
M6x16mm
Large-Medium TV Articulated Arm
5mm/4mm
Allen Key
M6x16mm
M6x25mm
M8x16mm
Large-Medium TV Articulated Arm
Allen Key
M6x16mm
M6x25mm
M8x16mm
Allen Key
M6x16mm
M6x25mm
M8x16mm
TH-3060-UFH
Component Checklist
Installation Instructions
Flat screen wall mount | Full Motion height adjustable
Arm
Wall plate
cover (x2)
Display
Mount
Display
Bracket (x2)
Hardware Bag
Coach Screw (x4)
Nylon Anchor (x4)
M6 Nyloc Nut (x4)
M6 x 6mm screw (x4)
Mount
cap (x2)
Spanner
6mm/4mm
Allen key
12mm Washer (x4)
20mm Washer (x4)
Tools required:
- Philips head screwdriver
- Power drill
- 5mm (0.2”) drill bit
- 10mm (0.39”) masonary drill bit
IMPORTANT INFORMATION
! IMPORTANT - Install Telehook Flatscreen wall mount as per Installation Instructions
! This product supports a minimum load of 5kg (11lbs) and a maximum load of 25kg (55lbs)
! This product supports VESA mounting hole configurations from 200mm x 200mm to 400mm x 400mm
! The Manufacturer accepts no responsibility for incorrect installation.
Step 1. Check Components
Check you have received all parts against the Component Checklist and Hardware.
Step 2. Mounting Location
This product has a feature where the arm will automatically lock in position when
pushed up against the wall to the left. If this feature is to be used allow clearance
to the left when deciding the mounting location.
Display Mounting
Screws Bag
M8 x 16mm (x4)
M8 x 25mm (x4)
M6 x 16mm (x4)
M6 x 25mm (x4)
Wall
locked position
Clearance
free movement
To unlock, pull the chord down whilst
moving the arm away from the wall
Step 3. Install Arm to the wall
Masonary Wall Timber Stud wall
Drilled hole
Wall
Coach Screw
Nylon Anchor
Coach Screw
Drilled hole
Washer
- Using a 10mm (0.39”) masonary drill bit, Drill four holes,
60mm (2.4”) deep.
- Secure the mounting plate to the wall using the Coach
Screws and Nylon Anchors supplied.
Washer
- Using a 5mm (0.2”) drill bit, Drill three holes , 60mm (2.4”)
deep.
- Secure the mounting plate to the wall using the Coach
Screws supplied.
NOTE: Use a stud finder to accurately locate the centre
of the stud. Ensure that all screws fix securely into stud.

Step4.AttachWallPlateCovers
Step5.AttachDisplayMounttoArm
Threaded stud
PUSH
Step6.HorizontalRotationAdjustment
B.This will
5° 5°
allow 10°
Horizontal
rotation
adjustment
x2
Note:The nuts can be re-tightened to
secure the display in position or left to allow
future changes
A.From the
tightened position
undo each nut a
quarter of a turn two
times
Washer
Mount
Step7.AttachScrewCovers
M6 Nyloc Nut
(tighten firmly)
PUSH
Step8.AttachMountingRailsToDisplay
The Mounting rails support VESA hole
configurations from 200mm x 200mm to
400mm x 400mm
Only insert the M6 x 6mm screws in
the mounting rail attached to the top of
the display. Tighten fully then undo one
half turn
Display mounting screw
Mounting rail