Contents
Foreword/Description/Responsibilities∙∙∙1 8.Failure Analysis and solutions
1.Product instruction 1)Machine failure and solution∙∙∙∙∙∙∙∙28
1) Application∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙2 2)Vacuum pump failure & solution∙∙29
2) Product Features∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙2 3) Solenoid valve failure & solution∙30
3) Work Principle∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙ 2 4).Sealing problem and solutions∙∙∙∙30
4) Product Model Name∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙2 9. Equipment storage
5) Main parameters∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙3 1)short time storage∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙30
2.Safety 2)Long time storage∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙30
Ready to use∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙9 3) Start machine after storage∙∙∙∙∙∙∙∙31
1) Safety precautions∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙9
2) Use of the environment∙∙∙∙∙∙∙∙∙∙∙∙10
1) Equipped with carton packaging∙∙∙∙∙∙∙∙10
2) Equipped with wooden packaging∙∙∙∙∙10
1) Installation condition∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙11
2) Installation Environment∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙12
3) Filling Oil∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙12
4) Electrical connection ∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙13
5) Connection inflation system∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙14
6) Connecting vacuum system∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙15
1) control panel∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙15
2) Turn on the power∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙16
3) Check the pump motor rotation direction∙∙∙∙∙∙16
6.Standard operation and parameter settings
1) Standard operating procedures∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙17
2) Control program cycle description∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙18
3) parameter settings∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙20
4) Optimal parameters∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙21
5) Packaging liquid products∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙22
6) Best packaging∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙22
1) Standard maintenance schedules∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙23
2) Vacuum pump maintenance∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙23
3) Vacuum pump oil∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙26
4) Replace high temp. tape, electric heating wire∙∙∙∙∙∙∙∙∙∙26
5) Replace silicone∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙27
6) Replace the seals∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙28

Foreword
Thanks for choosing DZ series vacuum packing machine!
This manual contains the following:
Installation and commissioning
This specification describes the installation and use of the product, including the
following details: product handling, storage, installation, startup, operation conditions,
maintenance, Troubleshooting and maintenance.
Attention:
Before using the product, please be sure to carefully read this manual and fully
Ensure that the final use of the product or equipment operating personnel
management with this specification
Keep after reading this manual, and always place readily accessible place for easy
If you have any questions, please contact the manufacturer or supplier.
This specification is carefully edited for any problem or misunderstanding among
the consequences of the manufacturer does not assume any responsibility.
Manufacturer is not responsible for any damage or problems not adopted the
provisions of parts caused.
The manufacturer reserves the right to modify parameters or accessories, without
Manufacturer All rights reserved. Without written permission, reproduction of any
portion of this specification is prohibited.
Terminology
High Temperature Tape: PTFE coated fabrics, has the characteristics of high
temperature resistance and non-stick, usually called high temp. tape.
Heating plate: a combination of aluminum (or heating plate), electric flat wire, high
temperature tape and other parts made collectively heating plate
1- Product instruction

1). Application:
Vacuum packaging machine has excellent features, easy maintenance, simple
operation, wide application and so on. Apply to the composite film or plastic composite
film and other flexible packaging materials. It can pack solid, liquid, powder mushy
food, food, fruit, aromatic seeds, drugs, chemical products, electronic products,
precision instruments products, rare and precious metals and other items. The
packaged product can prevent oxidation, mildew, insects, rotting, damp, prolong the
storage period.
2). Product Features:
The machine is easy to use. It is fully automatic process control: pressure the
vacuum lid, vacuum or after filling evacuation gas (optional), heat sealing, label
printing, cooling, vacuum deflated and cover open.
Sealing temperature can be controlled by the adjustment time, and suit for
different materials of bags.
Emergency stop button is on the control panel, such as find abnormal situation
process, press the emergency stop button to interrupt the packaging process.
3).Work Principle:
Put the bag into the vacuum chamber, pressure the vacuum chamber lid, start
the machine, run the vacuum pump, a sealed vacuum space is formed. After vacuum is
complete, if have the inflatable function, inflating the vacuum chamber firstly. Then use
the difference of the vacuum chamber and the outside atmospheric pressure, the
balloon drives heated sealing plate against the spring force to drop, pinch sealing bag
fitted with electric hot plate flat, coupled with the low voltage and high current electric
make heating wire hot, sealing the bag, then cooled, the vacuum packaging process is
completed
4). Product Model Name:

5).Main parameters
Setting section:
1, connect voltage, power indicator light on, cycle display "□" on the panel, which
indicates the standby state, then can set parameters.
2, Press “set” button, vacuum light on, enter into set parameters of vacuum, press the
"+""-" button. To select the vacuum time (range 0-99 seconds)
3, after finished set vacuum time, press the “Set” button and indicator light filled with
nitrogen gas into nitrogen filling time setting mode, press "+""-" button to select the
nitrogen filling time (range 0-9.9 seconds), Note: Some models without nitrogen filling
function but with a cutout feature, this is the cutout time. Most models are neither
functional nor nicked with nitrogen function, this setting does not show, hidden suction
set (work) into the seal after the completion of the set (work) status
4, after enter into sealing status, heat indicator light, press the "+""-” to set the heating
time (range 0-9.9 seconds) should be set to gradually increase the short to long heating
time until get the perfect sealing effect.
5, heating time selected, press” set” button to setting, enter into the cooling time
setting state, cooling indicator light, press the "+""-" button to select the cooling time
(range 0-99 seconds).
6, after the cooling time selected, press” set”, then the panel display "ED", means the
temperature setting state.
7. Press the temperature selection button and choose the appropriate temperature,
the corresponding temperature indicator light (temperature high, medium and low
block) press” set “ button to setting. Meantime, all the settings have been completed,
the power indicator light flashed, that enter the work status, can start work. Note: The
parameter settings and machine work can’t operate in same time, cannot be setting
when the machine work status, if want parameters to be adjusted, press the stop
button (emergency stop button), the machine in standby mode, press the setting
button, follow above steps to set the required parameters.
No. of Sealing Bars for Each Chamber
Material for Vacuum Chamber
External Dimension (L×W×H)

No. of Sealing Bars for Each Chamber
Material for Vacuum Chamber
External Dimension (L×W×H)
Distance of Two Sealing Bars
No. of Sealing Bars for Each Chamber
Material for Vacuum Chamber
External Dimension (L×W×H)
Distance of Two Sealing Bars
No. of Sealing Bars for Each Chamber
Material for Vacuum Chamber
External Dimension (L×W×H)
Distance of Two Sealing Bars

1, set the vacuum time: Press” SET” shown below;
Parameter setting; ① vacuum time setting ②heating time setting ③cooling time
setting
Press” ENVERLOP “(sealing selection) button display as follows:
Vacuum time setting: the current setting is: 40S, press ADD (increase) to increase,
press DEC (decrease) to reduce, after modification, press ENVERLOP (sealing selection)
button to confirm save.
2, Heating time setting;
Press the SET, press ADD (increase) to add to the display as follows:
Parameter settings: ① vacuum time setting ②heating time setting ③Cooling time
setting: Press ENVERLOP (sealing selection) button is show below:
Heating time set, the current setting value; 10s, press ADD (increase) to increase, press
DBL (reduction) to reduce, modify the finished press ENVERLOP (hot key) button to
save.
3,Cooling time setting: Press SET, press ADD (increase) to add to the display as follows:
Parameter settings: ①vacuum time setting ②heating time setting ③cooling time
setting: Press ENVERLOP (sealing selection) button display as follows: cooling time
setting, the current setting value: 20s, press ADD (increase) to increase, press the DEL
(reduction) to reduce, after completing press ENVERLOP (sealing selection) button to
confirm save.
4, System language selection: Press SET , press ADD (increase) to add to the display as
follows:
Parameter settings: ①vacuum time setting ②heating time setting ③cooling time
setting ④system language selection : Press ENVERLOP (sealing selection) button show
below:
① Chinese, ②English. Press ADD (increase) to increase, press the DEL (reduction) to
No. of Sealing Bars for Each Chamber
Material for Vacuum Chamber
External Dimension (L×W×H)
Distance of Two Sealing Bars

reduce, modify subsequent ENVERLOP (sealing selection) for save.
5, Rest factory settings: Press SET, press ADD (increase) to add to the display as follows:
Parameter settings: ①vacuum time setting ②heating time setting ③cooling time
setting ④system language selection ⑤restore the factory settings, Press ENVERLOP
(sealing selection) button show below:
Are you sure to restore the factory settings? if yes, then press ENVERLOP (sealing
selection) button. If not, press SET button to exit.
6, about the system: Press SET, press ADD (increase) to add to the display as follows:
Parameter settings:④ language selection ⑤ Restore factory settings About System:
Press ENVERLOP (sealing selection) button confirm the display as follows: firmware
version: V3.04, press ENVERLOP (sealing selection) button or SET to exit.
No. of Sealing Bars for Each Chamber
Material for Vacuum Chamber
External Dimension (L×W×H)
Distance of Two Sealing Bars
No. of Sealing Bars for Each Chamber
Material for Vacuum Chamber
External Dimension (L×W×H)
Distance of Two Sealing Bars

No. of Sealing Bars for Each Chamber
Material for Vacuum Chamber
External Dimension (L×W×H)
Distance of Two Sealing Bars
No. of Sealing Bars for Each Chamber
Material for Vacuum Chamber
External Dimension (L×W×H)
Distance of Two Sealing Bars
No. of Sealing Bars for Each Chamber
Material for Vacuum Chamber
External Dimension (L×W×H)
Distance of Two Sealing Bars

No. of Sealing Bars for Each Chamber
Material for Vacuum Chamber
External Dimension (L×W×H)
Distance of Two Sealing Bars
No. of Sealing Bars for Each Chamber
Material for Vacuum Chamber
External Dimension (L×W×H)
Distance of Two Sealing Bars
No. of Sealing Bars for Each Chamber
Material for Vacuum Chamber
External Dimension (L×W×H)
Distance of Two Sealing Bars

2.Safety
1). Ready to use:
This specification describes in detail the product handling, storage, installation,
startup, operation conditions, maintenance, troubleshooting and maintenance and
installation of the machine, it is recommended by a trained professional.
Make sure to follow the maintenance instructions
Before using the machine, make sure to read this manual and fully understand.
If you have any questions, please contact the manufacturer or supplier.
2). Safety precautions:
Make sure the machine using the power supply voltage, frequency, avoid errors. No
matter three phase four-wire (AC380v/50Hz) or single-phase (AC220v/50Hz)power
supply, yellow and green wire to ground protection, cannot be removed.
Avoid power cord compression, pull, roll power cord when it is not used.
Do not use in corrosive, big powder place.
Do not arbitrarily replace parts on the machine.
Please keep the machine clean inside and outside, as well as the removal of the
vacuum chamber adhesive material.
When the machine is not in use should be cut off the power.
Please change the vacuum pump oil in time.
Save them for future reference.
The product according to the latest technical and safety standards for manufacturing, if
used improperly, may be dangerous or damage, safety precautions Keywords "Danger",
"Warning", "Caution" notes.
No. of Sealing Bars for Each Chamber
Material for Vacuum Chamber
External Dimension (L×W×H)
Distance of Two Sealing Bars

Danger! Ignore the major issues of this security will lead to serious or
Warning! Ignore the major issues of this security will lead to serious or
Be careful! This security will ignore the major issues cause personal injury
3). Use of the environment:
This product is designed to run at room temperature, the indoor environment. If the
harsh environmental conditions (such as ambient atmosphere is corrosive, ambient
temperature is above 33℃or below 5℃), please contact the manufacturer or supplier.
This product is in operation, the vacuum pump oil can be separated to the maximum
extent, but not complete separation.
Be careful! Harmful to health!
Vacuum residual oil will be present in the air.
Long-term inhalation of gases harmful to health
Use of this product room must have good ventilation.
3. Handling equipment:
1). Equipped with carton packaging
If the machine with the included expansion pad cartons:
Remove the expansion pad firstly
If the machine with a foam material carton packaging:
Remove the foam material firstly from the carton.
2). Equipped with wooden packaging

If the chassis is bolted to the wooden box:
Unscrew the fastening bolts and wooden products chassis.
If the lock on a wooden box with fixed chassis:
Remove the locking band
Be careful! Do not walk under lifting objects, stay and work.
Note: Please use additional tape or sling system in place lifting machine, pay attention
to the position of the center of gravity of the machine.
Make sure the sling safe and reliable system that is still in the machine.
It will be held on the hanger hook with safety locks.
Lifting crane.
Note: floor machines are fitted with casters, it can be driven on a flat ground.
Casters such as having a locking mechanism, loosen the caster before moving the
machine locking mechanism.
CAUTION! Damage to the machine!
①Tilt filled with oil vacuum pump will result in a large amount
of oil into the pump chamber.
② Start vacuum pump, if the pump cavity of excess oil, may
③ After vacuum oiling and can no longer handle.
Note: Before transporting the machine, make sure that the vacuum pump oil drained.
4.Installation
Before operation, please read this manual carefully. With this manual book, learn how
to install, startup, maintenance and use of the machine. Machine problem because
without reference to the specification and cause, the manufacturer will not be liable.
Manufacturers hope customer can use this machine without trouble in a long-term. If
you have any questions, please feel free to contact manufacturers and suppliers.
1).Installation condition
Be careful! Damage to the machine!
If the machine does not meet the prerequisites installed, it will damage the machine.
Risk of injury!
Be sure to observe the machine installation prerequisites.

Make sure that the installation environment meets the basic regulations.
2).Installation environment
Surroundings should not have flammable and explosive gas.
Ambient temperature: 5-30 ℃. If you need to operate the machine in any other
environment, please contact the manufacturer or supplier.
Environmental pressure: standard atmospheric pressure.
Make sure the power environment meets the requirements (see the nameplate on
Must keep machine upright when moving or transporting, tilt the machine may
Make sure the machine in horizontal position. It is one element of insecurity
To ensure cooling, must be sufficient space around the machine can be well
ventilated, at least10cm interval.
Do not expose the machine to direct heat or steam device (such as a steamer or
Ensure there is enough space to change the vacuum pump oil replacement of
wearing parts.
3). Filling Oil
Be careful! Damage to the machine!
New machine does not contain vacuum pump oil.
Running oil-free vacuum pump in a short time will damage the vacuum pump
Before starting the machine, ensure the pump has been filled with oil.
Note: To prevent vacuum pump oil overflowed into the oil mist filter, vacuum pump
must be free of oil transportation.
Be careful! Damage to the machine!
Injection vacuum pump oil from other locations may damage the vacuum pump.
Vacuum pump oil should only filling hole injection.

When the pump working, the fuel tank filled with high temperature and pressure oil mist.
If filling hole open, there is risk of injury from hot oil mist.
Only the vacuum pump stops running, the oil filler plug can be rotated.
The vacuum pump is running, you must tighten the oil filler plug.
Use the correct size wrench to remove the oil filler plug.
Inject the right amount of the right pump for oil, vacuum pump please refer to the
"special vacuum pump oil" section.
Ensure that the oil level between 1/2 to 3/4 of oil level mirror.
Make sure the filler plug is installed in the ring and intact, be sure to replace if
Check the oil level in the oil level between 1/2 to 3/4 of the mirror, if the oil level is
less than 1/2 of the oil level glass, please refueling.
If the oil level in the oil level between 1/2 to 3/4 of the mirror, install the machine
cover.
4). Electrical connection
Danger! Electric shock dangerous!
Make sure that your outlet has a protective ground wire.
Be careful! Power does not match the damage to the machine!
Please check the power parameters of the machine, refer to the machine nameplate.
Observe the accident prevention measures and safe handling guidelines promulgated
by the State.
Check whether the use of the power supply voltage and a predetermined voltage
on the rating plate is consistent.
When the electrical connections to the three-phase power supply, check the
direction of rotation of the vacuum pump.
Ensure that the machine is properly connected to a grounded outlet, in order to
avoid fire or electric shock (ground wire is yellow-green wire)
The cable must be able to move freely, to avoid the squeeze.
Once the cable is damaged, replace it immediately.
Machine fails or requires maintenance, please turn off the power.
If the machine is idle for a period of time, please put away power.

If you are using a single-phase power connector machine
Plug the power cord with an accurate terminals of the machine (if have)
Connect the other end of the power socket.
If you are using three-phase power machines
The power supply is connected to the power supply box accurate.
Connecting the ground wire.
CAUTION! Damage to the machine!
Pump motor rotation wrong direction, it will damage the vacuum pump in a short time.
Before starting machine, make sure that the pump rotation direction is correct.
For three-phase motor pump configuration
According to the signage, determine the rotation direction of vacuum pump.
Turn on the power switch, less press the vacuum lid, run the vacuum pump motor
(Refer to "Start" section).
If possible, check the vacuum fan motor and determine the direction of rotation
when the fan is downwards.
If you cannot check the direction of rotation of vacuum pump motor rotation,
carefully listen to the operation sound of vacuum pump, vacuum operated in
reverse will be issued a "buzzing" noise, and to check vacuum gauge, vacuum
pump cannot be operated in reverse vacuum.
If you need to change the direction of rotation of the vacuum pump:
Exchange three-phase power wire any two wire (three-phase motors )
5).Connection inflation system (for inflatable vacuum packaging machine )
Warning! Danger of explosion!
Do not use flammable or other oxygen-containing components of more than 20% of the
gas mixture.
Otherwise there is a risk of explosion.

Be careful! Damage to the machine!
Origin shall not exceed one atmosphere pressure, otherwise it will damage the machine.
Never use flammable or other mixed gas containing oxygen, otherwise there will
be an explosion hazard. Missed this provision will lead to an accident or damage,
the manufacturer will not bear any responsibility.
Air tank must be properly closed. When not adopting inflated function or machine
is not used, you must turn off the main switch of tank.
Pressure valve on the gas cylinder must set the value of not more than
atmospheric pressure (0.1Mpa), otherwise it will damage the machine.
Inflatable tubular threaded joint diameter machine is 8mm. Connector is located
on the side or back of the machine.
For cylinders used in case of doubt, please contact the manufacturer or supplier.
Note: If you make too many pneumatic vacuum of 0.06Mpa above, began sealing
function, the sealing function may not be completed properly.
6).Connect the vacuum system (for external vacuum pump set)
If you buy inside pump vacuum machine, you do not need to proceed with the
If you purchased an external vacuum pump type machine, connect proper pump
before using.
5. Start-up & Debugger
1). Control panel
Button panel presentation
DZ series panel (without gas filled function)
shows the power status of the machine, it will be light

on when machine connect voltage
Used to set the time vacuum, range from 0-60 seconds.
Setting the sealing time, range of 0-6 seconds.
Setting the Cooling time, range of 0-6 seconds.
Show the vacuum chamber vacuum degree
Sealing temperature adjust
Adjust sealing temperature.
Press it machine stop work immediately
Computer board panel presentation
Display program running function status, decreasing the
digital display.
Display the selected machine parameter settings, a digital
display.
Standby Display "_"
Deflated display state "□□"
Program run is completed the display "Ed".
Press it machine stop work immediately, and turn to loose
air function, vacuum cover auto jump up
Press 1time-low temp. Press 2time-medium temp.press3
time-high temp. Press 4time- stop heat.
Press the button once to adjust the parameters of the
selected function program increased by one unit.
Press and hold the button, value will increase at a rate of
about 5 values per second.
Press once, the parameters of the selected function
program is reduced by one unit each.
Press and hold the button, value will decrease at a rate of
about 5 values per second.
Press enter into vacuum time adjust, up and down buttons

to adjust the vacuum time in the range of (0-99) seconds.
Indicator lights (red) when machine during the operating
Press enter into sealing time adjust, up and down buttons
to adjust the sealing time in the range of (0-6) seconds.
When machine work, indicator light (red) when machine
do sealing function.
When using the temperature selector button to select a
certain temperature, the corresponding temperature
indicator light (red)
shows the vacuum chamber pressure.
Machine hot plate sealing surface temperature up to 200℃.
Even after cooling, the surface still has a high temperature.
Vacuum reside exhaust gas there.
Long-term inhalation of gases harmful to health.
Use of this product room must have good ventilation.
6.Standard operation ¶meter setting
Please refer to this manual to operate the machine.
Shall not remove necessary protection covers or housing.
Do not use this machine to pack goods which will be damaged during vacuum or
If you operate the machine and function in doubt, when instructions not to
provide relevant information, please contact the manufacturer or supplier.
If the machine is not operating properly, or makes strange noises, immediately
turn off the power, stop the machine and run it off.
event of failure, please contact the manufacturer or supplier.

1). standard operating procedures
Turn the power switch to turn on the machine, or machine power indicator light
it must be used in vacuum-packed bags, before use of packaging materials bags
Put products into bag, select the appropriate product bag, do not choose too large
relative to the product bag. Ensure hygienic conditions during operation. Packaging
materials, products, and the hand is better in dry conditions.
Place the bag into the vacuum chamber or plate on(if have) . The bag opening
must be put on a hot plate or silicone. If the product is much lower than the
heating plate or silicone, insert the pad provided by the machine(if have), so you
can make the operation easier and reduces cycle time.
For inflation system, put the bag opening in the gas fill nuzzle.
Many bag can be placed on a hot plate or silicone at the same time, just make sure
heating plate or silicone longer than the bag. Bags cannot be stacked with each
other. If the machine has more heating plates or silicone, these heating plates or
silicon strips can be used in same time.
Set the correct machine parameters. Refer to "Control Panel" section.
Pressure vacuum chamber lid, the machine will automatically complete all the set
procedures, including vacuum, inflatable (if have), sealing and cooling. When gas is
released, the vacuum chamber lid opens automatically.
After the cycle, removing packaged product from the machine.
You can press the emergency stop button to stop the machine when necessary.
After pressing the emergency stop button, the machine will stop all work and gas
will be released immediately, vacuum chamber lid opens automatically.
Note: If the machine power outage or other unexpected events occur during operation,
then the vacuum chamber lid cannot be automatically opened. The machine will
perform gas discharge function immediately after re-energization, the vacuum
chamber lid opens automatically.
Note: If the machine is located in high altitude, the atmospheric pressure will decrease,
the vacuum gauge indicated value will be reduced accordingly.
2).Control program cycle description
Mechanical version control panel procedure described
computer board control panel procedure described
Machine running, starting with vacuum function, the air
out of the vacuum chamber.
vacuum time relay "ON" indicator lights.
vacuum meter pointer began to move slowly to the left.
When the "UP" vacuum relay indicator lights, vacuum is

Inflation process
(if have)
Once the vacuum function is completed, the gas filled
function starts, to inflate the bag
inflation time relay "ON" indicator lights.
vacuum table pointer slowly moves to the right.
When inflating time relay "UP" indicator lights, inflatable
Once the vacuum function and inflation functions (if
have) are completed, the sealing function will start
running.
Sealing time relay "ON" indicator lights.
vacuum meter pointer remain intact.
When sealing time relay "UP" light, sealing is completed.
Sealing is finished, the cooling function will start running
cooling time relay "ON" indicator lights.
vacuum meter pointer remain intact.
When the cooling time of the relay "UP" lights, complete
Once cooling completed, deflation function starts, the
atmosphere into the vacuum chamber reaches
atmospheric pressure in line with the outside world, then
the vacuum chamber lid will open their own.
vacuum meter pointer to move sharply to the right.
vacuum meter pointer back to the right to reach the 0,
vacuum chamber lid open automatically.
all the time relay indication light off.
product has been packaged.
Work indicator light on
Machine running, starting with vacuum function, the air
out of the vacuum chamber.
(Vacuum function)front indicator lights.
Display: time reduce from setting time one second by
Vacuum meter pointer move to left slowly
Inflation process
(if have)
Once the vacuum function is completed, the gas filled
function starts, to inflate the bag(if have)
(Inflation function)front indicator lights.
Display: the time reduce from setting time (max.9.9
Vacuum meter pointer start move to right slowly
Both of vacuum and gas filled function (if have) are
finished, the sealing function will start running.
(Sealing)front indicator lights.
Display: the time reduce from setting time (max.6

Vacuum meter pointer keep stable
Sealing is finished, the cooling function will start running
(Cooling) front indicator lights.
Display: the time reduce from setting time (max.6
Vacuum meter pointer keep stable
Once cooling completed, deflation function starts, the
atmosphere into the vacuum chamber reaches
atmospheric pressure in line with the outside world, then
the vacuum chamber lid will open their own.
vacuum meter pointer quickly move to right
vacuum meter pointer back to the right to reach the 0,
vacuum chamber lid open automatically.
Display show “Ed” work process finished
product has been packaged.
Note: When the sealing process has just begun, vacuum gauge pointer may swing, this
is not a malfunction.
Be careful! Damage to the machine!
Unreasonable parameter setting may cause damage or shorten the life of the machine.
Unreasonable parameter setting may cause damage or shorten the life of the
Unreasonable parameter settings may not complete all the correct procedures or
If you have questions about the operations and functions of the machine have
questions, please contact the manufacturer or supplier.
Note: only the machine stops running, can set the parameters.
For the use of computer board machine, if you did not complete the parameter
settings but pressure vacuum chamber lid, the machine is not running.
Relay panel parameter settings:
Time parameter settings:
DZ series (not available inflatable function) panel has three relay time can be adjusted:
the vacuum time, sealing time and cooling time. Rotation time relay adjustment knob
to the appropriate scale location.
Sealing voltage setting:
Machines have low, medium and high sealing voltage options, for thinner or thicker
vacuum bags. When sealing voltage set to "0" position, the machine will not be heated

computer board panel program settings:
Function is selected, the
corresponding function lights (red).
It is vacuum time, inflation time (if
have), sealing time, cooling time.
Display the selected
parameter setting
functions.
Press once, the parameters of the
selected function program to increase
per unit of time.
Press and hold the button will
increase value at a rate of about 5
values per second.
Display the selected
parameter setting
functions.
Press the function selection button
one or more times, until all the
function lights go out, the machine
will save the parameters.
Each function parameter adjustment range:
Select temperature setting
Press one time the display right indicator
show high-medium-low temperature
When using the temperature selector
button to select a certain temperature, the
corresponding temperature indicator light
(red).
If the high, medium and low three lights are
off, it will not be sealed.
4).Optimal parameters
Vacuum time should be determined according to the number or size of the vacuum
chamber and the volume of the material. usually, the vacuum function can be set at
between 20 and 40 seconds. If the degree of vacuum is not lower than 0.06Mpa and
then began sealing, the sealing function may not be completed properly.
special packaging for the product may be appropriate to extend the vacuum time.
For example, a relatively high moisture content of the packaging, and other liquids.

inflatable function (if have) parameters to be set according to the actual situation.
If the inflatable too much, vacuum lid opens automatically, the program will
If Inflatable excessive vacuum reaches higher than 0.06Mpa and begin to seal, the
sealing function may not be completed properly.
sealing function parameters can be set between 1-3 seconds.
If the bags are exceptionally thick or very thin, the temperature can be adjusted to
select high-grade or low-grade.
Note: If the sealing time parameter is too long, the temperature of the heating
plate will be a sharp rise, which will greatly shorten the heating plate and silicone
life.
sealing function parameters have a great impact on the sealing quality, need to
slowly adjust from low to high.
cooling function parameters according to the thickness of the case of the bag
disposed between 1-3 seconds.
5). For packaging liquid products
Machine can be used for packaging liquid products, such as soups, sauces, etc.,
when the packaging of such products, pay attention to spillage.
Liquid will arrive boiling point when the temperature is higher or it reaches a low
pressure, the high temperature of the liquid product will soon reach boiling point
when packed and thus the degree of vacuum may be lower.
We recommend to cool the liquid products before packing to ensure the best
vacuum effect of the product.
6.the best packaging
use the correct style and good quality vacuum bag.
pocket to leave enough space at least 30mm.
flat vacuum bag placed on a hot plate or silicone.
If the product is lower than the heating plate or silicone lot, put correct number of
pads (if have)to the vacuum chamber.
Warning! Risk of electric shock!
You must be completely disconnected from the mains before machine
maintenance.
To prolong the life of the machine, prevent failure and achieve the best packaging
effect, the machine's daily maintenance is necessary. If the machine is frequently used
(more than 4 hours per day), it is recommended every six months to give a professional
maintenance. If not, once a year full maintenance (depending on the location, the
environment and on the product).
Machine must be completely disconnected power before Maintenance, the power
plug is removed from the wall-mounted socket.

If the machine is not operated properly or emit a lot of strange noises, turn off the
power immediately and contact the manufacturer or supplier.
Do not carry out a high-pressure cleaning. High pressure cleaning will severely
damage electronic devices and other parts.
Do not allow water to enter the vacuum pump exhaust nozzle or vent, otherwise
would cause irreparable damage to the vacuum pump.
Non-professionals cannot carry out a large-scale maintenance.
When moving or transporting, the machine must be in an upright state level.
Tilting machine may damage the vacuum pump.
Summer or daily work continuously for more than 10 hours, a vacuum pump
should be taken measures such as air-cooled or water-cooled.
If you do not follow the instruction manual to maintain machine, the manufacturer
assumes no responsibility once machine results in malfunction or damage.
1).standard maintenance of the Periodic Table
With a damp cloth to clean the
vacuum chamber, vacuum chamber
lid and chassis per day, it is possible to
remove the foreign matter adhered to
the heating plate. The cut material
using a high pressure cleaner.
Check the vacuum pump oil level and
oil, such as oil is low or bad, the oil
should be refueled or changed.
Check the heating plate is damaged,
once the sealing quality deterioration
or linoleum / electric flat yarn no
longer stick to the hot plate, please
replace the high temp. tape / electric
heating wire
Check the pump cover ring, ring once
damaged or stretched, please change.
Check the pump filter is saturated, if
saturated, replace the filter.
At least once every six months to
change the vacuum pump oil.
Replace every sealing balloons or
2). vacuum pump maintenance (hereinafter are XDZ-020 rotary vane vacuum pump, for
example)
pump routine maintenance to ensure proper operation and extend the service life
If the machine is frequently used, it is recommended at least once a year to pump

comprehensive inspection. If you have questions or suggestions, please contact
the manufacturer or supplier.
Fuel / oil change
Be careful! polluted environment!
Used oil should be handled in accordance with environmental regulations.
Pump run time, the surface temperature up to 70℃.
Do not touch the operated vacuum pump, if necessary, stop the machine running,
allowed to cool and wear heat-protective gloves.
New machine does not contain vacuum pump oil, if the machine is first used, must
Check the vacuum pump oil Color
Vacuum pump oil should be bright, clear, turbid or without bubble. If the oil has not
disappeared white substance after precipitation, it shows that oils contain foreign
material and it must be replaced.
Life of vacuum pump oil
Vacuum pump oil service life depends on the work environment, extracting clean, dry
gas, generally every 500 operating hours or every six months, the vacuum pump oil
should be replaced.
Check at least once a week the oil level and oil volume. Can be viewed via the oil
level glass, the oil level is too low need to refuel.
replacing vacuum pump oil at the same time, we recommend also to replace the
vacuum pump oil mist filter.
Before oil change, please let the pump run a few minutes, the pump and the oil will
reach the right temperature, so that the oil can better absorb moisture and impurities
and filtered. High temperature allows the pump’s moisture to be evaporated and
reduce the chances of rust arise.

Open the chassis cover.
Put the tank or tray in bottom of “B”
Take the oil drain plug with the proper size wrench.
After take out oil, put the drain plug back.
Used oil should be handled in accordance with environmental regulations.
Note: When you unscrew the oil drain plug, the oil flows out through the drain hole
(below must put a oil pan).
After the oil is done and, if possible, the vacuum pump is inclined slightly exhausted all
residual oil.
Fill oil:
Be careful! Damage to the machine!
The correct type of oil and oil volume is very important for the vacuum pump.
Using the wrong vacuum pump oil or adding too much oil will damage the pump.
New machine must fill oil.
when the oil level low or take out old oil need to fill the oil
Must use the correct size wrench to remove the filler plug.
Injected about the right amount of the right pump for oil, vacuum pump oil, refer
to specific "dedicated vacuum pump oil" section.
Ensure that the oil level in the oil level between 1/2 to 3/4 of the mirror.
Make sure the filler plug is installed in the ring and in good condition, be sure to
Check the oil level in the oil level between 1/2 to 3/4 of the mirror, if the oil level is

less than 1/2 of the oil level glass, please refueling.
If the oil level in the oil level between 1/2 to 3/4 of the mirror, install the machine
Check the oil level every week, if the oil level is less than 1/2 of the oil level glass,
please right amount of fuel.
Replace the filter
Be careful! polluted environment
Contaminated filters must be handled separately from other waste in accordance with
applicable regulations.
There is one or more filters of vacuum pump for absorbing and filtering oil mist, after a
period of time, the filter becomes wet (saturated), need to be replaced. Once the filter
is saturated, the machine will not reach maximum vacuum degree.
When changing vacuum pump oil suggest to replacement mist filter too
Oil mist filter normal maintenance cycle is 6-12 months.
Replacing the oil mist filter:
Open the casing back cover, find a vacuum pump.
Unscrew the four screws on the filter cover, remove the filter cover and the spring.
removed the old oil mist filter, replaced with a new oil mist filter.
Replace the spring and the filter cover.
The cover back onto the chassis.
Oil mist filter should be discarded in accordance with environmental regulations.
3). Vacuum pump oil
Operating temperature of the machine for the selection of the type of oil is very
important. The following table shows the relationship between temperature, oil
volume and oil types.
Here you can select several standard types of oil brands: Shell ICP (Vitrea), Great Wall
special vacuum pump oil.
▪Refer to pumps Instructions
Note: Using low temperatures vacuum pump oil at a high temperature, will increase

the wear of pump vanes and pump itself, and then affect pump life.
Note: If the machine is not used under normal ambient temperatures, please contact
the manufacturer or supplier.
4).Replace the high temp. tape, electric heating wire
Machine heating plate at a surface temperature of heating up to 200 ℃.
Even after cooling, the surface may still have a high temperature.
Sealing quality is good or bad to some extent depends on the heating plate and silicone
maintenance situation.
The main routine maintenance work: Use a damp cloth on a hot plate and silicone daily
cleaning every week and check the heating plate silicone, if the heating plate side is
uneven or poor sealing quality, please change the electric flat, cloth or silicone.
Heating plate structure
heating plate linoleum, electric heating wire average maintenance cycle is at least
once every 3 months. (Premise: the machine is routine use of a standard vacuum
packaging materials, packaging and standard products.)
Replace cloth or electric heating wire:
Pull heating plate fixing pins, remove the heating plate assembly.
folded down linoleum plate.
Remove the cloth of heating panel.
If you only need to replace the cloth, wipe the oil on the heating plate, then glue
the new linoleum to the heating plate.
Loosen the locking screw on the block of heating plate.
Pull out of the heated strip gasket.
Extraction electric heating wire.
Epoxy ring ends the same way removed.
Remove the old electric heating wire following PTFE strips.
Wipe grease on a hot plate with a clean cloth.
The new PTFE strips glued on a hot plate.
Cut a new piece of electric flat, longer than the length of the heating plate plus
The flat wire end through electric heating plate fixed block slot, plug back on the
heating strip gasket, and then tighten the locking screw.
Connect the other end of the flat wire from the electric heating plate fixed block is
located on the other side of the groove lira.
Using forceps tension electric flat, while the plug back on the heating strip gasket
and tighten the screws, tighten the screws to ensure that the former electric
heating wire
Tensioning and straightening
The excess copper flat wire electric block removed.
Cut a new piece of cloth, flat stick on a new electric heating wire. Ensure cloth

attached to a flat heating plate without wrinkles.
Replacing the cloth plate,
The heating plate back into the machine.
5).the replacement of silicone
Must be checked once every week for wear or damage silicone, silicone once
becomes uneven, to be replaced immediately silicone.
Average maintenance cycle for silicone at least once every six months.
Silicone is stuck in the seat, you can unscrew the four screws directly withdrawn
after the pressure of the support plate.
Release the pressure of the support plate screws and remove the pressure of the
The old silicone withdrawn from the silicone base.
Cut a new silicone, the same length as the old one, and ensure the consistent size
The new silicone loaded silicone base, and attach the batten support plate.
Silicone must be completely flat on the silicone seat. It is very important that the
silicone is smooth in place and there is not tension phenomenon.
Description: one side of silicone rubber is textured, but the other side is textured with
a fixed hole. Printing particles can be installed for printing labels. Select the desired
side of silicone to use.
6), Replace the seals
Seal ring is to seal the vacuum chamber during operation, this is very important for
vacuum degree. Due to different pressures, seals wear out and must be replaced
regularly.
Check the seals at least once a week to see if there is wear or damage.
The average maintenance cycle of the sealing ring at least once every six months.
Seal is stuck in the vacuum chamber lid tank and it can be put out directly. The new
seal length can be according to the old seal strip, too long or too short can cause
the lid cannot be closed or leak.
Put the new seal ring into the vacuum chamber lid groove.
Ring should be placed flat, no tension phenomenon, the end must be cut straight,
and compact to prevent leakage.
8.Failure Analysis and solutions
1).Machine failure and solutions
Machine not work,
control panel not
show information
Mainly circuit fuse broken
Replacement right size fuse
Power switch touch point loose
Check-fixed-repair-or
replacement
Control panel start,
machine not work
Vacuum chamber inside sensitive
switch position not right or broken
Adjust or replace new
sensitive switch
Finished parameter setting

Vacuum cover
can’t open
automatically
Pneumatic spring or pull spring
problem
Check-fixed-or replacement
Can’t reach limited
vacuum degree,
machine vacuum
speed slow
Pump running wrong direction
Correct the direction(3
phase voltage)
Vacuum time setting short
Vacuum pump oil not enough or
oil not clean
Check oil level, fill oil or
replace oil(notice oil type
and oil volume)
Tube connected place loose
Oil mist filter saturation
Can’t sealing or
sealing not good
Bag not put in the heating plate
well
Put the bag in right place
Sealing time too long or too short
Reduce or extend sealing
time
Heating time choose not right
Choose suitable heating
time
Silicon strip broken or dirty
Can’t fill air or fill
air not good
(if have)
Filling air time too short or too
long
Reduce or extend filling air
time
Air tank empty or limited to
empty
Filling air parameter setting wrong
Check pressure meter if in
1MPa(1-ATO)
Warning! Mixed air any time
can’t more than 1MPa
Vacuum chamber
vacuum degree is
normal, but still
have air in bag
Heating plate reset position not
good.
Heating plate and silicone strip
distance too big or too small
Adjust reset, flexible
Adjust distance.
2.)Vacuum pump problem and solutions
Pump start electric
current or work
electric current
overloading
Pump oil too full or oil type not
right
Checking oil type and oil
level
At low temperatures, the viscosity
of oil is too high
Replacement suitable
vacuum pump oil

Clean or replace the filter
Pump temperature
high when running
check and adjust the oil level
clean bad fins, improved
ventilation environment
Abnormal noise
pump operation
Transmission parts badly worn or
loose
identify defective parts
repaired in time
running in the wrong direction
Correct direction
(three-phase power)
Smoke or exhaust
vents droplets
Pump too much oil
Exhaust filter install not in
position or broken
Install again or replacement
3).the solenoid valve Troubles
Solenoid valve
cannot open and
close or open and
close inflexibly
Rectifier diode breakdown
Spring Rusty stuck or broken
4).Sealing problem and solutions
Choose suitable sealing
temp.
Sealing time too long or too short
Short or extend sealing time
Vacuum degree not reach and
start sealing
Checking vacuum degree
can’t more than 0.06Mpa
Heating transformer damaged
Sealing solenoid valve failure
Silicone strip broken or dirty
High temp. Tape broken or dirty
Temperature choose not right

9. Equipment storage
1, short time storage
Turn off the power switch, unplug the power, and put power line away.
If possible, put a plastic bag to prevent dust.
Store in a dry, dust-free, and shock-proof room.
2. Long time storage
When machine is out of the factory, the interior has been done anti-corrosion
treatment, so no necessary to use protective oil. If bad storage conditions (such as
corrosive environments, high temperature or frequent temperature changes),
protective oil can be used. If you have any questions, please contact the manufacturer
or supplier.
Turn off the power switch, unplug the power and put power line away.
Close the lid of the vacuum chamber.
Put a plastic bag to prevent dust.
If possible, keep the original packaging.
If you need transportation, vacuum pump oil must be drained.
Store in a dry, dust-free and shock-proof room.
3. Start machine after storage
According to "Installation" and "start" section operate.