Installation Method

A Recessed Junction box
Cover Removal
Remove the Allen Screws on
Mounting
Drill mounting holes according
Connect the electrical cables
Replace Cover
Replace the cover
NOTE: The cover is earthed
Install the two Allen Screws

Daily Use & Maintenance

If using a chemically
After turning off the power supply, remove cover and
Clean away any dirt that has deposited inside the hand
Remove the motor housing and check the brushes on the
ATC CHEETAH

Hand Dryer

First Fix
should be installed to allow hand dryer to sit flush with the wall. Height should be determined from table overleaf
either side of the hand dryer, lift off cove. Make sure to put the cover in a location where it will not be damaged.
to the area that the Hand Dryer is to be installed in (see Overleaf) & mount the hand dryer.
and ensure correct Polarity.
NOTE: The Sensitivity of the Cheetah is fixed. Do not install with anything below the dryer that can start the dryer. E.g. Shelves, Radiators, above sinks etc.
External Maintenance:
Regularly clean cover with a soft cloth, do not use harsh detergents, Abrasive, Acid or Alkali Based Cleaning products or cleaning brushes as they may damage the cover finish.
impregnated cloth please test on an inconspicuous area prior to use to check suitability.
Internal Maintenance
check all connections,
dryer.
motor for wear. Replace worn Brushes.
Please note: Brushes are a consumable item and are not covered under warranty
Method Of Operation:
Insert the back of your hands
Turn your hands over
Infra-Red Sensor
Rub your hands
together until dry
Z-2281 M/W/B
through the mounting screws. Please ensure they are firmly attached prior to re-energising the power supply.
and test the hand dryer

Packing List

ATC Cheetah Hand Dryer User Manual 5mm Plastic wall plug x4 Allen Key 30mm Self Tapping Screws x4

Specification

230v ~ 50Hz
Sound Level
Phase
Sensor Range
15-20cm (fixed)
Load
1475w
IP Class
IPX1
Air Speed
65m/s
Size (mm)
295x320x170
Heat level
900w
Nett Weight
4.5kg
Features
Infra-Red operated Hygienic High Speed hand dryer
Solid Stainless Steel or Painted Steel
Auto stop Function after4s to prevent overrun
Product Description
Circuit Diagram

Precautions before installation

Do not install in the following locations; Installation in these areas can cause the unit to malfunction
Areas with Temperatures below 0oC or above 40oC
In direct Sunlight or areas above reflective surfaces
Areas where the unit can come into direct contact with
Above counters or sinks
Areas of High moisture and Humidity levels
Locations containing Corrosive or Oxidizing gasses
Areas at Altitude above 2000m
The Chart below shows the recommended mounting
Make sure the dryer is mounted more than 150mm away
Ensure the wall the hand dryer is mounted on is flat and
Do not mount the unit behind doors where the opening of
Do not install the dryer with the power connected; the
5
Voltage
75
Cover
Countersunk Cover Screw
Allen Key
Motor Cable Entry Hole
P.C.B
Heating Element
power ind ic at or
Infra-Red Sensor
Air outlet
Check i nd ic at or
dB@1
m
sensor plug
Environmental Protection
Waste electrical products should not be disposed of with household waste, please recycle this product where the facilities exist.
Please check with your local authority

Warranty

ATC Electrical &Mechanical provides a 2-year limited parts warranty for the are followed: Installation and use of the hand dryer is in accordance with the instruction manual, which is packed with hand dryer.
In order to arrange parts for the hand dryer the following information is required.
Receipt number: ____________________________________________
Z-2281 M/W/B
as long as the following conditions
water

Installation Location

height for the Hand Dryer.
from walls on either side of the dryer.
smooth.
the door may damage the dryer
dryer must be connected by a qualified electrician when being installed.
Date of Manufacture: __________________________________________
Date of Purchase: __________________________________________
The power cord Supplying the hand dryer should be at least
1.5m² 2 Core & Earth