Atec 19050, 19070 User Manual

GPIB
RS-232
PRINTER
AC/DC/IR HIPOT TESTER
MODEL 19070 & 19050 SERIES
Complete Dielectric Testing Solution
followed by IR.
compact unit.
into a single compact unit.
Open Short Check (OSC)
the electrical safety.
Flashover (ARC) Detection
current spikes even if they do not exceed the
maximum trip current level.
Ground Continuity Check
All of the 19050 seri es testers ha ve a gro un d
con ti nui ty ch eck fea tu re to de te rmine th e
Ground Fault Interrupt (GFI)
GFI is required by the National Elec trical Code
in wet locat ions. Such d evices automati cally
ex is ted fo r more th an a few mi ll i-se conds to
protect users.
Quick Discharge
In DC hipot and IR test the device under test is
technique results in a rapid and safe discharge.
AC/DC/IR Hipot Tester
MODEL 19070 SERIES 19050 SERIES
Basic Specifications:
AC/DC/IR 3 in 1 hipot tester
AC 5kV and DC 6kV output
1kV insulation resistance test
Insulation resistance measurement from
1MΩ to 50GΩ
Ground continuity check
Standard RS-232 interface
Key Features:
Open short check(OSC) function
GFI shutdown the instrument when
imbalance current > 0.5mA
Flashover (ARC) detection
Quick discharge of DUT in IR and DC test
Pause mode
Others:
Large LCD display (240 x 64 dots matrix)
UL and TUV approved (*see spec)
CE mark
Programmable ramp/fall and test time
Programmable high/low limit
Save/Recall program test function
Remote control and interface support
TECHNICAL NOTE
FLASHOVER DETECTION
Fast transient in Voltage or Current occured while Hi-Pot testing is called Electrical Flashover. Normally, in AC line frequency (50Hz/60Hz) or DC Hi-Pot
testing, the leakage current is the same as 50Hz/60Hz or DC (charge current is excepted). As shown in Figure leakage current varies smoothly.
On the other hand, electrical discharge occurred because of poor insulation in material, electrode gap or surface clearance etc., fast transient in leakage
current apparent as shown in gure. This is phenomenon of poor withstanding. Most of Electrical Safety regulations mention the necessity in Withstand
Strength Test. Nevertheless, general Hi-Pot tester detects the RMS value of leakage current only without capability to detect Flashover. Therefore,
FLASHOVER detection function equipped with Hi-Pot tester is necessary.
10
Gap Discharge Voltage
Test Voltage Waveform
0
180 360
Leakage Current (normal capacitive)
-10
Figure 1 : Normal Leakage Current Waveform
10
Test Voltage Waveform
Gap Discharge Voltage
0
180 360
Leakage Current (abnornmal with ashover)
-10
Figure 2 : Leakage Current Waveform when ahover occurred
OPEN/SHORT CHECK (OSC)
O.S.C function is used to check the connection is open or short circuit between instrument and DUT(equipment under test) before the Electrical Safety Test.
If the connection is bad between the instrument and DUT, sometimes like leads or relay oxidation, the judgment is also PASS. In some cases, the DUT is
short before testing. Testing continually leads to our instrument broken because suered the high load current. Therefore, we have to check the open and
short circuit to ensure the test eectively and protect instruments.
Generally, the DUT have capacitive load (Cx) from tens to thousands of pF. If the connection opening, a capacitance will appear and then total capacitive
load is lower than that in normal condition. If the DUT shorting, total capacitive load is higher than that in normal condition. Therefore, we can measure the
value of capactive load to check the contact is good or not.
Hi
V
s
V
µA
Normal Condition
Ground Fault Interrupt (GFI)
The requirement of test environment indicates that test equipment
is equipped with auto interrupt device so that Chroma develops into
Ground Fault Inter rupt (GFI) function. When the current meter A
and A2 detect the difference (i2-i1=iH) between the value i1 and actual
i2 test current over high, this device can cut the power transiently for
protecting human body safety. It is not only compliance with the safety
standard but also more safeguards for test personnel.
Lo
C
x
V
s
µA
If Circuit Opened :
C = Cc*Cx/(Cc+Cx) << C
Hi
V
Lo
C
c
C
x
V
s
V
µA
If Circuit Shorted :
x
C >> C
Hi
Lo
x
Hipot Tester
HV
1
i
2
i
1
Return
A
2
A
1
i
H
DUT
Operator
Loading...
+ 2 hidden pages