlet and return piping is connected at the
rear of the boiler. Piping is to be installed per local codes
and regulations. Piping for the hot water outlet and return
may be connected without removing cabinet panels. Unused connections must be safely blanked off.
MODEL
Minimum Flow Rate (GPM):34436585
Maximum Flow Rate (GPM):6985129172
Pressure Drop:
T-80T-100 T-150 T-200
Table C.5.1. Triton Flow Rates.
2. If the boiler is in its original packaging, remove the
banding, carton, corner posts and stand-offs, and
discard.
3. Unpack the manifold assembly from the small carton
attached to the rear of the boiler.
4. Install the manifold assembly to the hot water outlet at
the rear of the boiler until tight, and such that the pressure relief valve is in the vertical, upright position at the
top of the manifold.
5. Install the 2 loose wires at the rear of the boiler to
the ow switch installed at the side of the manifold as
shown in gure C.5.1.
C.5.a. System Connections
1. Connect cold water return pipe to the primary water
inlet on the boiler.
2. Connect outlet system pipe to hot water outlet at manifold.
3. Install drain valve provided in the boiler drain line at
bottom rear of the boiler.
C 12
C.5.b. Pressure Relief Valve
The pressure relief valve safety is factory assembled on the
safety manifold previously installed to the boiler in Section
C.2. Discharge piping must be installed to the relief valve
outlet to avoid potential scalding of attendants. Discharge
piping should be as short and direct as possible and installed and terminated per local codes and regulations.
Pressure Relief
Valve Outlet
Manifold
Flow Switch
FRONTSIDE
Figure C.5.1. Manifold and Components
C.6. GAS SUPPLY
The boiler must be isolated from the gas supply piping
system by closing its individual manual shut–off valve
during any pressure testing of the gas supply piping
system at test pressures equal to or more than ½ psi (3.5
kPa).
Do not use Te on tape on gas line thread. A pipe compound rated for natural and propane gases are recommended. Apply sparingly only on the male pipe ends,
leaving the two end threads bare.
Gas Piping Leak Test
Upon rst installing the Triton Series™ boiler, it is important
to check the gas line leading up to the unit for gas leaks.
1. Follow the National Fuel Gas Code for instructions on
proper gas line piping and gas leak tests.
2. Measuring gas pressures can help detect leaks in isolated lines. Temporarily install a manometer or pressure
gauge with an upper limit of no more than 5 times the
testing pressure, 5 x 14” WC = 2.6psi for Triton Series™ boiler installations between the manual gas shut
off on the boiler and supply line’s regulator.
DANGER:
!
Make sure the gas on which the boiler will operate is the
same as that speci ed on the boiler rating plate (natural
gas/propane).
• The gas line should be a separate line running directly
from the gas meter to the unit, unless the existing gas
line is of ample capacity. Verify the capacity of the
existing gas piping if it is to be used.
• The gas pipe must have a sediment trap ahead of the
boiler connection controls and a manual shut–off valve
located outside the boiler cabinet. It is highly recommended that a union be installed in the gas supply
line adjacent to the boiler for servicing. The maximum
working gas pressure for both natural gas and propane
is 14” WC Keep in mind that an increase in gas pressure, without making additional adjustments, leads to
an increased BTU input and a decreased ef ciency.
!
WARNING:
A sediment trap MUST be installed on the gas piping for
each gas line.
3. Leaving the shut off valve closed on the boiler, open
the supply line momentarily until the installed manometer reads a stable pressure and record the pressure
and ambient temperature.
4. Close the supply line and monitor the gas pressure for
a drop in pressure. The test should be monitored for at
least 10 minutes or ½ hour per each 500 ft
in the testing pipe.
5. At the end of the monitoring period, record the gas
pressure and temperature. If there is a drop in pressure, a gas leak may be present and should be further
investigated (Note: signi cant temperature variations
may cause changes in the gas pressure and should be
retested).
!
NOTE:
Please refer to the latest National Fuel Gas Code for
leak test details. If instructions differ, the Fuel Gas Code
shall supersede the instructions in section D.6.a. of these
instructions.
3
of volume
C.6.a. Testing Gas Line
CAUTION:
!
The boiler must be disconnected from the gas supply
during any pressure testing of the gas supply at test pressures in excess of ½ psi (3.5 kPa).
C 13
A
C.6.b. Gas Supply Pressure
!
WARNING:
Relieve the pressure in the gas supply line prior to connecting the boiler and its manual shut off valve to the gas
supply line. Failure to follow this procedure may damage
the gas valve. Gas valves damaged by high gas pressures are not covered by the warranty.
The boiler and its gas connections must be tested for
leaks before operation of the units.
Input may decrease if gas pressure falls below the values
shown below. The maximum gas supply pressure is 14”
WC for all Triton units. If gas pressure exceeds 14” WC
an intermediate gas pressure regulator of the lockup type
must be installed. If gas pressures less than those provided below are used, input may be decreased.
MODEL
Naturel Gas (“ WC)5-145-145-145-14
Propane (“ WC)5-145-145-145-14
If the gas pressures exceed 14” WC, a gas pressure
regulator must be installed prior to the gas connection to
reduce the supply pressure.
When connecting additional gas utilization equipment to
the gas piping, the existing piping must be checked to
determine if it is adequate for the combined load.
T-80T-100 T-150 T-200
Table 2.3.1. Triton Gas Pressure Chart.
CAUTION:
!
C.7. PUMP INSTALLATION
!
WARNING:
Electrical Shock Hazard!
• Electrical work must be done by a quali ed electrician
only.
• National Electrical codes, local codes and regulations
must be followed.
• All electrical connections must be performed after the
electrical supply has been switched off and secured
against unauthorized switching.
• Depending on installation, the pump/motor can become extremely hot. To avoid risk of burning, handle
pump with heat resistant gloves or ensure the pump
is cool before handling the pump.
CAUTION:
!
Never operate the pump dry, the system must be lled
before starting the pump. Ensure all isolation valves are
open before start up
n optional pump can be ordered through Ace
• An optional pump can be ordered through Ajax Boiler
Heating Solutions, LLC properly sized for the boiler.
Inc. properly sized for the boiler. Flange kits are also
Flange kits are also provided with the pump to fi t
provided with the pump to t the boiler connection
the boiler connection sizes. Please contact an
sizes. Please contact an authorized Ajax Boiler repre-
authorized Ace Heating Solutions, LLC
sentative, or the factory for details.
representative, or the factory for details.
C.7.a. Pump Overload Protection
• A fused plug or circuit breaker in the power line is
required.
C.6.c. Attach Gas Line
1. Attach main gas supply line to boiler gas shut-off valve
located outside at the rear of the boiler cabinet as
shown below.
• The pump must be connected to the electrical supply
via an external contactor/relay to provide thermal overload protection. The contactor/relay must be connected
to the built-in thermal overload switch terminals P1
and P2 (potential-free normally closed contact, contact
load 250 VAC/1A) to protect the pump against thermal
Safety Shut Off
Valve
overloading at all speeds.
• If the pump is protected by means of a motor starter,
the starter must be set to the current consumption of
the pump at the selected speed. The motor starter
setting must be changed every time the pump speed
is changed. The current consumption at the individual
speeds is stated on the pump rating plate.
Side View
(L)
Figure C.6.1. Safety Shut Off Valve