Component Checklist
Installation Instructions
SPACEDEC ACROBAT
SWING ARM DOUBLE
Swing Arm Assembly (x2)
Cable Wrap Applicator (x1)
Top Cap Tool (x1)
2.5mm Allen Key (x1)
Cable Clip (x4)
Extension Clip (x8)
Bits Box
Mounting Fasteners
M4x10mm Screw (x8)
M4x12mm Screw (x8)
M4x16mm Screw (x8)
16mm Cable Wrap (x2)
Washer (x1)
Base Casting (x1)
Spacer Tube Assembly (x2)
M8 Interscrew (x1)
M8 Nyloc Nut (x1)
Cable Manager Tube Clip (x1)
5mm Allen Key (x1)
M4x16 mm Countersunk Screw (x3)
Desk Clamp Box
M8 Desk Clamp Screw (x1)
Pressure Plate (x1)
Inner Tube Post
Desk Clamp Bracket (x1)
Component Checklist
Threaded Rod and Top Cap (x1)
Component Checklist
Possible Configurations
Spacedec Acrobat Swing Arm Double can be assembled in a number of different configurations depending on the users requirements.
Two such examples are shown below and right.
Arm, Spacer, Arm, Spacer Side by side displays
Arm, Arm, Spacer, Spacer Back to Back displays
Page 2
Spacer Tube (x2)
Internal Tube Post
Top Cap and Threaded Rod
C
C.1. Desk Clamp
To assemble the Desk Clamp Assembly, first place the M8 Nyloc Nut inside the Base Casting with the Plastic Ring facing down, then screw the Base Casting on to the Desk Clamp Bracket using the M4x16mm Countersunk screws.
C.1.1. Assemble the Desk Clamp
C.1.2. Attaching the Desk Clamp
Tighten
Firmly
Base Casting
Desk Clamp Assembly
Desk Top
Pressure Plate
M8 Desk Clamp Screw
5mm Allen Key
Adjust the Desk Clamp to suit your desk thickness by turning the M8 Desk Clamp. Screw with the supplied
5mm Allen Key
Suits 12mm (1/2”) to 38mm (1
1
/2”) thick work surfaces
Pressure Plate
M8 Desk Clamp Screw
C.1.3. Attaching the Swing Arm Post
Use the Top Cap Tool to tighten the Threaded Rod into the Base Casting as shown below.
Top Cap Tool
Threaded Rod
Base Casting
NOTE: Desk Clamp Assembly is suitable for square edged desks only.
Tighten
Firmly
NOTE: It is
recommended
that the Desk
Clamp be
attached to
the rear or
side edge
of the work
surface
DESK CLAMP ADJUSTMENT RANGE
M4x16mm
Countersunk
Screw (x3)
Base
Casting
Desk
Clamp
Bracket
M8 Nyloc Nut
Component Checklist
A
Check you have received all parts against the Component Checklist on the previous page.
Assemble the Arm
B
Threaded Rod
and Top Cap
Swing Arm
Assembly
(x2)
Internal Tube Post
Spacer Tube
(x2)
Cable Manager
Tube Clip
B.2. Assemble the Swing Arm
Assemble the Swing Arm in the desired configuration ensuring all components are used as shown.
You will need to disassemble the Tube Assembly before assembling the Swing Arm
B.1. Disassemble the Tube Assembly
Mounting Options
Page 3
Attaching the Displays
D
75mm x 75mm (3” x 3”) mounting hole pattern
Display
4x10mm Screws
75mm
(3”)
75mm (3”)
100mm x 100mm (4” x 4”) mounting hole pattern
NOTE:
Ensure that the
flat side of each
Extension Clip sits
against the back
of the display
Extension Clips
4x12mm or 4x16mm Screws
100mm
(4”)
100mm (4”)
Display
Installing Cable Management
E
E.1. Push the four supplied Cable Clips into the holes on the underside of the Swing Arm Double as shown.
E.2. Feed the cables into the Cable Wrap Applicator.
E.3. Insert the Cable Wrap Applicator into the Cable Wrap as shown.
E.4. Squeeze the nose of the Applicator and place inside the Cable Wrap ensuring that the opening edges of the Cable
Wrap face towards the nose of the applicator as shown in diagram.
E.1.
Push in Clips
Nose
E.2. E.3.
E.4.
C.2.1. Drill Mounting Hole
Drill a 13mm (½”) hole in your work surface at the desired location for your arm.
C.2.2. Install as shown
Insert the M8 Interscrew up through the hole in the work surface. Using both hands, secure the M8 Interscrew with the 5mm Allen Key supplied in the Desk Clamp Box and use the other hand to tighten the Threaded Rod into the Interscrew with the supplied Top Cap Tool. (see diagram C.2.3.)
5mm Allen Key
Top Cap Tool
Threa ded Rod
Washer
Base Ca sting
M8 Interscrew
13mm (1/2”) Hole
Desk Top
Tighten
Firmly
C.2.3.
C.2. Bolt Through
Attaching the Cable Wrap to the Arm
F
F.1. Position the displays at their highest
possible position to ensure that there is sufficient cabling at the end of the arm so the cables are not stretched or pulled out when the displays are moved.
BEFORE PROCEEDING TO THE NEXT STEP PLEASE NOTE: Swing Arm Double will only work when a display is properly installed.
DO NOT adjust tension screws or gas strut until your display has been attached.
Cable Clips (x4)
Cable Tube Manager Clip
Cable Wrap
Mounting Options Continued
C
Page 4
As LCD Manufacturers are constantly releasing new monitor models, Atdec does not accept responsibility if the mounting hole pattern does not comply with the international VESA standards. Due
to continuing product development, the manufacturer reserves the right to alter specifications without notice. Published: 08.11.07
Installation Complete
Ergonomic Guidelines
When mounting the Spacedec Acrobat Swing Arm Double, ensure the correct focal distance can be achieved for ultimate visual comfort.
G
Recommended Mounting Position
Adjusting the Display
The Spacedec Acrobat Swing Arm Double comes factory set to support 6kg displays. Adjust the arm to suit the weight of your display as shown in the following steps:
3kg
display
9kg
display
Arm
5mm
Allen key
Gas Strut
Raise Gas Strut to suit lighter display
Lighter
Heavier
Lower Gas Strut to suit heavier display
G. 3 .1. Depending on the weight of the display, it may be necessary to adjust the arm. This can be done by using the 5mm Allen Key supplied in the Desk Clamp Box.
G.3.2. If the arm tends to automatically rise or fall when the display is attached, it will be necessary to make small adjustments to the gas strut. (see diagram on the right)
G.3.3. If the arm tends to rise, the gas strut position should be raised. If the arm tends to fall, the gas strut position should be lowered.
It is possible to control the amount of resistance in the Pivot Head to suit your display.
To increase the resistance of the Pivot Head to suit heavier displays, use the 5mm Allen Key supplied in the Desk Clamp Box to tighten the interscrew in a clockwise direction.
To decrease the resistance of the Pivot Head to suit lighter displays, loosen the interscrew in an anti-clockwise direction.
NOTE: It is recommended the Pivot Head be left at the factory setting for best performance.
Pivot Head
Interscrew
5mm Allen Key
Loosen
Tighten
G.2. Adjusting the Pivot Head Resistance
G.3. Adjusting the Swing Arm/Gas Strut Resistance
Depending on the weight of the display, it may be necessary to make adjustments to the Ball Joint Mechanism. If the display doesn’t hold its position or is too resistant, adjust the four tension screws located around the Ball Joint (see diagram on the right) using the supplied 2.5mm Allen Key. Check the display, and then adjust again if necessary.
NOTE: Be sure to adjust screws evenly.
Tighten
Loosen
Tension Screws (x4)
Ball Joint
2.5mm Allen Key
G.1. Adjusting the Ball Joint Resistance
H