Atlantic FB4600 User Manual

Instruction Manual
Model: FB4600 FB3200
1-877-80-PONDS
www.atlanticwatergardens.com
Installation
Begin by excavating a hole with a diameter at least 6 inches wider than the basin being installed, and to a depth of 12½”. This depth will leave the Fountain Basin slightly higher than the ground around it, which will keep soil, mulch or gravel from entering the basin. Angling the sides of the hole outward slightly will aid in the backfill process.
Caution: Do not dig too deep. The Fountain Basin should be set on undisturbed earth if possible. In the case that you over-dig, be sure to compact the soil thoroughly to prevent settling. The bottom of the hole should be level side-to-side and front-to-back (Figure 1).
Figure 1.
Add water to prevent the Fountain Basin from shifting during the backfill process. Use loose soil from the excavation to fill the void around the pe­rimeter of the basin. Leave the area around the pump chamber open until all of the electrical and plumbing connections are made. Lightly compact the soil around the basin as you backfill. (Figure 2.)
Caution: over compacting can distort or crush the edges of the Fountain Basin.
Figure 2.
2
Loading...
+ 2 hidden pages