
ARTP-IC UNIT
TYPICAL ARTP-IC INSTALLATION
COUNTERTOP CUTOUT REQUIREMENTS
16
15
1
"
24"
7
22
"
8
5
19
"
22
8
1
"
16
CAVITY WIDTH
1
1
"
8
INSULATION
3
"
4
1
22
"
4
16
STANDARD Ø 1" NPS
DRAIN FITTING
With CAP
18"
REMOVABLE
LID (LIFT UP)
2
5
"
16
3
"
8
SPECIFICATIONS:
● 1" INSULATION ON ALL SURFACES
● VOLUME 2.7 CU.FT. (20.4 GALLONS)
● Ø 1" NPS STANDARD HOUSEHOLD DRAIN.
THE INFORMATION CONTAINED IN THIS DRAWING IS THE
SOLE PROPERTY OF SUPERIOR EQUIPMENT SOLUTIONS
INC. ANY REPRODUCTION IN PART OR AS A WHOLE
TM
WITHOUT WRITTEN PERMISSION FROM SUPERIOR
Artisan
SUPERIOR EQUIPMENT SOLUTIONS
1085 BIXBY DRIVE
CITY OF INDUSTRY, CA. 91745
CREATED: Friday, February 14, 2020 1:32:10 PM
EQUIPMENT SOLUTIONS, INC. IS PROHIBITED.
DRAWN BY:
LAST SAVED:
ADRIAN CRISCI
3/4/2020 1:35:30 PM
PROJECT TITLE:
ARTP-IC
DRAWING TITLE:
ARTP-IC CLOSED
17
52°
5
"
8
5
"
8
17
17"
16
3
"
8
1
14
"
8
9
"
16
DRAWING NO.:
ARTP-IC SPEC SHEET
SHEET 1 OF 1