Atdec SD-SA-DK Installation manual

G
Ergonomic Guidelines
Recommended Mounting Position
When mounting the Spacedec Acrobat Swing Arm, ensure the correct focal distance can be achieved for ultimate visual comfort (Refer to Recommended Viewing Distance / Height below)
Desk Clamp
Desk Clamp Bolt Through
Base Casting
13mm (
1
/
2
50mm
(2”)
”) hole
H
Adjusting the Display
The Acrobat Swing Arm comes factory set to support 6kg displays. Adjust the arm to suit the weight of your display as shown in the following steps:
H.1. Adjusting the Ball Joint Resistance
Depending on the weight of the monitor, it may be necessary to make adjustments to the Ball Joint Mechanism. If the monitor doesn’t hold its position or
Tighten
Tension Screws (x4)
is too resistant, adjust the four tension screws located around the Ball Joint (see diagram on the right) using the supplied 2.5mm Allen Key.
2.5mm Allen Key
Loosen
Ball Joint
Check the display, and then adjust again if necessary.
NOTE: Be sure to adjust screws evenly.
H.2. Adjusting the Pivot Head Resistance
SPACEDEC ACROBAT
Component Checklist
Single Arm
Swing Arm Assembly (x1)
16mm Cable Wrap (x1)
Threaded Rod and Top Cap (x1)
Spacer Tube (x2)
Inner Tube Post
Installation Instructions
SWING ARM
Bits Box
Cable Wrap Applicator (x1)
M8 Interscrew (x1)
Washer (x1)
Cable Tube Manager Clip (x1)
Cable Clip (x2)
Base Casting (x1)
M4x16mm Countersunk Screw (x3)
Recommended Viewing Distance / Height
B
Ergonomists recommend that the optimal position of your screen should be slightly below eye level. When looking at the screen’s centre the user should have a downward visual angle of approximately 10°-20°. As a guide, the height (h) of your display should approximately be as follows:
1
Tall Male (Max): 560mm (22”) Tall Female (Max): 520mm (20
1
/
Short Male (Min): 368mm (14
2”) Short Female (Min): 356mm (14”)
For visual comfort, a viewing distance (d) between 500mm (19
/
2”)
1
/
2”) to 750mm (29
1
/
2”) is
recommended.
Angular adjustments to reduce reflection on your monitor should range between 5° forward tilt to 15° backward tilt.
HORIZONTAL SIGHT LINE (d)
15°
It is possible to control the amount of resistance in the Pivot Head to suit your display.
To increase the resistance of the Pivot Head to suit heavier displays, use the 5mm Allen Key supplied in the Desk Clamp Box to tighten the interscrew in a clockwise direction.
To decrease the resistance of the Pivot Head to suit lighter displays, loosen the interscrew in an anti-clockwise direction.
NOTE: It is recommended the Pivot Head be left at the factory setting for best performance.
H.3. Adjusting the Swing Arm/Gas Strut Resistance
H.3.1. Depending on the weight of the monitor, it
may be necessary to adjust the arm. This can be done by using the 5mm Allen Key supplied in the Desk Clamp Box.
H.3.2. If the arm tends to automatically rise
or fall when the display is attached, it will be necessary to make small adjustments to the gas strut. (see diagram on the right)
3kg
Monitor
9kg
Monitor
5mm Allen Key
Arm
Interscrew
Loosen
Tighten
Lighter
Heavier
Pivot Head
Gas Strut
Raise Gas Strut to suit lighter display
Desk Clamp Box
5mm Allen Key (x1)
Pressure
A
Component Checklist
Desk Clamp Bracket (x1)
M8 Desk Clamp
Plate (x1)
Screw (x1)
Mounting Fasteners
Check you have received all parts against the Component Checklist above.
B
Assembling the Arm
B.2. Assemble the Swing Arm
B.1. Disassemble the Tube Assembly
Assemble the Swing Arm as shown:
You will need to disassemble the Tube Assembly before assembling the Swing Arm
Top Cap and
Top Cap and
Threaded Rod
Internal
Tube Post
Threaded Rod
M8 Nyloc Nut (x1)
2.5mm Allen Key (x1)
M4x10mm Screw (x4)
M4x12mm Screw (x4)
Extension Clip (x4)
Top Cap Tool (x1)
M4x16mm Screw (x4)
Arm Assembly
CENTRE OF SCREEN
10°-20 °
(h)
H.3.3. If the arm tends to rise, the gas strut
position should be raised. If the arm tends to fall, the gas strut position should be lowered.
5mm
Allen key
Lower Gas Strut to suit heavier display
Installation Complete
As LCD Manufacturers are constantly releasing new monitor models, Atdec does not accept responsibility if the mounting hole pattern does not comply with the
international VESA standards. Due to continuing product development, the manufacturer reserves the right to alter specifications without notice.
Published: 12.04.07
Spacer
Tube (x2)
Internal Tube Post
Spacer
Tube
Cable Manager
Tube Clip
Spacer
Tube
C
Mounting Options
There are two Mounting Options: Desk Clamp and Bolt Through To use the Desk Clamp (Suits desktop thicknesses of 12mm-38mm [ instructions at follow the Bolt Through instructions at
C.1. Desk Clamp
C.1.1. Assemble the Desk Clamp
C.1. To use the Bolt Through system (Suits desktop thicknesses of 12mm-40mm [
C.2.
DESK CLAMP ADJUSTMENT RANGE
To assemble the Desk Clamp Assembly, first place the M8 Nyloc Nut inside the Base Casting with the Plastic Ring facing down, then screw the Base Casting on to the Desk Clamp Bracket using the M4x16mm Countersunk screws.
M8 Nyloc Nut
M4x16mm
Countersunk
Screw (x3)
Base
Casting
Desk
Clamp
Bracket
Adjust the Desk Clamp to suit your desk
thickness by turning the M8 Desk Clamp
Screw with the supplied 5mm Allen Key
D
Attaching the Display
C.2. Bolt Through
Direct Mount Configuration
1
1
/
-1
/
2
]) follow the Desk Clamp
2
1
/
-1
2
1
/
])
2
C.2.1. Drill Mounting Hole
Drill a 13mm (1/2”) hole in your work surface at the desired location for your arm.
75mm x 75mm (3” x 3”) mounting hole pattern 100mm x 100mm (4” x 4”) mounting hole pattern
Display
75mm
(3”)
4x12mm or 4x16mm Screws
100 mm
(4”)
Extension Clip
C.2.2. Install as shown
Suits 12mm
1
/
”) to 38mm
(
2
1
/
”) thick
(1
2
Work Surfaces
Pressure Plate
M8 Desk Clamp Screw
NOTE : It is
recommended
that the Desk
Clamp be
attached to the
rear or side
edge of the
work surface
Insert the M8 Interscrew up through the hole in the work surface.
Using both hands, secure the M8 Interscrew with the 5mm Allen Key supplied in the Desk Clamp Box and use the other hand to tighten the Threaded Rod into the Interscrew with the supplied Top Cap Tool.
Top Cap Tool
75mm (3”)
4x10mm Screws
E
Installing Cable Management
Display
E.1. Push the two supplied Cable Clips into the holes on the underside of the arm as shown in diagram
100 mm (4”)
NOTE:
Ensure that
the flat side of
each Extension
Clip sits against
the back of the
display
E.2. Feed the cables into the Cable Wrap Applicator.
Plastic Ring
C.1.2. Attaching the Desk Clamp
Base Casting
Desk Clamp Assembly
M8 Desk Clamp Screw
Tighten
Firmly
NOTE: Desk Clamp Assembly is suitable for square edged desks only.
Desk Top
Pressure Plate
5mm Allen Key
C.1.3. Attaching the Swing Arm Post
Use the Top Cap Tool to tighten the Threaded Rod into the Base Casting as shown below:
Top Cap Tool
Tighten
Firmly
Threaded Rod
Base Casting
13mm (
1
/
”) hole
2
Washer
M8 Interscrew
5mm Allen Key
Threaded Rod
Tighten
Firmly
Base Casting
E.3. Insert the Cable Wrap Applicator into the Cable Wrap as shown.
E.4. Squeeze the nose of the Applicator and place inside the Cable Wrap ensuring that the opening edges
of the Cable Wrap face towards the nose of the applicator as shown in diagram.
E.1.
Push in Clips
F
Attaching the Cable Wrap to the Arm
E.2. E.3. E.4.
Nose
F.1. Position the display at its highest possible position to ensure that there is sufficient cabling at the end of
the arm so the cables are not stretched or pulled out when the display is moved.
F.2. Clip the cable wrap into the Cable Tube Manager Clips as shown in diagram.
F.1.
Cable Clips
Display at highest point
Cable Tube Manager Clip
Cable Wrap
BEFORE PROCEEDING TO THE NEXT STEP PLEASE NOTE:
Swing Arm will only work when a display is properly installed.
DO NOT adjust tension screws or gas strut until your display has been attached.
F.2 .
Loading...