CAUTION: SOME PARTS HAVE SHARP EDGES. CARECAUTION: SOME PARTS HAVE SHARP EDGES. CARE
CAUTION: SOME PARTS HAVE SHARP EDGES. CARE
CAUTION: SOME PARTS HAVE SHARP EDGES. CARECAUTION: SOME PARTS HAVE SHARP EDGES. CARE
MUST BE TAKEN WHEN HANDLING THE VARIOUS PIECESMUST BE TAKEN WHEN HANDLING THE VARIOUS PIECES
MUST BE TAKEN WHEN HANDLING THE VARIOUS PIECES
MUST BE TAKEN WHEN HANDLING THE VARIOUS PIECESMUST BE TAKEN WHEN HANDLING THE VARIOUS PIECES
TO AVOID A MISHAP. FOR SAFETY SAKE, PLEASE READTO AVOID A MISHAP. FOR SAFETY SAKE, PLEASE READ
TO AVOID A MISHAP. FOR SAFETY SAKE, PLEASE READ
704880801
BUILDING DIMENSIONSBUILDING DIMENSIONS
BUILDING DIMENSIONS
BUILDING DIMENSIONSBUILDING DIMENSIONS
*Approx. Foundation Storage Area (Roof Edge to Roof Edge) (Wall to Wall) *Approx. Foundation Storage Area (Roof Edge to Roof Edge) (Wall to Wall)
*Approx. Foundation Storage Area (Roof Edge to Roof Edge) (Wall to Wall)
*Approx. Foundation Storage Area (Roof Edge to Roof Edge) (Wall to Wall) *Approx. Foundation Storage Area (Roof Edge to Roof Edge) (Wall to Wall)
Size Size Sq. Ft. Cu. Ft. Width Depth Height Width Depth Height Size Size Sq. Ft. Cu. Ft. Width Depth Height Width Depth Height
Size Size Sq. Ft. Cu. Ft. Width Depth Height Width Depth Height
Size Size Sq. Ft. Cu. Ft. Width Depth Height Width Depth Height Size Size Sq. Ft. Cu. Ft. Width Depth Height Width Depth Height
12' x 10' 141 1/8" x 111 3/4" 110 801 146 1/8" 117" 103 1/4"141 1/8" 111 3/4" 102"
12' x 17' 141 1/8" x 198"1941419 146 1/8" 203 1/4" 103 1/4"141 1/8" 198" 102"
12' x 24' 141 1/8" x 284 1/4" 278 2037 146 1/8" 289 1/2" 103 1/4"141 1/8" 284 1/4" 102"
12' x 31' 141 1/8" x 370 1/2" 362 2655 146 1/8" 375 3/4" 103 1/4"141 1/8" 370 1/2" 102"
3,7m x 3,1m 3,58m x 2,84m 10,2m 22,7m 3,71m 2,97m 2,62m 3,58m 2,84m 2,59m
3,7m x 5,2m 3,58m x 5,03m 18,0m 40,2m 3,71m 5,16m 2,62m 3,58m 5,03m 2,59m
3,7m x 7,3m 3,58m x 7,22m 25,8m 57,7m 3,71m 7,35m 2,62m 3,58m 7,22m 2,59m
3,7m x 9,5m 3,58m x 9,41m 33,6m 75,2m 3,71m 9,54m 2,62m 3,58m 9,41m 2,59m
TO AVOID A MISHAP. FOR SAFETY SAKE, PLEASE READTO AVOID A MISHAP. FOR SAFETY SAKE, PLEASE READ
SAFETY INFORMATION PROVIDED IN THIS MANUALSAFETY INFORMATION PROVIDED IN THIS MANUAL
SAFETY INFORMATION PROVIDED IN THIS MANUAL
SAFETY INFORMATION PROVIDED IN THIS MANUALSAFETY INFORMATION PROVIDED IN THIS MANUAL
BEFORE BEGINNING CONSTRUCTION. WEAR GLOVESBEFORE BEGINNING CONSTRUCTION. WEAR GLOVES
BEFORE BEGINNING CONSTRUCTION. WEAR GLOVES
BEFORE BEGINNING CONSTRUCTION. WEAR GLOVESBEFORE BEGINNING CONSTRUCTION. WEAR GLOVES
WHEN HANDLING METAL PARTS.WHEN HANDLING METAL PARTS.
WHEN HANDLING METAL PARTS.
WHEN HANDLING METAL PARTS.WHEN HANDLING METAL PARTS.
Page 2
BEFORE BEFORE
BEFORE
BEFORE BEFORE
A2
Owner's ManualOwner's Manual
Owner's Manual
Owner's ManualOwner's Manual
Before beginning construction, check local building codes regarding footings, location
and other requirements. Study and understand this owner's manual.
Important information and helpful tips will make your construction easier and more
enjoyable.
Assembly Instructions:Assembly Instructions:
Assembly Instructions: Instructions are supplied in this manual and contain all
Assembly Instructions:Assembly Instructions:
appropriate information for your building model. Review all instructions before you begin,
and during assembly, follow the step sequence carefully for correct results.
FF
oundaounda
F
ounda
FF
oundaounda
tion and tion and
tion and
tion and tion and
AncAnc
Anc
AncAnc
horhor
ing:ing:
hor
ing: Your storage building must be anchored to pre vent wind
horhor
ing:ing:
YY
OU BEGINOU BEGIN
Y
OU BEGIN
YY
OU BEGINOU BEGIN
........
....
........
damage. A foundation is also necessary as a base in order to construct a square and level
building. Anchoring and foundation materials are not included with your building. We
recommend the combined use of an
AncAnc
horing Kithoring Kit
Anc
horing Kit as an effective method of secur ing your building to the ground (Available
AncAnc
horing Kithoring Kit
by mail order or at your local dealer) or you may construct the foundation and anchoring
system of your choice. Your assembly instructions provide infor mation on a few methods
commonly used to secure and level a storage building.
PP
arar
ts and Pts and P
P
ar
ts and P
PP
arar
ts and Pts and P
building.
•All part numbers can be found on the parts. All of these numbers (before the -) must agree with the
numbers on the parts list. The parts list is located on page 12.
•If you find that a part is missing, include the model number of your building and contact:
Arrow Group Industries, Inc. Customer Service DepartmentArrow Group Industries, Inc. Customer Service Department
Arrow Group Industries, Inc. Customer Service Department
Arrow Group Industries, Inc. Customer Service DepartmentArrow Group Industries, Inc. Customer Service Department
Route 50 East Breese, Illinois 62230Route 50 East Breese, Illinois 62230
Route 50 East Breese, Illinois 62230
Route 50 East Breese, Illinois 62230Route 50 East Breese, Illinois 62230
arar
ts List:ts List:
ar
ts List: Check to be sure that y ou have all the necessary parts for your
arar
ts List:ts List:
Arrow Floor Foundation Kit Arrow Floor Foundation Kit
Arrow Floor Foundation Kit and an
Arrow Floor Foundation Kit Arrow Floor Foundation Kit
Arrow Arrow
Arrow
Arrow Arrow
1-800-851-10851-800-851-1085
1-800-851-1085
1-800-851-10851-800-851-1085
•Separate contents of the carton by the part number while reviewing parts list. The first few steps
show how to join related parts to make larger sub assemblies which will be used later.
•Familiarize yourself with the hardware and fasteners for easier use during construction. These are
packaged within the carton. Note that extra fasteners have been supplied for your convenience.
2
Page 3
PLAN PLAN
PLAN
PLAN PLAN
A3
WW
aa
tctc
W
WW
Do not attempt to assemble your building on a windy day. Be careful on wet or muddy
ground.
TT
T
TT
your building. One person can position parts or panels while the other is able to handle
the fasteners and the tools.
TT
T
TT
construction of your building. Decide which method of anchoring and the type of
foundation you wish to use in order to form a complete list of the mater ials you will need.
h the h the
a
tc
h the
aa
tctc
h the h the
eamweamw
eamw
eamweamw
ools and Maools and Ma
ools and Ma
ools and Maools and Ma
oror
or
oror
WW
eaea
ther:ther:
ea
ther:
eaea
ther:ther:
Whenever possible, two or more people should work together to assemble
terter
ter
terter
k:k:
k:
k:k:
W
WW
Be sure the day you select to install y our building is dry and calm.
ials:ials:
ials:
ials:ials:
These are some basic tools and materials you will need for the
AHEADAHEAD
AHEAD
AHEADAHEAD
........
....
........
Required
• Eye Goggles
• No. 2 Phillips Screwdriver
(With Hardened Magnetic Tip)
Note: A power screwdriver or variable speed drill with Phillips-tip attachment can speed assembly by
as much as 40%.
Selecting and PrSelecting and Pr
Selecting and Pr
Selecting and PrSelecting and Pr
a location for your building. The best location is a level area with good drainage.
•Allow enough working space for ease of moving parts into position during assembly. Be sure there
will be enough space at entrance for doors to open fully and enough space around the building to
be able to fasten the panel screws from the outside.
•Before you begin the first steps in assembling your parts, a foundation should be constructed and
an anchoring system should be ready to use.
• Work Gloves
• Step Ladder
• Utility Knife / Scissors
• Pliers
• Carpenter's Level
• Tape Measure
ee
parpar
e
par
ee
parpar
Required
ing ing
ing
ing ing
YY
our Site:our Site:
Y
our Site:
YY
our Site:our Site:
Optional Time-Savers
• Wrench / Nut Driver
• Electric / Cordless Drill
• Square
• String (for squaring frame)
Before assembly, you will want to decide on
Foundation Preparation
• Hammer and Nails
• Spade or Shovel
• Hand Saw / Power Saw
• Lumber and/or Concrete
3
Page 4
SAFETY FIRSTSAFETY FIRST
SAFETY FIRST
SAFETY FIRSTSAFETY FIRST
A4
Safety precautions are important to follow throughout the construction of your building.Safety precautions are important to follow throughout the construction of your building.
Safety precautions are important to follow throughout the construction of your building.
Safety precautions are important to follow throughout the construction of your building.Safety precautions are important to follow throughout the construction of your building.
........
....
........
•Care must be taken when handling various
pieces of your building since some contain
sharp edges. Please wear work gloves, eye
protection and long sleeves when assembling
or performing any maintenance on your building.
safety edge
sharp edge
sharp edge
safety edge
•Keep children and pets away from worksite to
avoid distractions and any accidents which
may occur.
•Practice caution with the tools being used in the
assembly of this building. Be familiar with the
operation of all power tools.
•Do not attempt to assemble the building if parts
are missing because any building left partially
assembled may be seriously damaged by light
winds. Call 1-800-851-1085
•Never concentrate your total weight on the
roof of the building. When using a step ladder
make sure that it is fully open and on even
ground before climbing on it.
4
•Do not attempt to assemble the building on a
windy day, because the large panels acting as a
"sail", can be whipped about by the wind making
construction difficult and unsafe.
Page 5
CARE & MAINTENCARE & MAINTEN
CARE & MAINTEN
CARE & MAINTENCARE & MAINTEN
A5 Web
FF
inish:inish:
F
inish: For long lasting finish, periodically clean and wax the exterior surface. Touch-
FF
inish:inish:
up scratches as soon as you notice them on your unit. Immediately clean the area with
a wire brush; wash it and apply touch-up paint per manufacturer's recommendation.
ANCE....ANCE....
ANCE....
ANCE....ANCE....
Roof:Roof:
Roof:
Roof:Roof:
amounts of snow on roof can damage building making it unsafe to enter. In snow country,
Roof Strengthening Kits are available for most Arrow Buildings for added protection
against heavy snow accumulation.
DoorDoor
Door
DoorDoor
sliding easily. Lubricate door track annually with furniture polish or silicone spray. Keep
doors closed and locked to prevent wind damage.
FF
astenerastener
F
astener
FF
astenerastener
the metal from being scratched by scre ws. Regularly check your b uilding f or loose scre ws,
bolts, nuts, etc. and retighten them as necessary.
Moisture: Moisture:
Moisture: A plastic sheet (vapor barrier) placed under the entire floor area with good
Moisture: Moisture:
ventilation will reduce condensation.
Other Other
Other
Other Other
Keep roof clear of leaves and snow with long handled, soft-bristled broom. Heavy
s:s:
s:
Always keep the door trac ks clear of dirt and other debris that prevent them from
s:s:
s:s:
s:
Use all washers supplied to protect against weather infiltration and to protect
s:s:
TT
ips....ips....
T
ips....
TT
ips....ips....
• Wash off inked part numbers on coated panels with soap and water.
• Silicone caulking may be used for watertight seals throughout the building.
Do not store swimming pool chemicals in your building. Combustibles andDo not store swimming pool chemicals in your building. Combustibles and
Do not store swimming pool chemicals in your building. Combustibles and
Do not store swimming pool chemicals in your building. Combustibles andDo not store swimming pool chemicals in your building. Combustibles and
corrosives must be stored in air tight approved containers.corrosives must be stored in air tight approved containers.
corrosives must be stored in air tight approved containers.
corrosives must be stored in air tight approved containers.corrosives must be stored in air tight approved containers.
Keep this Owner's Manual and Assembly Instructions for future reference.Keep this Owner's Manual and Assembly Instructions for future reference.
Keep this Owner's Manual and Assembly Instructions for future reference.
Keep this Owner's Manual and Assembly Instructions for future reference.Keep this Owner's Manual and Assembly Instructions for future reference.
5
Page 6
AA
CCESSORIESCCESSORIES
A
CCESSORIES
AA
CCESSORIESCCESSORIES
A6 WEB
RR
OOF STRENGTHENING (heaOOF STRENGTHENING (hea
R
OOF STRENGTHENING (hea
RR
OOF STRENGTHENING (heaOOF STRENGTHENING (hea
designed for added protection against heavy snow accumulation. Increases the strength of your roof by 50%.
ANCHOR KITANCHOR KIT
ANCHOR KIT
ANCHOR KITANCHOR KIT
Model No. AK4Model No. AK4
Model No. AK4
Model No. AK4Model No. AK4
Anchor Kit contains heavy-duty steel
augers, 60' (18m) of steel cable and 4 cable
clamps. No digging or concrete
pouring, just insert cable under roof,
over roof beams, into augers and twist
augers into the ground. For buildings
larger than 10'x9', use 2 kits.
vy snovy sno
vy sno
vy snovy sno
w load) KITSw load) KITS
w load) KITS Extra roof beams and gable braces
w load) KITSw load) KITS
ANCHOR KITANCHOR KIT
ANCHOR KIT
ANCHOR KITANCHOR KIT
Model No. AK100Model No. AK100
Model No. AK100
Model No. AK100Model No. AK100
New concrete anchor system permits
anchoring any size Arrow building
directly to a concrete slab. Each kit
contains heavy-duty, hot-dipped
galvanized steel corner gussets and
perimeter clips which fit over the floor
frame and lag bolt into a concrete slab.
Full assembly instructions and a 1/4"
masonary drill bit are included.
........
....
........
FLOOR FOUNDFLOOR FOUND
FLOOR FOUND
FLOOR FOUNDFLOOR FOUND
MODELS FB47410, FB5465, FB106-A
FB109-A, FB1010 AND FB1014-A
A simple new floor frame system made of heavy-duty, hot-dipped
galvanized steel. Use as foundation for plywood, sand or stone.
TT
OOL HANGING RAOOL HANGING RA
T
OOL HANGING RA
TT
OOL HANGING RAOOL HANGING RA
Model No. TH100Model No. TH100
Model No. TH100
Model No. TH100Model No. TH100
The perfect tool organizer. Twin
25 1/2" (65cm) steel channels
plus five heavy-duty snap-in
hangers and a small tool holder for
screwdrivers, pliers, etc. Holders
slide along channel for fully
adjustable spacing. Great for
garage, basement, or the back
of any door. Fits all Arrow
storage buildings.
6
AA
TION KITSTION KITS
A
TION KITS
AA
TION KITSTION KITS
CKCK
CK
CKCK
AA
TTIC KIT / TTIC KIT /
A
TTIC KIT /
AA
TTIC KIT / TTIC KIT /
Heavy-duty galvanized steel bars that
fit all 10' wide Arrow buildings. They
install quickly and easily to help
organize space and create more
useable space as an attic or
workbench. Will hold up to 250 lbs.
(113kg) evenly distributed.
Model No.Model No.
Model No.
Model No.Model No.
Must be drilled for use as workbench in Estator.
+ Even weight distribution.
SHELF UNITSSHELF UNITS
SHELF UNITS
SHELF UNITSSHELF UNITS
Heavy-duty, galvanized steel shelf units help organize storage
space. They easily mount on the wall or sit on the floor. Fits all
Arrow buildings.*
Model No. SS404
• Makes 8" to 12" (20-30cm)
wide shelves in any length.
• Brackets, braces,
hardware included.
Lumber is not included.
* Some drilling required to fit buildings without mid-wall bracing.
WW
ORKBENCH KITORKBENCH KIT
W
ORKBENCH KIT
WW
ORKBENCH KITORKBENCH KIT
FitsFits
Fits
FitsFits
10' Long, 250 lb. (113kg) load+
Fits all Arrow 10' wide buildings.
Model No. SS900-A
• Grey color
• 3 shelves
• Holds up to 85 lbs. (38kg)
(even weight distribution)
Shipping WeightShipping Weight
Shipping Weight
Shipping WeightShipping Weight
16 lbs. (7kg)AT101
Page 7
THIS
PAGE
WAS
LEFT
BLANK
INTENTIONALLY
7
Page 8
THIS
PAGE
WAS
LEFT
BLANK
INTENTIONALLY
8
Page 9
FF
oundaounda
F
ounda
FF
oundaounda
BW9
TT
he Fhe F
T
he F
TT
he Fhe F
Concrete SlabConcrete Slab
Concrete Slab
Concrete SlabConcrete Slab
The slab should be at least 3" to 4" (8-10cm) thick. It must be level and flat to provide good support for the frame.The slab should be at least 3" to 4" (8-10cm) thick. It must be level and flat to provide good support for the frame.
The slab should be at least 3" to 4" (8-10cm) thick. It must be level and flat to provide good support for the frame.
The slab should be at least 3" to 4" (8-10cm) thick. It must be level and flat to provide good support for the frame.The slab should be at least 3" to 4" (8-10cm) thick. It must be level and flat to provide good support for the frame.
The following are the recommended materials for your foundation.The following are the recommended materials for your foundation.
The following are the recommended materials for your foundation.
The following are the recommended materials for your foundation.The following are the recommended materials for your foundation.
● 2 x 4's (5cm x 10cm) (will be removed once the concrete cures)
● Concrete ● Sheet of 6 mil plastic
● We recommend for a proper strength concrete to use a mix of: 1 part cement ● 3 parts pea sized gravel ● 2 1/2 parts clean sand
Prepare the Site/Construct a FoundationPrepare the Site/Construct a Foundation
Prepare the Site/Construct a Foundation
Prepare the Site/Construct a FoundationPrepare the Site/Construct a Foundation
1. Dig a square, 6" (15cm) deep into the ground (remove grass).
2. Fill up to 4" (10cm) in the square with gravel and tamp firm.
3. Cover gravel with a sheet of 6 mil plastic.
4. Construct a wood frame using four planks of 2x4 (5cm x 10cm)
lumber.
5. Pour in concrete to fill in the hole and the frame giving a
total of 4" (8-10cm) thick concrete. Be sure surface is level.
oundaounda
ounda
oundaounda
tion Ftion F
tion F
tion Ftion F
or or
or
or or
YY
our Buildingour Building
Y
our Building
YY
our Buildingour Building
tiontion
tion
tiontion
Allow 3 - 5 hours for construction and a week for concrete curing time.Allow 3 - 5 hours for construction and a week for concrete curing time.
Allow 3 - 5 hours for construction and a week for concrete curing time.
Allow 3 - 5 hours for construction and a week for concrete curing time.Allow 3 - 5 hours for construction and a week for concrete curing time.
Note: Before beginning construction, check local building codesNote: Before beginning construction, check local building codes
Note: Before beginning construction, check local building codes
Note: Before beginning construction, check local building codesNote: Before beginning construction, check local building codes
regarding footings, location and other requirements.regarding footings, location and other requirements.
regarding footings, location and other requirements.
regarding footings, location and other requirements.regarding footings, location and other requirements.
Welded Wire
Fabric
Reinforcing
Rods
Optional Footer Type of FoundationOptional Footer Type of Foundation
Optional Footer Type of Foundation
Optional Footer Type of FoundationOptional Footer Type of Foundation
141 1/8"141 1/8"
141 1/8"
FRONT (ROLL-UP DOOR)FRONT (ROLL-UP DOOR)
FRONT (ROLL-UP DOOR)
FRONT (ROLL-UP DOOR)FRONT (ROLL-UP DOOR)
141 1/8"141 1/8"
3,58m3,58m
3,58m
3,58m3,58m
10' - 111 3/4"10' - 111 3/4"
10' - 111 3/4"
10' - 111 3/4"10' - 111 3/4"
17' - 198"17' - 198"
17' - 198"
17' - 198"17' - 198"
24' - 284 1/4"24' - 284 1/4"
24' - 284 1/4"
24' - 284 1/4"24' - 284 1/4"
31' - 370 1/2"31' - 370 1/2"
31' - 370 1/2"
31' - 370 1/2"31' - 370 1/2"
2,84m2,84m
2,84m
2,84m2,84m
5,03m5,03m
5,03m
5,03m5,03m
7,22m7,22m
7,22m
7,22m7,22m
9,41m9,41m
9,41m
9,41m9,41m
Reinforcing
Rods
Note: Note:
Note: Finished Slab dimensions, with lumber removed.
Note: Note:
9
Page 10
AnchoringAnchoring
Anchoring
AnchoringAnchoring
A10
AncAnc
Anc
AncAnc
It is important that the entire floor frame be anchored after the building is erected.It is important that the entire floor frame be anchored after the building is erected.
It is important that the entire floor frame be anchored after the building is erected.
It is important that the entire floor frame be anchored after the building is erected.It is important that the entire floor frame be anchored after the building is erected.
Below are recommended ways of anchoring.
Arrow Anchoring Kit:Arrow Anchoring Kit:
Arrow Anchoring Kit:
Arrow Anchoring Kit:Arrow Anchoring Kit:
Recommended for use with
Contains: Contains:
Contains: 4 Anchors with Cable, Clamps and
Contains: Contains:
installation instruction.
horhor
hor
horhor
ing Doing Do
ing Do
ing Doing Do
wn wn
TT
wn
T
wn wn
TT
(Model No. AK4 or 60298)
any any
any suggested
any any
he Buildinghe Building
he Building
he Buildinghe Building
base.base.
base.
base.base.
Anchoring into Wood/Post:Anchoring into Wood/Post:
Anchoring into Wood/Post:
Anchoring into Wood/Post:Anchoring into Wood/Post:
Use 1/4" Wood Screws. There are 1/4" (0,63cm) dia.
holes provided in the frames for proper anchoring.
#10-32x7/16" bolts and square nuts,
on all connections loosely.
2 2
2 Attach
2 2
upper chordupper chord
upper chord.
upper chordupper chord
3 3
3 Attach 2
3 3
the upper and lower chords at the
opposite end of truss.
4 4
4 Attach 2
4 4
and lower chords.
5 5
5 Attach 2
5 5
upper and lower chords.
6 6
6 Attach 2
6 6
upper and lower chords at middle of
truss.
7 7
7 Attach 2
7 7
upper and lower chords. Mount with
short leg of brace.
truss lower chordtruss lower chord
truss lower chord to
truss lower chordtruss lower chord
center gable braces center gable braces
center gable braces to
center gable braces center gable braces
truss diagonalstruss diagonals
truss diagonals to upper
truss diagonalstruss diagonals
mid gable bracesmid gable braces
mid gable braces to
mid gable bracesmid gable braces
center gable bracescenter gable braces
center gable braces to
center gable bracescenter gable braces
outer gable bracesouter gable braces
outer gable braces to
outer gable bracesouter gable braces
rr
● Parts Needed For ●
ll
y 12x17,y 12x17,
l
y 12x17,
ll
y 12x17,y 12x17,
ONLONL
ONL
ONLONL
6382
12x24 & 12x31 12x24 & 12x31
12x24 & 12x31
12x24 & 12x31 12x24 & 12x31
YY
Y
YY
The day before construction of the building, complete the subassemblies so they will be ready. EXAMPLE: Truss, floor
frames, roof beams, gables, side and overhead doors. Set the
assemblies aside, so they will not get damaged.
The remainder of the building assembly requires more than
1 work session and more than 1 person. Do not continue
beyond this point if you do not have enough time to complete
the wall assembly and can tie down the assembly overnight.
Complete the roof and doors on the following day.
half and slip over the bottom edges of
gable braces. This trim is a must to
protect against injury from the sharp
edge.
Make 1 assembly for the 12x17
Make 2 assemblies for the 12x24
Make 3 assemblies for the 12x31
NOTENOTE
NOTE
NOTENOTE
edge trim edge trim
edge trim in
edge trim edge trim
IMPORTANT:IMPORTANT:
IMPORTANT:
IMPORTANT:IMPORTANT:
Square Up
Half Truss
Mounting Flange of Brackets
Must Face Towards Center
Of Truss Assembly
7738
Edge Trim
6381
7739
6380
6382
Short
Mounting
Leg
7856
#10-32 Square Nut
7855
#10-32x7/16" Bolt
15
Page 16
Step 2Step 2
Step 2
Step 2Step 2
BW16
The gables go on top of the front and
rear walls to support the roof beams.
The gables are packed nested together and might be mistaken as 1
piece. Carefully separate them before continuing.
8532 Right Rear Frame (1) 8532 Right Rear Frame (1)
●
8532 Right Rear Frame (1)
●●
8532 Right Rear Frame (1) 8532 Right Rear Frame (1)
●●
8531 Left Rear Frame (1) 8531 Left Rear Frame (1)
●
8531 Left Rear Frame (1)
●●
8531 Left Rear Frame (1) 8531 Left Rear Frame (1)
●●
7837 Side Frame (2) 7837 Side Frame (2)
●
7837 Side Frame (2)
●●
7837 Side Frame (2) 7837 Side Frame (2)
●●
7834 Right Front Frame (1) 7834 Right Front Frame (1)
●
7834 Right Front Frame (1)
●●
7834 Right Front Frame (1) 7834 Right Front Frame (1)
●●
7835 Left Front Frame (1) 7835 Left Front Frame (1)
●
7835 Left Front Frame (1)
●●
7835 Left Front Frame (1) 7835 Left Front Frame (1)
●●
7517 Lower Door Track (1) 7517 Lower Door Track (1)
●
7517 Lower Door Track (1)
●●
7517 Lower Door Track (1) 7517 Lower Door Track (1)
●●
7560 Ramp (1) 7560 Ramp (1)
●
7560 Ramp (1)
●●
7560 Ramp (1) 7560 Ramp (1)
The rear floor frame is made up of 2
pieces. The holes in these pieces
will align when the pieces are positioned with correct amount of overlap. The illustration below shows the
proper overall length for the rear.
1 1
1 Overlap
1 1
align holes, and fasten using 8 bolts
and nuts. Make 3 assemblies. Use 1
assembly for this step.
right right
right and
right right
7517
left rear framesleft rear frames
left rear frames,
left rear framesleft rear frames
7560
Side Frame
2 2
2 Position
2 2
and fasten at each corner using 2
bolts through the bottom and nuts
on top.
3 3
3 Measure the floor frame diago-
3 3
nally. When the diagonal measurements are equal, the floor frame
is square.
floor frames floor frames
floor frames as shown
floor frames floor frames
STEP
11
1
11
8531
4 4
4 Select location of side door on
4 4
either side, toward the rear of building. Install
rampramp
ramp, notch toward outside, using
rampramp
1/4" bolts and nuts, as shown. See
Step 12 for Rear Door Installation.
Do not fasten the floor frames to
your foundation at this time. You
will anchor the building after it is
erected.
The floor frame The floor frame
The floor frame
The floor frame The floor frame
and level and level
and level
and level and level
Rear Frame 140 7/8" 3,6m
lower door tracklower door track
lower door track and
lower door tracklower door track
NOTENOTE
NOTE
NOTENOTE
must be squaremust be square
must be square
must be squaremust be square
or holes will not align.or holes will not align.
or holes will not align.
or holes will not align.or holes will not align.
Notch toward outside
of building
STEP
#10-32x1/4" Bolt
7835
44
4
44
7837
FRONTFRONT
FRONT
FRONTFRONT
7517
Slot
7560
SIDE
STEP
REAR
33
3
33
#10-32 Square Nut
8531
8532
Level
7837
8532
#10-32x7/16" Bolt
STEP
22
2
22
7834
Position with small holes
toward outside of building
17
Page 18
Step 5Step 5
Step 5
Step 5Step 5
BW18
● Parts Needed For ●
Floor FFloor F
Floor F
Floor FFloor F
12x17, 12x24, 12x3112x17, 12x24, 12x31
12x17, 12x24, 12x31
12x17, 12x24, 12x3112x17, 12x24, 12x31
rr
ame ame
r
ame
rr
ame ame
AssembAssemb
Assemb
AssembAssemb
●●
8532 Right Rear Frame (1) 8532 Right Rear Frame (1)
●
8532 Right Rear Frame (1)
●●
8532 Right Rear Frame (1) 8532 Right Rear Frame (1)
●●
8531 Left Rear Frame (1) 8531 Left Rear Frame (1)
●
8531 Left Rear Frame (1)
●●
8531 Left Rear Frame (1) 8531 Left Rear Frame (1)
●●
7914 Side Frame (see below) 7914 Side Frame (see below)
●
7914 Side Frame (see below)
●●
ll
yy
l
y
ll
yy
7914 Side Frame (see below) 7914 Side Frame (see below)
●●
7857 Truss Support (see below) 7857 Truss Support (see below)
●
7857 Truss Support (see below)
●●
7857 Truss Support (see below) 7857 Truss Support (see below)
●●
7837 Side Frame (2) 7837 Side Frame (2)
●
7837 Side Frame (2)
●●
7837 Side Frame (2) 7837 Side Frame (2)
●●
7834 Right Front Frame (1) 7834 Right Front Frame (1)
●
7834 Right Front Frame (1)
●●
7834 Right Front Frame (1) 7834 Right Front Frame (1)
●●
7835 Left Front Frame (1) 7835 Left Front Frame (1)
●
7835 Left Front Frame (1)
●●
7835 Left Front Frame (1) 7835 Left Front Frame (1)
●●
7517 Lower Door Track (1) 7517 Lower Door Track (1)
●
7517 Lower Door Track (1)
●●
7517 Lower Door Track (1) 7517 Lower Door Track (1)
●●
7560 Ramp (1) 7560 Ramp (1)
●
7560 Ramp (1)
●●
7560 Ramp (1) 7560 Ramp (1)
The rear floor frame is made up of 2
pieces. The holes in these pieces
will align when the pieces are positioned with correct amount of overlap. The illustration below shows the
proper overall length for the rear.
1 1
1 Overlap
1 1
rightright
right and
rightright
left rear framesleft rear frames
left rear frames,
left rear framesleft rear frames
align holes, and fasten using 8 bolts
and nuts. Make 3 assemblies. Use 1
assembly for this step.
2 2
2 Position
2 2
floor frames floor frames
floor frames as shown
floor frames floor frames
and fasten at each corner using 2
bolts through the bottom and nuts on
top. When installing
side frame 7914side frame 7914
side frame 7914,
side frame 7914side frame 7914
be sure set of holes 1" in from end of
frames are installed toward rear of
building.
3 3
3 Fasten side frames together with a
3 3
truss supporttruss support
truss support using 4 bolts through
truss supporttruss support
the bottom and nuts on top.
NOTENOTE
NOTE
NOTENOTE
Position of holes, and fasten at
the 1st set of holes. See side
connection.
4 4
4 Measure the floor frame diago-
4 4
nally. When the measurements
are equal, the floor frame is square.
5 5
5 Select location of side door on
5 5
either side, toward the rear of building. Install
rampramp
ramp, notch toward outside, using
rampramp
lower door tracklower door track
lower door track and
lower door tracklower door track
1/4" bolts and nuts. See Step 12 for
Rear Door Installation.
NOTENOTE
NOTE
NOTENOTE
Do not fasten the floor frames to
your foundation at this time.
You will anchor the building
after it is erected.
IF YOU ARE BUILDING A 12x24
Fasten additional side frame 7914 and truss
support 7857 to side frame 7914 using the
side connection. Position rear frame at rear
of assembly and fasten using the rear
corner connection.
IF YOU ARE BUILDING A 12x31
Fasten 2 additional side frames 7914 and
truss supports 7857 to side frame 7914
using the side connection. Positon rear
frame at rear of assembly and fasten using
the rear corner connection.
Level
18
STEP
22
2
22
7835
STEP
33
3
33
7837
FRONTFRONT
FRONT
FRONTFRONT
7837
The floor frame The floor frame
The floor frame
The floor frame The floor frame
and level and level
and level
and level and level
7914
7857
7857
#10-32 Square Nut
7834
Position with small holes
toward outside of building
must be squaremust be square
must be square
must be squaremust be square
or holes will not align.or holes will not align.
or holes will not align.
or holes will not align.or holes will not align.
SIDE
7914
#10-32x7/16" Bolt
STEP
44
4
44
7837
REAR
8531
Notch toward outside
of building
8531
8532
STEP
55
5
55
#10-32x1/4" Bolt
7857
7517
STEP
11
1
11
Rear Frame 140 7/8"
8532
Level
7560
7517
7914
7560
Side Frame
3,6m
Slot
Page 19
Step 6Step 6
Step 6
Step 6Step 6
BW19
Each screw and bolt in the wall requires a washer.
1 1
1 Install a
1 1
corner of the floor frame as shown.
The widest part of each corner panel
must be placed along the side of the
building for all 4 corners. Fasten the
corner panel to the floor frame with 4
screws.
7825 Front Wall Panel (2) 7825 Front Wall Panel (2)
●
7825 Front Wall Panel (2)
●●
7825 Front Wall Panel (2) 7825 Front Wall Panel (2)
●●
7822 Main Wall Panel (2) 7822 Main Wall Panel (2)
●
7822 Main Wall Panel (2)
●●
7822 Main Wall Panel (2) 7822 Main Wall Panel (2)
7824
SIDE
Support the corner panel with a step
ladder until a wall panel is attached.
2 2
2 Attach the
2 2
front corner panels, as shown.
3 3
3 Attach the
3 3
rear corner panels, as shown.
Be careful to install the correct
panel in each position as shown.
4 4
4 Double-check the part numbers of
4 4
the wall panels, before proceeding.
The floor frame The floor frame
The floor frame
The floor frame The floor frame
and level and level
and level
and level and level
front wall panelsfront wall panels
front wall panels to the
front wall panelsfront wall panels
main wall panelsmain wall panels
main wall panels to the
main wall panelsmain wall panels
NOTENOTE
NOTE
NOTENOTE
must be squaremust be square
must be square
must be squaremust be square
or holes will not align.or holes will not align.
or holes will not align.
or holes will not align.or holes will not align.
STEP
11
1
11
7824
7822
7825
STEP
22
2
22
FRONT
STEP
33
3
33
7824
7822
7825
#8Ax5/16" Screw
STEP
44
4
44
7824
7825
#10-32 Square Nut
#10-32x7/16" Bolt
Washer
7825
7824
7824
Washer
7822
7822
7824
19
Page 20
Step 7Step 7
Step 7
Step 7Step 7
BW20
● Parts Needed For ●
Frames 12x10Frames 12x10
Frames 12x10
Frames 12x10Frames 12x10
●●
Rear Frame Assembly (1) Rear Frame Assembly (1)
●
Rear Frame Assembly (1)
●●
Rear Frame Assembly (1) Rear Frame Assembly (1)
●●
7834 Right Front Frame (1) 7834 Right Front Frame (1)
●
7834 Right Front Frame (1)
●●
7834 Right Front Frame (1) 7834 Right Front Frame (1)
●●
7835 Left Front Frame (1) 7835 Left Front Frame (1)
●
7835 Left Front Frame (1)
●●
7835 Left Front Frame (1) 7835 Left Front Frame (1)
●●
7837 Side Frame (2) 7837 Side Frame (2)
●
7837 Side Frame (2)
●●
7837 Side Frame (2) 7837 Side Frame (2)
●●
7950 Side Wall Channel (1) 7950 Side Wall Channel (1)
●
7950 Side Wall Channel (1)
●●
7950 Side Wall Channel (1) 7950 Side Wall Channel (1)
●●
7949 Side Wall Channel (1) 7949 Side Wall Channel (1)
●
7949 Side Wall Channel (1)
●●
7949 Side Wall Channel (1) 7949 Side Wall Channel (1)
●●
7951 Support Channel (1) 7951 Support Channel (1)
●
7951 Support Channel (1)
●●
7951 Support Channel (1) 7951 Support Channel (1)
The mid frame pieces give rigidity to
the side and rear wall.
NOTENOTE
NOTE
NOTENOTE
Before installing mid frames
decide at which location you
want the entrance door. Do not
install the 1x2 mid frame at 1 of 3
locations.
1 1
1 Fasten a
1 1
rear frame assemblyrear frame assembly
rear frame assembly to
rear frame assemblyrear frame assembly
the main wall panels using screws.
2 2
2 Fasten a
2 2
rightright
right and
rightright
left front frameleft front frame
left front frame
left front frameleft front frame
to the front wall panels the same way.
STEP
44
4
44
STEP
55
5
55
SIDE
REAR
3 3
3 Fasten
3 3
side frameside frame
side frame to the corner
side frameside frame
panels using screws. Where rear
frame overlaps side frame in corner,
fasten using 2 bolts and nuts.
4 4
4 Fasten
4 4
side wall channelsside wall channels
side wall channels to the
side wall channelsside wall channels
corner panels using screws. Fasten
overlaps in corners using bolts.
5 5
5 Fasten
5 5
support columnsupport column
support column to side
support columnsupport column
frame and side wall channel using
bolts and nuts where shown. Fold
corner panel slightly away from column to fasten bolts from outside. See
Step 12 for rear door installation.
STEP
#10-32x7/16" Bolt
#8Ax5/16" Screw
7834
7950
STEP
22
2
22
7951
7949
7835
#10-32 Square Nut
8532
11
1
11
8531
7837
STEP
33
3
33
20
Page 21
Step 8Step 8
Step 8
Step 8Step 8
BW21
● Parts Needed For ●
FramesFrames
Frames
FramesFrames
12x17, 12x24 & 12x31 12x17, 12x24 & 12x31
12x17, 12x24 & 12x31
12x17, 12x24 & 12x31 12x17, 12x24 & 12x31
●●
Rear Frame Assembly (1) Rear Frame Assembly (1)
●
Rear Frame Assembly (1)
●●
Rear Frame Assembly (1) Rear Frame Assembly (1)
●●
7834 Right Front Frame (1) 7834 Right Front Frame (1)
●
7834 Right Front Frame (1)
●●
7834 Right Front Frame (1) 7834 Right Front Frame (1)
●●
7835 Left Front Frame (1) 7835 Left Front Frame (1)
●
7835 Left Front Frame (1)
●●
7835 Left Front Frame (1) 7835 Left Front Frame (1)
●●
7917 Truss Column (see below) 7917 Truss Column (see below)
●
7917 Truss Column (see below)
●●
7917 Truss Column (see below) 7917 Truss Column (see below)
●●
7914 Side Frame (see below) 7914 Side Frame (see below)
●
7914 Side Frame (see below)
●●
7914 Side Frame (see below) 7914 Side Frame (see below)
●●
7837 Side Frame (2) 7837 Side Frame (2)
●
7837 Side Frame (2)
●●
7837 Side Frame (2) 7837 Side Frame (2)
●●
6228 Frame Support (4) 6228 Frame Support (4)
●
6228 Frame Support (4)
●●
6228 Frame Support (4) 6228 Frame Support (4)
●●
7949 Side Wall Channel (1) 7949 Side Wall Channel (1)
●
7949 Side Wall Channel (1)
●●
7949 Side Wall Channel (1) 7949 Side Wall Channel (1)
●●
7951 Support Column (1) 7951 Support Column (1)
●
7951 Support Column (1)
●●
7951 Support Column (1) 7951 Support Column (1)
The mid frame pieces give rigidity to
the side and rear wall.
NOTENOTE
NOTE
NOTENOTE
Before installing mid frames
decide at which location you
want the entrance door. Do not
install the 1x2 mid frame at 1 of 3
locations.
1 1
1 Fasten a
1 1
rear frame assemblyrear frame assembly
rear frame assembly to
rear frame assemblyrear frame assembly
the main wall panels using screws.
2 2
2 Fasten a
2 2
right right
right and
right right
left front frameleft front frame
left front frame
left front frameleft front frame
to the front wall panels the same way.
3 3
3 Attach 4
3 3
middle of the 2
frame supportsframe supports
frame supports to the
frame supportsframe supports
truss columnstruss columns
truss columns using
truss columnstruss columns
2 bolts and nuts on each.
4 4
4 Fasten
4 4
side frame 7914 side frame 7914
side frame 7914 to the rear
side frame 7914 side frame 7914
corner panel using screws. Be sure
set of holes 1" in from end of frame is
installed toward rear of building.
Where rear frame overlaps side frame
in corner, fasten using 2 bolts and
nuts. Fasten opposite end to frame
support on truss column, using 2 bolts
and nuts in the 1st set of holes. Fasten truss support to truss column at
bottom with 1screw at the 1st hole on
column. Support column assembly
with step ladder.
STEP
55
5
55
IF YOU ARE BUILDING A 12x24
Each side of building will have 2 column
assemblies and 2 extra side frames 7914.
IF YOU ARE BUILDING A 12x31
Each side of building will have 3 column
assemblies and 4 extra side frames 7914.
STEP
33
3
33
7917
7837
6228
2nd SET
OF HOLES
GAP
FRONT OF BUILDING
For a 12x24 building repeat
column procedure here
#10-32x7/16" Bolt
7837
1st HOLE
ON COLUMN
STEP
44
4
44
GAP
7914
7914
1st SET
OF HOLES
5 5
5 Fasten
5 5
side frame 7837 side frame 7837
side frame 7837 to the
side frame 7837 side frame 7837
front corner panel using screws. Fasten overlap in corner. Fasten opposite end to the frame support on truss
column, using 2nd set of holes. This
will leave a gap between side frame
and truss column.
6 6
6 Fasten
6 6
side wall channelside wall channel
side wall channel to the
side wall channelside wall channel
rear corner panel using screws.
7 7
7 Fasten
7 7
support columnsupport column
support column to side
support columnsupport column
frame and side wall channel using
bolts and nuts where shown. Fold
corner panel slightly away from column to fasten bolts from outside. See
Step 12 for rear door installation.
STEP
REAR
SIDE
8532
8531
7951
11
1
11
STEP
77
7
77
7834
#10-32 Square Nut
STEP
22
2
22
7835
7837
#8Ax5/16" Screw
7917
Support this truss column with a
step ladder until next step
7949
STEP
66
6
66
21
Page 22
Step 9Step 9
Step 9
Step 9Step 9
BW22
● Parts Needed For ●
Frames 12x10Frames 12x10
Frames 12x10
Frames 12x10Frames 12x10
●●
7839 Front Column (2) 7839 Front Column (2)
●
7839 Front Column (2)
●●
7839 Front Column (2) 7839 Front Column (2)
●●
7834 Right Front Frame (1) 7834 Right Front Frame (1)
●
7834 Right Front Frame (1)
●●
7834 Right Front Frame (1) 7834 Right Front Frame (1)
●●
7835 Left Front Frame (1) 7835 Left Front Frame (1)
●
7835 Left Front Frame (1)
●●
7835 Left Front Frame (1) 7835 Left Front Frame (1)
●●
7831 Lintel (1) 7831 Lintel (1)
●
7831 Lintel (1)
●●
7831 Lintel (1) 7831 Lintel (1)
●●
Rear Frame Assembly (1) Rear Frame Assembly (1)
●
Rear Frame Assembly (1)
●●
Rear Frame Assembly (1) Rear Frame Assembly (1)
●●
7838 Side Top Angle (2) 7838 Side Top Angle (2)
●
7838 Side Top Angle (2)
●●
7838 Side Top Angle (2) 7838 Side Top Angle (2)
●●
7958 Door Track (1) 7958 Door Track (1)
●
7958 Door Track (1)
●●
7958 Door Track (1) 7958 Door Track (1)
The top frame pieces give rigidity to
the side walls and provide a surface
for attaching the gables which support the roof.
1 1
1 Fasten
1 1
front columnsfront columns
front columns to the bot-
front columnsfront columns
tom and mid front frames with bolts
and nuts. Flange with 2 holes at each
end must be facing outside. Fold
front panel slightly away from column
to tighten bolts and nuts.
2 2
2 Fasten
2 2
rightright
right and
rightright
left front frameleft front frame
left front frame
left front frameleft front frame
to the top of front wall panels using 4
screws.
3 3
3 Position
3 3
lintellintel
lintel across top of frames
lintellintel
and columns and fasten with bolts.
4 4
4 Position
4 4
rear frame assemblyrear frame assembly
rear frame assembly
rear frame assemblyrear frame assembly
across top of main wall panels and
fasten using screws.
5 5
5 Fasten
5 5
side top anglesside top angles
side top angles to the
side top anglesside top angles
corner panels using screws. Fasten
support column to top angle using a
bolt.
6 6
6 Position
6 6
door trackdoor track
door track to the inside of
door trackdoor track
side top angle, butted up against support column. With short flange of
track at bottom, fasten angle to track
using 4 screws at the 2nd, 3rd, 4th
and 5th hole in from support column.
See Step 12 for rear door installation.
STEP
44
4
44
2 HOLES
LONG
FLANGE
SHORT
FLANGE
SIDE TOP
ANGLE
TRACK
2 HOLES
INSIDE
STEP
STEP
66
6
66
7835
8532
8531
7838
#8Ax5/16" Screw
FACING
INSIDE
STEP
7831
STEP
33
3
33
STEP
79587834
11
1
11
#10-32x7/16" Bolt
7839
#10-32 Square Nut
FRONT OF
BUILDING
22
2
22
7839
22
INSIDE
55
5
55
Page 23
Step 10Step 10
Step 10
Step 10Step 10
BW23
● Parts Needed For ●
FramesFrames
Frames
FramesFrames
12x17, 12x24 & 12x31 12x17, 12x24 & 12x31
12x17, 12x24 & 12x31
12x17, 12x24 & 12x31 12x17, 12x24 & 12x31
●●
7839 Front Column (2) 7839 Front Column (2)
●
7839 Front Column (2)
●●
7839 Front Column (2) 7839 Front Column (2)
●●
7834 Right Front Frame (1) 7834 Right Front Frame (1)
●
7834 Right Front Frame (1)
●●
7834 Right Front Frame (1) 7834 Right Front Frame (1)
●●
7835 Left Front Frame (1) 7835 Left Front Frame (1)
●
7835 Left Front Frame (1)
●●
7835 Left Front Frame (1) 7835 Left Front Frame (1)
●●
7831 Lintel (1) 7831 Lintel (1)
●
7831 Lintel (1)
●●
7831 Lintel (1) 7831 Lintel (1)
●●
Rear Frame Assembly (1) Rear Frame Assembly (1)
●
Rear Frame Assembly (1)
●●
Rear Frame Assembly (1) Rear Frame Assembly (1)
●●
7915 Side Top Angle (see below) 7915 Side Top Angle (see below)
●
7915 Side Top Angle (see below)
●●
7915 Side Top Angle (see below) 7915 Side Top Angle (see below)
●●
7838 Side Top Angle (2) 7838 Side Top Angle (2)
●
7838 Side Top Angle (2)
●●
7838 Side Top Angle (2) 7838 Side Top Angle (2)
●●
7958 Door Track (1) 7958 Door Track (1)
●
7958 Door Track (1)
●●
7958 Door Track (1) 7958 Door Track (1)
The top frame pieces give rigidity to
the side walls and provide a surface
for attaching the gables which support the roof.
1 1
1 Fasten
1 1
front columns front columns
front columns to the bot-
front columns front columns
tom and mid front frames with bolts
and nuts. Flange with 2 holes at each
end must be facing outside. Fold
front panel slightly away from column
to tighten bolts and nuts.
2 2
2 Fasten
2 2
right right
right and
right right
left front frame left front frame
left front frame
left front frame left front frame
to the top of front wall panels using 4
screws.
3 3
3 Position
3 3
lintel lintel
lintel across top of frames
lintel lintel
and columns and fasten with bolts.
4 4
4 Position
4 4
rear frame assemblyrear frame assembly
rear frame assembly
rear frame assemblyrear frame assembly
across top of main wall panels and
fasten using screws.
IF YOU ARE BUILDING A 12x24
Repeat side top angle assembly using 2
additional angles 7915.
IF YOU ARE BUILDING A 12x31
Repeat side top angle assembly using 4
additional angles 7915.
STEP
33
3
33
SIDE TOP
ANGLE
5 5
5 Fasten
5 5
side top angles 7915side top angles 7915
side top angles 7915 to
side top angles 7915side top angles 7915
the truss column using a screw and to
rear corner panels using screws.
6 6
6 Fasten
6 6
under
7915 7915
7915 and fasten to front corner
7915 7915
side top angles 7838side top angles 7838
side top angles 7838
side top angles 7838side top angles 7838
panels using screws. Fasten overlap (2 1/2" 6cm) with 2 bolts and nuts.
Side angles overlap front and rear
frames in the corners. Fasten support column to side top angle using a
bolt and nut.
7 7
7 Position
7 7
door trackdoor track
door track to the inside of
door trackdoor track
side top angle, butted up against support column. With short flange of
track at bottom, fasten angle to track
using 4 screws at the 2nd, 3rd, 4th
and 5th hole in from support column.
See Step 12 for rear door installation.
2 HOLES
STEP
22
2
22
7834
INSIDE
7838
#10-32 Square Nut
7831
STEP
33
3
33
7839
STEP
11
1
11
7839
7835
LONG
FLANGE
SHORT
FLANGE
7915
FRONT OF
BUILDING
TRACK
STEP
STEP
44
4
44
8532
7958
#8Ax5/16" Screw
66
6
66
STEP
FACING
INSIDE
55
5
55
8531
STEP
77
7
77
2 HOLES
#10-32 x7/16" Bolt
INSIDE
23
Page 24
Step 11Step 11
Step 11
Step 11Step 11
BW24
● Parts Needed For ●
WW
W
WW
alls alls
alls
alls alls
All SizAll Siz
All Siz
All SizAll Siz
eses
es
eses
●●
7822 Main Wall Panel (see below) 7822 Main Wall Panel (see below)
●
7822 Main Wall Panel (see below)
●●
7822 Main Wall Panel (see below) 7822 Main Wall Panel (see below)
●●
7823 Medium Wall Panel (1) 7823 Medium Wall Panel (1)
●
7823 Medium Wall Panel (1)
●●
7823 Medium Wall Panel (1) 7823 Medium Wall Panel (1)
Each wall panel has a crimped rib on
1 side. The crimped rib should go
under the rib of the panel that follows
it. Leave out 1 main wall panel at the
side or rear entry door location.
1 1
1 Fasten the
1 1
top and bottom with screws.
2 2
2 Fasten center of each panel to the
2 2
mid frames with screws. Fasten overlapping ribs using 2 screws and a
bolt with nut at the center.
3 3
3 At the rear center of the building,
3 3
fasten the
same manner.
main wall panelsmain wall panels
main wall panels at the
main wall panelsmain wall panels
medium wall panel medium wall panel
medium wall panel in the
medium wall panel medium wall panel
Crimped Rib
Underneath
IF YOU ARE BUILDING A 12x24
Install 3 additional main wall panels on
each side of the building.
IF YOU ARE BUILDING A 12x31
Install 6 additional main wall panels on
each side of the building.
STEP
33
3
33
7823
24
SCREWS TO FRAME
WIDE RIB
SCREWS TO
SCREWS TO FRAME
MEDIUM WALL PANELMEDIUM WALL PANEL
MEDIUM WALL PANEL
MEDIUM WALL PANELMEDIUM WALL PANEL
NARROW RIB
(HAS BEAD)
FRAME
BOLT TO
PANEL
SCREW
TO RIB
SCREW
TO RIB
#10-32 Square Nut
7822
STEP
11
1
11
#10-32x7/16" Screw
Washer
#8Ax5/16" Screw
At the truss columns, fasten rib with bolt,
washer & nut before screws are installed.
Detail Showing
Center of Panel Screwed
to Side Frame
STEP
22
2
22
Bolt and nut
does not go
thru side frame
at overlap
Page 25
Step 12Step 12
Step 12
Step 12Step 12
BW25
Using the previous side entry door
steps and this illustration, you can
install the entry door at 2 locations
along the rear wall. Whichever you
choose, the door will always slide
towards the corner of the building.
Rear EntrRear Entr
Rear Entr
Rear EntrRear Entr
● Parts Needed For ●
y Door y Door
y Door
y Door y Door
All SizAll Siz
All Siz
All SizAll Siz
eses
es
eses
●●
7517 Lower Door Track (1) 7517 Lower Door Track (1)
●
7517 Lower Door Track (1)
●●
7517 Lower Door Track (1) 7517 Lower Door Track (1)
●●
7560 Ramp (1) 7560 Ramp (1)
●
7560 Ramp (1)
●●
7560 Ramp (1) 7560 Ramp (1)
●●
8530 Splice Channel (1) 8530 Splice Channel (1)
●
8530 Splice Channel (1)
●●
8530 Splice Channel (1) 8530 Splice Channel (1)
●●
7951 Support Column (1) 7951 Support Column (1)
●
7951 Support Column (1)
●●
7951 Support Column (1) 7951 Support Column (1)
●●
7958 Door Track (1) 7958 Door Track (1)
●
7958 Door Track (1)
●●
7958 Door Track (1) 7958 Door Track (1)
11
1Install
11
using 1/4" bolts and nuts.
22
2Fasten
22
down, to rear frame and to
column column
column using bolts and nuts, and to
column column
wall panel using screws. Fasten support column to rear frames using bolts
and nuts. Fold rear wall panel slightly
away from column to tighten bolts
and nuts.
33
3Position
33
the rear frame, butted up against support column. With short flange of track
at bottom, fasten frame to track using
4 screws at the 2nd, 3rd, 4th and 5th
hole in from support column.
lower door track lower door track
lower door track and
lower door track lower door track
splice channel, splice channel,
splice channel, upside
splice channel, splice channel,
supportsupport
support
supportsupport
door track door track
door track to the inside of
door track door track
7948
Step 13
rampramp
ramp
rampramp
7958
STEP
33
3
33
7951
STEP
22
2
22
8530
7517
STEP
11
1
11
7560
INSIDE OF
BUILDING
INSIDE
25
Page 26
Step 13Step 13
Step 13
Step 13Step 13
Side or Rear EntrSide or Rear Entr
Side or Rear Entr
BW26
The door jambs reinforce the door
opening and provide an attractive
trim. Follow these steps for both door
jambs.
Side or Rear EntrSide or Rear Entr
● Parts Needed For ●
y Door y Door
y Door
y Door y Door
All SizAll Siz
All Siz
All SizAll Siz
●●
7946 Door Jamb (2) 7946 Door Jamb (2)
●
7946 Door Jamb (2)
●●
7946 Door Jamb (2) 7946 Door Jamb (2)
●●
7948 Door Wall Brace (1) 7948 Door Wall Brace (1)
●
7948 Door Wall Brace (1)
●●
7948 Door Wall Brace (1) 7948 Door Wall Brace (1)
●●
7972 Door Handle Lock Bracket (1) 7972 Door Handle Lock Bracket (1)
●
7972 Door Handle Lock Bracket (1)
●●
7972 Door Handle Lock Bracket (1) 7972 Door Handle Lock Bracket (1)
eses
es
eses
11
1Place
11
panel in the direction of sliding door.
Fasten panel to brace using screws.
22
2Overlap rib of wall panel with a
22
door jamb door jamb
door jamb and fasten at top to angle,
door jamb door jamb
middle to brace, and bottom to frame
using #6Ax7/8" screws and spacers.
Position spacer inside wall panel rib.
33
3Fasten outer flange of door jamb to
33
wall panel using 3 screws.
44
4Secure the
44
bracket bracket
bracket to the opposite door jamb at
bracket bracket
the middle hole with a (no slot) bolt.
door wall brace door wall brace
door wall brace behind wall
door wall brace door wall brace
door handle lockdoor handle lock
door handle lock
door handle lockdoor handle lock
Inside of
Building
STEP
22
2
22
Direction of Sliding Door
Remove and reinset
screws from panel
26
STEP
11
1
11
#8Ax5/16" Screw
7948
STEP
33
3
33
7946
7946
#6Ax7/8" Screw
7972
STEP
44
4
44
#10-32x7/16"
(No Slot) Bolt
Page 27
Step 14Step 14
Step 14
Step 14Step 14
BW27
● Parts Needed For ●
TT
rr
acac
T
TT
k Suppork Suppor
r
ac
k Suppor
rr
acac
k Suppork Suppor
ts ts
ts
ts ts
All SizAll Siz
All Siz
All SizAll Siz
eses
es
eses
●●
7840 Right Track Support (1) 7840 Right Track Support (1)
●
7840 Right Track Support (1)
●●
7840 Right Track Support (1) 7840 Right Track Support (1)
●●
7841 Left Track Support (1) 7841 Left Track Support (1)
●
7841 Left Track Support (1)
●●
7841 Left Track Support (1) 7841 Left Track Support (1)
11
1Fasten
11
ports ports
ports to the front columns using 5
ports ports
bolts from the inside and nuts outside.
Flanges on track supports
face
right right
right and
right right
NOTENOTE
NOTE
NOTENOTE
towards front of building.
left track sup-left track sup-
left track sup-
left track sup-left track sup-
#10-32x7/16" Bolt
must
Step 15Step 15
Step 15
Step 15Step 15
11
1Position Truss Assembly on build-
11
ing by sliding truss upper chords over
truss columns and fasten with 6 bolts
and nuts on each side.
TT
T
TT
● Parts Needed For ●
rr
uss 12x17,uss 12x17,
r
uss 12x17,
rr
uss 12x17,uss 12x17,
12x24 & 12x31 12x24 & 12x31
12x24 & 12x31
12x24 & 12x31 12x24 & 12x31
●●
Truss Assembly (see below) Truss Assembly (see below)
●
Truss Assembly (see below)
●●
Truss Assembly (see below) Truss Assembly (see below)
IF YOU ARE BUILDING A 12x24
Install 2 trusses on truss columns
IF YOU ARE BUILDING A 12x31
Install 3 trusses on truss columns
roof beam behind the front gable by
placing tab on end of strut
the roof beams. Align the tab with
holes and fasten strut with 2 bolts.
99
9Fasten the lower end of the strut to
99
center gable flange with 2 bolts.
Do not tighten bolts and nuts
until the strut is assembled at rear
1010
10Repeat Steps 8 & 9 for rear of
1010
building.
gable strut gable strut
gable strut to the middle
gable strut gable strut
between
NOTENOTE
NOTE
NOTENOTE
STEP
44
4
44
STEP
66
6
66
STEP
55
5
55
STEP
99
9
99
STEP
88
8
88
STEP
11
1
11
STEP
77
7
77
STEP
33
3
33
STEP
1010
10
1010
STEP
22
2
22
30
Page 31
Step 19Step 19
Step 19
Step 19Step 19
BW31
11
1Square the building on the founda-
11
tion and at the top, by measuring
diagonally from corner to corner as
previously done.
22
2Use string to check and see if the
22
sides and rear of building are straight,
not bowed inward or outward.
33
3Level the full perimeter of the floor
33
frame. Shim under with wood shingles if necessary.
44
4Square the front of building as pre-
44
viously done for base.
SquarSquar
Squar
SquarSquar
ing the Building ing the Building
ing the Building
ing the Building ing the Building
NOTENOTE
NOTE
NOTENOTE
The 95" (2,41m) door opening
must be held for proper door
alignment. Measure between
the left and right track support.
All SizAll Siz
All Siz
All SizAll Siz
eses
es
eses
55
5Anchor front frame to concrete with
55
1/4" diameter expandable anchor
bolts or other means, where shown.
STEP
44
4
44
STEP
33
3
33
STEP
55
5
55
(2,41m)
STEP
11
1
11
(2,41m)
STEP
22
2
22
31
Page 32
Step 20Step 20
Step 20
Step 20Step 20
BW32
CorCor
Cor
CorCor
● Parts Needed For ●
ner Roof Pner Roof P
ner Roof P
ner Roof Pner Roof P
anels anels
anels
anels anels
All SizAll Siz
All Siz
All SizAll Siz
eses
es
eses
●●
7826 Right Roof Panel (2) 7826 Right Roof Panel (2)
●
7826 Right Roof Panel (2)
●●
7826 Right Roof Panel (2) 7826 Right Roof Panel (2)
●●
7827 Left Roof Panel (1) 7827 Left Roof Panel (1)
●
7827 Left Roof Panel (1)
●●
7827 Left Roof Panel (1) 7827 Left Roof Panel (1)
Installing the roof panels is best done
with a step ladder. Each screw and
bolt in the roof requires a washer.
Support lintel by propping up at center with a wood 2x4 until sag is gone
and there are no buckles in gables.
11
1Position a
11
front left corner and fasten to the gable
and roof beams using screws and
bolts as shown.
lower end of the panels to the side top
angle at this time.
Hint: Hint:
Hint: Follow the fastener sequence
Hint: Hint:
shown, for proper alignment.
right roof panel right roof panel
right roof panel at the
right roof panel right roof panel
Do not fasten the
22
2Install the
22
side in the position shown. Remove
lintel support.
33
3Temporarily install a second right
33
roof panel loosely as shown, for removal later. Do not fasten left rear
panel at this time.
lapping rib of left corner roof panel.
Fasten overlap at center of roof panel
rib using a bolt and nut. Fasten to roof
beams as before using screws.
22
2Cut the
22
into 4 strips, each strip being about 2"
(5cm) long.
33
3Cover the joint at the peak with
33
weather stripping tape. Unroll the tape
and press it down over the opening at
the ridge as you install each roof
panel. Do not cut the tape at this time.
middle roof panel middle roof panel
middle roof panel over-
middle roof panel middle roof panel
weather stripping tapeweather stripping tape
weather stripping tape
weather stripping tapeweather stripping tape
STEP
44
4
44
STEP
44
4Install a middle roof panel on the
44
left side of building. At the top roof
beam end of panels, fasten 1st roof
panel rib overlaps with a bolt and nut.
Press 2 strips over the bolt heads.
Save the other 2 strips for the next
overlap. Remember, the crimped rib
is always overlapped by wide rib of
adjacent panel.
lapping rib of left corner roof panel.
Fasten overlap at center of roof panel
rib using a bolt and nut. Fasten to roof
beams as before using screws.
22
2Cut the
22
into 8 strips, each strip being about 2"
(5cm) long.
33
3Cover the joint at the peak with
33
weather stripping tape. Unroll the tape
and press it down over the opening at
the ridge as you install each roof
panel. Do not cut the tape at this time.
44
4Install a middle roof panel on the
44
left side of building. At the top roof
beam end of panels, fasten 1st roof
panel rib overlaps with a bolt and nut.
Press 2 strips over the bolt heads.
middle roof panel middle roof panel
middle roof panel over-
middle roof panel middle roof panel
weather stripping tapeweather stripping tape
weather stripping tape
weather stripping tapeweather stripping tape
IF YOU ARE BUILDING A 12x24
Cut 12 2" (5cm) strips. There are 3 extra
middle roof panels on each side of building.
Fasten 7th and 8th panel overlap and apply
strip over head of bolt, along with ridge caps.
IF YOU ARE BUILDING A 12x31
Cut 16 2" (5cm) strips. There are 6 extra
middle roof panels on each side of building.
Fasten 7th, 8th, 10th & 11th panel overlap
and apply strip over head of bolt, along with
ridge caps.
Save the other strips for the 2nd, 4th and
5th overlaps. Remember, the crimped
rib is always overlapped by wide rib of
adjacent panel. Repeat procedure with 2
more middle roof panels working side to
side.
7828 Middle Roof Panel (see below) 7828 Middle Roof Panel (see below)
●
7828 Middle Roof Panel (see below)
●●
7828 Middle Roof Panel (see below) 7828 Middle Roof Panel (see below)
●●
7843 Ridge Cap (see below) 7843 Ridge Cap (see below)
●
7843 Ridge Cap (see below)
●●
7843 Ridge Cap (see below) 7843 Ridge Cap (see below)
●●
7827 Left Roof Panel (1) 7827 Left Roof Panel (1)
●
7827 Left Roof Panel (1)
●●
7827 Left Roof Panel (1) 7827 Left Roof Panel (1)
●●
6874 Ridge Cap (1) 6874 Ridge Cap (1)
●
6874 Ridge Cap (1)
●●
6874 Ridge Cap (1) 6874 Ridge Cap (1)
11
1Continue weather stripping and fas-
11
tening overlaps.
22
2Position a
22
completed front roof section.
33
3Install 2
33
44
4Install the second
44
overlapping the first ridge cap. Align
the holes and fasten using bolts.
55
5Temporarily remove right rear roof
55
panel. Install 4
As each panel is fastened, carefully
raise 2nd ridge cap slightly away
from panels for fasteners and tape.
ridge cap 7843 ridge cap 7843
ridge cap 7843 on the
ridge cap 7843 ridge cap 7843
middle roof panels.middle roof panels.
middle roof panels.
middle roof panels.middle roof panels.
ridge cap 7843ridge cap 7843
ridge cap 7843
ridge cap 7843ridge cap 7843
middle roof panels.middle roof panels.
middle roof panels.
middle roof panels.middle roof panels.
66
6Install the
66
panels panels
panels at the rear gables. Follow
panels panels
fastener sequence.
77
7Install the third
77
overlapping the second ridge cap.
Align the holes and fasten using
bolts.
88
8Fasten the lower end of the pan-
88
els to the side top angle using
screws.
right right
right and
right right
ridge cap 6874ridge cap 6874
ridge cap 6874
ridge cap 6874ridge cap 6874
left roofleft roof
left roof
left roofleft roof
IF YOU ARE BUILDING A 12x24
Replace ridge cap 6874 with an additional
ridge cap 7843 and install ridge cap 6874
to rear of building.
STEP
55
5
55
STEP
77
7
77
STEP
11
1
11
STEP
66
6
66
STEP
44
4
44
STEP
22
2
22
IF YOU ARE BUILDING A 12x31
Replace ridge cap 6874 with 2 additional
ridge caps 7843 and install ridge cap
6874 to rear of building.
STEP
33
3
33
STEP
88
8
88
36
Page 37
Step 25Step 25
Step 25
Step 25Step 25
BW37
● Parts Needed For ●
TT
rr
im 12x10im 12x10
T
r
im 12x10
TT
rr
im 12x10im 12x10
●●
5220 Side Roof Trim (2) 5220 Side Roof Trim (2)
●
5220 Side Roof Trim (2)
●●
5220 Side Roof Trim (2) 5220 Side Roof Trim (2)
●●
6014 Side Roof Trim (2) 6014 Side Roof Trim (2)
●
6014 Side Roof Trim (2)
●●
6014 Side Roof Trim (2) 6014 Side Roof Trim (2)
●●
7846 Right Rake (2) 7846 Right Rake (2)
●
7846 Right Rake (2)
●●
7846 Right Rake (2) 7846 Right Rake (2)
●●
7845 Left Rack (2) 7845 Left Rack (2)
●
7845 Left Rack (2)
●●
7845 Left Rack (2) 7845 Left Rack (2)
11
1Attach the
11
lower end of the roof panels on each
side of the building using screws at
each panel overlap.
A single screw fastens both trim
pieces at the overlap.
22
2Position
22
ends of roof, noting that rake slips
under ridge cap, but fits on top of side
roof trim. Fasten rake to the center of
roof panel rib using a bolt.
side roof trim side roof trim
side roof trim to the
side roof trim side roof trim
NOTENOTE
NOTE
NOTENOTE
left left
left and
left left
right rake right rake
right rake to the
right rake right rake
33
3Fasten roof panel rib, rake,
33
cap cap
cap and ridge cap together using bolts
cap cap
and nuts. Fasten remaining peak cap
in the same manner.
44
4Using your thumb and index finger,
44
overbend the bottom flange of the side
roof trim at the corner inward enough
so the right and left roof trim caps fit
onto right and left corners.
55
5Fasten rake to side trim using a screw
55
into roof panel.
66
6Fasten the roof trim caps to the side
66
trim using a screw.
peakpeak
peak
peakpeak
STEP
33
3
33
STEP
22
2
22
STEP
44
4
44
STEP
55
5
55
STEP
66
6
66
STEP
11
1
11
37
Page 38
Step 26Step 26
Step 26
Step 26Step 26
BW38
● Parts Needed For ●
TT
rr
im 12x17,im 12x17,
T
r
im 12x17,
TT
rr
im 12x17,im 12x17,
12x24 & 12x31 12x24 & 12x31
12x24 & 12x31
12x24 & 12x31 12x24 & 12x31
●●
5220 Side Roof Trim (see below) 5220 Side Roof Trim (see below)
●
5220 Side Roof Trim (see below)
●●
5220 Side Roof Trim (see below) 5220 Side Roof Trim (see below)
●●
6014 Side Roof Trim (2) 6014 Side Roof Trim (2)
●
6014 Side Roof Trim (2)
●●
6014 Side Roof Trim (2) 6014 Side Roof Trim (2)
●●
7845 Left Rack (2) 7845 Left Rack (2)
●
7845 Left Rack (2)
●●
7845 Left Rack (2) 7845 Left Rack (2)
●●
7846 Right Rake (2) 7846 Right Rake (2)
●
7846 Right Rake (2)
●●
7846 Right Rake (2) 7846 Right Rake (2)
11
1Attach the
11
lower end of the roof panels on each
side of the building using screws at
each panel overlap.
A single screw fastens both trim
pieces at the overlap.
22
2Position
22
ends of roof, noting that rake slips
under ridge cap, but fits on top of side
roof trim. Fasten rake to the center of
roof panel rib using a bolt.
33
3Fasten roof panel rib, rake,
33
cap cap
cap and ridge cap together using
cap cap
bolts and nuts. Fasten remaining
peak cap in the same manner.
side roof trim side roof trim
side roof trim to the
side roof trim side roof trim
NOTENOTE
NOTE
NOTENOTE
left left
left and
left left
right rake right rake
right rake to the
right rake right rake
peakpeak
peak
peakpeak
IF YOU ARE BUILDING A 12x24
Install additional side roof trim 5220 towards
rear of building.
IF YOU ARE BUILDING A 12x31
Install 2 additional side roof trim 5220 pieces
towards rear of building.
44
4Using your thumb and index finger,
44
overbend the bottom flange of the
side roof trim at the corner inward
enough so the right and left roof trim
caps fit onto right and left corners.
55
5Fasten rake to side trim using a
55
screw into roof panel.
66
6Fasten the roof trim caps to the side
66
trim using a screw.
STEP
33
3
33
STEP
55
5
55
STEP
11
1
11
STEP
STEP
22
2
22
44
4
44
STEP
66
6
66
38
Page 39
Step 27Step 27
Step 27
Step 27Step 27
BW39
NOTENOTE
NOTE
NOTENOTE
To assemble door to slide from
left to right (opening), position
door with handle holes on left side
of door. Position handle holes on
right side if door is to slide from
right to left (opening).
Each bolt and screw in the door requires a washer.
Side or Rear EntrSide or Rear Entr
Side or Rear Entr
Side or Rear EntrSide or Rear Entr
● Parts Needed For ●
y Door y Door
y Door
y Door y Door
All SizAll Siz
All Siz
All SizAll Siz
eses
es
eses
●●
7945 Door (1) 7945 Door (1)
●
7945 Door (1)
●●
7945 Door (1) 7945 Door (1)
●●
3719 Door Handle Brace (1) 3719 Door Handle Brace (1)
●
3719 Door Handle Brace (1)
●●
3719 Door Handle Brace (1) 3719 Door Handle Brace (1)
●●
7947 Vertical Door Brace (1) 7947 Vertical Door Brace (1)
●
7947 Vertical Door Brace (1)
●●
7947 Vertical Door Brace (1) 7947 Vertical Door Brace (1)
●●
6264 Horizontal Door Brace (2) 6264 Horizontal Door Brace (2)
●
6264 Horizontal Door Brace (2)
●●
6264 Horizontal Door Brace (2) 6264 Horizontal Door Brace (2)
11
1Attach the
11
handle handle
handle to the
handle handle
shown.
22
2Swing the door handle brace up to
22
the hole in the center of the door and
insert a screw.
33
3Hold the
33
against the center of the inside surface of the door and turn the screw to
hold the vertical door brace and door
handle brace in place. Fasten to door
above and below center connection
using 2 screws.
44
4Insert a second bolt in the door
44
handle and tighten both bolts.
55
5Put a
55
the top edge
fasten
door handle brace door handle brace
door handle brace and
door handle brace door handle brace
door door
door with 1 bolt as
door door
Don't tighten the bolt yet.
vertical door bracevertical door brace
vertical door brace
vertical door bracevertical door brace
horizontal door brace horizontal door brace
horizontal door brace onto
horizontal door brace horizontal door brace
and
bottom edge and
with 1 bolt in the center.
STEP
11
1
11
STEP
55
5
55
STEP
22
2
22
STEP
33
3
33
66
6Attach the
66
shown.
lower door guides lower door guides
lower door guides as
lower door guides lower door guides
STEP
66
6
66
STEP
44
4
44
39
Page 40
Step 28Step 28
Step 28
Step 28Step 28
BW40
● Parts Needed For ●
Side or Rear EntrSide or Rear Entr
Side or Rear Entr
Side or Rear EntrSide or Rear Entr
y Door y Door
y Door
y Door y Door
All SizAll Siz
All Siz
All SizAll Siz
eses
es
eses
●●
Door Assembly (1) Door Assembly (1)
●
Door Assembly (1)
●●
Door Assembly (1) Door Assembly (1)
11
1Position
11
from the end of door track, as shown
in the end view.
22
2From inside the building, put the
22
bottom of the door behind door jamb
into the lower door track.
33
3Position the top of the door so that
33
the holes in the door line up with the
holes in the door slides.
7848 Door Panel (Lock) (1) 7848 Door Panel (Lock) (1)
●
7848 Door Panel (Lock) (1)
●●
7848 Door Panel (Lock) (1) 7848 Door Panel (Lock) (1)
11
1With the key, unlock the outside
11
locking handle locking handle
locking handle and rotate the han-
locking handle locking handle
dle to a vertical position. Insert the
square shank through the hole located in the center of
section. section.
section. Slide in the
section. section.
and insert the #10-32x2 1/2" flat head
bolts through handle, spacer and stile.
Secure with square nuts and tighten.
22
2Turn the locking handle to a hori-
22
zontal position. Slide the
bar spacer bar spacer
bar spacer over the square shank of
bar spacer bar spacer
the lock handle and slip the
bar bar
bar over shank. Secure with the
bar bar
side "T" handle. side "T" handle.
side "T" handle. Tighten set screw
side "T" handle. side "T" handle.
in handle. Attach small
holes on the flat latch bar. Slip opposite end of "S" hooks through
chains.chains.
chains.
chains.chains.
door panel lockdoor panel lock
door panel lock
door panel lockdoor panel lock
stile spacersstile spacers
stile spacers
stile spacersstile spacers
inside latchinside latch
inside latch
inside latchinside latch
flat latchflat latch
flat latch
flat latchflat latch
in-in-
in-
in-in-
"S" hooks "S" hooks
"S" hooks to
"S" hooks "S" hooks
latchlatch
latch
latchlatch
STEP
11
1
11
STEP
22
2
22
33
3Attach the
33
end stiles on the lock section. Attach
"S" hooks to the holes on top of the
latches. Attach the latch chains to the
"S" hooks so that the chain is taut.
Hint: Hint:
Hint: If chain is too tight, latches will
Hint: Hint:
not engage strikes (on track) properly. If chain is too loose, the lock
handle will not retract latches. Adjust
chains by changing the hole location
of "S" hook through chain.
44
4Attach
44
the upper corners of end stiles. Fasten #1 hinge to the middle stile.
Hint: Hint:
Hint: When installing hinges, be sure
Hint: Hint:
the hinge number is always on the
lower hinge leaf.
spring latches spring latches
spring latches to the
spring latches spring latches
#2 hinges #2 hinges
#2 hinges to lock section at
#2 hinges #2 hinges
STEP
44
4
44
STEP
33
3
33
42
Page 43
Step 31Step 31
Step 31
Step 31Step 31
BW43
NOTENOTE
NOTE
NOTENOTE
When rib neck bolts are inserted
in the track, use bolts with heads
located on the inner side of the
track to prevent interference with
the movement of the rollers.
VV
V
VV
erer
er
erer
● Parts Needed For ●
tical tical
tical
tical tical
TT
T
TT
rr
acac
ks Roll-Up-Doorks Roll-Up-Door
r
ac
ks Roll-Up-Door
rr
acac
ks Roll-Up-Doorks Roll-Up-Door
●●
67510 Right Vertical Track (1) 67510 Right Vertical Track (1)
●
67510 Right Vertical Track (1)
●●
67510 Right Vertical Track (1) 67510 Right Vertical Track (1)
●●
67509 Left Vertical Track (1) 67509 Left Vertical Track (1)
●
67509 Left Vertical Track (1)
●●
67509 Left Vertical Track (1) 67509 Left Vertical Track (1)
STEP
11
1
11
11
1Insert the
11
holes on the hinges furthest out from
the face of the end stiles on both
panels. Note that #1 hinge has only
one barrel. Insert rollers through the
tabs on the bottom brackets on bottom section.
22
2Attach
22
loosely to right and left track supports
using 1/4-20x1/2" hex head bolts and
square nuts.
33
3Attach spring latch
33
to vertical tracks using 1/4-20x1/2"
rib neck bolts and square nuts.
44
4Lift the bottom section and insert
44
the rollers into the vertical tracks. Slide
the panel down and level across top.
Shim to level if necessary.
roller roller
roller shaft into the barrel
roller roller
right right
right and
right right
left vertical tracksleft vertical tracks
left vertical tracks
left vertical tracksleft vertical tracks
strikers strikers
strikers loosely
strikers strikers
STEP
22
2
22
STEP
33
3
33
55
5Insert lock section into vertical
55
tracks. Attach hinges from #1 to #2
panel by inserting #10Bx1/2" truss
head screws at bottom edge of lock
section. Do not fasten the last door
panel at this time.
STEP
55
5
55
STEP
44
4
44
43
Page 44
Step 32Step 32
Step 32
Step 32Step 32
BW44
HorHor
Hor
HorHor
● Parts Needed For ●
iziz
ontal ontal
iz
ontal
iziz
ontal ontal
TT
T
TT
rr
acac
k Roll-Up-Doork Roll-Up-Door
r
ac
k Roll-Up-Door
rr
acac
k Roll-Up-Doork Roll-Up-Door
●●
7913 Spring Support Bracket (2) 7913 Spring Support Bracket (2)
●
7913 Spring Support Bracket (2)
●●
7913 Spring Support Bracket (2) 7913 Spring Support Bracket (2)
●●
67476 Right Horizontal Track (1) 67476 Right Horizontal Track (1)
●
67476 Right Horizontal Track (1)
●●
67476 Right Horizontal Track (1) 67476 Right Horizontal Track (1)
●●
67475 Left Horizontal Track (1) 67475 Left Horizontal Track (1)
●
67475 Left Horizontal Track (1)
●●
67475 Left Horizontal Track (1) 67475 Left Horizontal Track (1)
●●
7857 Truss Support (2) 7857 Truss Support (2)
●
7857 Truss Support (2)
●●
7857 Truss Support (2) 7857 Truss Support (2)
●●
7847 Door Panel (Top) (1) 7847 Door Panel (Top) (1)
●
7847 Door Panel (Top) (1)
●●
7847 Door Panel (Top) (1) 7847 Door Panel (Top) (1)
11
1Install
11
the roof beams using #10-32x7/16"
bolts and #10-32 square nuts.
22
2Attach the
22
track track
track to right & left vertical track using
track track
bolts and nuts shown loosely.
33
3Fasten horizontal tracks loosely to
33
spring support brackets using 1/420x1/2" hex head bolts and 1/4-20
square nuts. Remove lower bolt at
gable end of roof beam. Position
truss support truss support
truss support with 2" (5cm) flange
truss support truss support
against roof beam. Replace bolt to
fasten support, brace and roof beam.
Fasten opposite end to vertical track
angle at the 3rd hole in from the end
using #10-32x7/16" bolt and #10-32
square nut. Tighten all bolts and nuts.
spring support brackets spring support brackets
spring support brackets to
spring support brackets spring support brackets
right right
right and
right right
left horizontalleft horizontal
left horizontal
left horizontalleft horizontal
STEP
11
1
11
STEP
22
2
22
44
4Attach the
44
to the 3rd hole on the support angle of
the horizontal track using 3/8 - 16 x
1 1/2" hex head bolt & 3/8-16 hex nut.
55
5Position third
55
tion tion
tion on second panel. Fasten top of
tion tion
hinges to bottom of third door panel
using #10Bx1/2" truss head screws.
66
6Engage roller with
66
roller into horizontal track. Move assembly to line up with holes in end
stile and fasten with #10Bx1/2" truss
head screws.
STEP
sheave sheave
sheave (pulley wheel)
sheave sheave
door panel top sec-door panel top sec-
door panel top sec-
door panel top sec-door panel top sec-
top fixture, top fixture,
top fixture, slide
top fixture, top fixture,
66
6
66
STEP
33
3
33
STEP
44
4
44
44
STEP
55
5
55
Page 45
Step 33Step 33
Step 33
Step 33Step 33
BW45
CAUTION:CAUTION:
CAUTION:
CAUTION:CAUTION:
FROM THIS POINT ON, BE SUREFROM THIS POINT ON, BE SURE
FROM THIS POINT ON, BE SURE
FROM THIS POINT ON, BE SUREFROM THIS POINT ON, BE SURE
TO USE EXTREME CAUTIONTO USE EXTREME CAUTION
TO USE EXTREME CAUTION
TO USE EXTREME CAUTIONTO USE EXTREME CAUTION
UNTIL THE DOOR IS PROPERLYUNTIL THE DOOR IS PROPERLY
UNTIL THE DOOR IS PROPERLY
UNTIL THE DOOR IS PROPERLYUNTIL THE DOOR IS PROPERLY
SPRUNG AND OPERATINGSPRUNG AND OPERATING
SPRUNG AND OPERATING
SPRUNG AND OPERATINGSPRUNG AND OPERATING
11
1Attach
11
Fasten
opposite ends of springs using a 3/816x1 1/2" hex head bolt and 3/8 nut.
Attach spring assemblies to spring
support brackets.
22
2Carefully raise the door to a fully
22
open position and prop. Make sure
the door is level in the opening. Slip
the keyed end of the
over the studs of the bottom brackets.
Thread cable over front sheave,
around spring sheave and attach end
cable lacer. cable lacer.
to
cable lacer. Attach cable lacer
cable lacer. cable lacer.
with "S" hook in a convenient hole in
horizontal track angle, keeping equal
tension on both springs, so that door
hangs level. Once cable is installed,
remove prop and lower door.
"S" hooks "S" hooks
"S" hooks to both
"S" hooks "S" hooks
sheave sheave
sheave and
sheave sheave
spring clevis spring clevis
spring clevis to
spring clevis spring clevis
keyed cablekeyed cable
keyed cable
keyed cablekeyed cable
springs.springs.
springs.
springs.springs.
Roll-Up-DoorRoll-Up-Door
Roll-Up-Door
Roll-Up-DoorRoll-Up-Door
CHECKCHECK
CHECK
CHECKCHECK
Be sure that the lift cables do not rub and/or the rollers do not
bind in the track when door is opened or closed. Recheck the
springs to be sure that there is equal tension on both springs. This
is extremely important for proper door operation.
ADJUSTADJUST
ADJUST
ADJUSTADJUST
Springs by changing location of "S" hooks to another hole on
support angle of the horizontal track.
STEP
11
1
11
33
3Adjust vertical tracks so rollers seat
33
in "U" of track and bottom rollers fit
snug against bottom brackets, but
not too tight, so rollers will operate
freely. When complete, tighten all
track bolts.
44
4Adjust striker plates for proper en-
44
gagement with the latches. Adjust
the top fixture up or down and tighten
the screws to hold the third door panel
against the lintel.
NOTENOTE
NOTE
NOTENOTE
Recheck all door fasteners and
hardware to be sure that each
fastener is tight and secure.
STEP
22
2
22
45
Page 46
Step 34Step 34
Step 34
Step 34Step 34
BW46
● Parts Needed For ●
FF
rr
ont Door Jont Door J
F
r
ont Door J
FF
rr
ont Door Jont Door J
ambs ambs
ambs
ambs ambs
All SizAll Siz
All Siz
All SizAll Siz
eses
es
eses
●●
7830 Right Door Jamb (1) 7830 Right Door Jamb (1)
●
7830 Right Door Jamb (1)
●●
7830 Right Door Jamb (1) 7830 Right Door Jamb (1)
●●
7829 Left Door Jamb (1) 7829 Left Door Jamb (1)
●
7829 Left Door Jamb (1)
●●
7829 Left Door Jamb (1) 7829 Left Door Jamb (1)
11
1Position
11
to right and left track supports with
notched end on top, facing inside
building.
22
2Fasten long flange to track support
22
and short flange to front wall panel
using screws and washers.
right right
right and
right right
STEP
11
1
11
left door jambsleft door jambs
left door jambs
left door jambsleft door jambs
46
STEP
22
2
22
Page 47
SprSpr
Spr
Step 35Step 35
Step 35
Step 35Step 35
BW47
11
1After door has been completely in-
11
stalled, raise door to a full open position. Remove nut from bolt holding
the horizontal track to the spring support bracket, but do not remove bolt.
SprSpr
ing Restring Restr
ing Restr
ing Restring Restr
aint Caaint Ca
aint Ca
aint Caaint Ca
bb
b
bb
le le
All SizAll Siz
le
All Siz
le le
All SizAll Siz
eses
es
eses
22
2Slip keyed end of
22
cable cable
cable over shaft of bolt. Replace nut
cable cable
and tighten securely.
33
3Thread spring restraint cable
33
through spring, making sure cable
goes through spring loops on each
end of spring. Fasten to hole shown
on angle of the horizontal track using
a #10-32x3/8" bolt and square nut
through keyed end of cable.
44
4Repeat above installation proce-
44
dure for the other spring.
This spring restraint cable has been
manufactured in accordance with require-
ments of the California Department of
Housing and Community Development.
spring restraintspring restraint
spring restraint
spring restraintspring restraint
NOTENOTE
NOTE
NOTENOTE
STEP
33
3
33
STEP
11
1
11
STEP
22
2
22
47
Page 48
VT1210VT1210
VT1210
VT1210VT1210
VT1217VT1217
VT1217
VT1217VT1217
VT1224VT1224
VT1224
VT1224VT1224
VT1231VT1231
VT1231
VT1231VT1231
697.68887697.68887
697.68887
697.68887697.68887
BW48
SOME FACTS ABOUT RUSTSOME FACTS ABOUT RUST
SOME FACTS ABOUT RUST
SOME FACTS ABOUT RUSTSOME FACTS ABOUT RUST
Rusting is a natural oxidizing process that occurs
when bare metal is exposed to moisture. Problem
areas include screw holes, unfinished edges, or
where scrapes and nicks occur in the protective
coating through normal assembly, handling and
use. Identifying these natural rusting problem areas
and taking some simple rust protection precautions
can help to stop rust from developing, or stop it
quickly as soon as it appears.
697.68888697.68888
697.68888
697.68888697.68888
1. Avoid nicking or scraping the coating surface,
inside and out.
2. Use all the washers supplied. In addition to protecting against weather infiltration, the washers protect the metal from being scraped by the screws.
3. Keep roof, base perimeter and door tracks free of
debris and leaves which may accumulate and retain
moisture. These can do double damage since they
give off acid as they decay.
4. Touch up scrapes or nicks and any area of visible
rust as soon as possible. Make sure the surface is
free of moisture, oils, dirt or grime and then apply an
even film of high quality touch-up paint.
704880801
Loading...
+ hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.