Arrow Storage Products 697.68888, VT1231, 697.68887, VT1210, Arrow Storage Building User Manual

...
Owner's ManOwner's Man
Owner's Man
Owner's ManOwner's Man
BW1
ual & ual &
ual &
ual & ual &
AssembAssemb
Assemb
AssembAssemb
ll
y Instry Instr
l
y Instr
ll
y Instry Instr
uctionsuctions
uctions
uctionsuctions
Model No.Model No.
Model No.
Model No.Model No.
VT1210VT1210
VT1210
VT1210VT1210 VT1231VT1231
VT1231
VT1231VT1231
VT1217VT1217
VT1217
VT1217VT1217
697.68887 697.68887
697.68887
697.68887 697.68887
VT1224VT1224
VT1224
VT1224VT1224
697.68888 697.68888
697.68888
697.68888 697.68888
CAUTION: SOME PARTS HAVE SHARP EDGES. CARECAUTION: SOME PARTS HAVE SHARP EDGES. CARE
CAUTION: SOME PARTS HAVE SHARP EDGES. CARE
CAUTION: SOME PARTS HAVE SHARP EDGES. CARECAUTION: SOME PARTS HAVE SHARP EDGES. CARE MUST BE TAKEN WHEN HANDLING THE VARIOUS PIECESMUST BE TAKEN WHEN HANDLING THE VARIOUS PIECES
MUST BE TAKEN WHEN HANDLING THE VARIOUS PIECES
MUST BE TAKEN WHEN HANDLING THE VARIOUS PIECESMUST BE TAKEN WHEN HANDLING THE VARIOUS PIECES TO AVOID A MISHAP. FOR SAFETY SAKE, PLEASE READTO AVOID A MISHAP. FOR SAFETY SAKE, PLEASE READ
704880801
BUILDING DIMENSIONSBUILDING DIMENSIONS
BUILDING DIMENSIONS
BUILDING DIMENSIONSBUILDING DIMENSIONS
*Approx. Foundation Storage Area (Roof Edge to Roof Edge) (Wall to Wall) *Approx. Foundation Storage Area (Roof Edge to Roof Edge) (Wall to Wall)
*Approx. Foundation Storage Area (Roof Edge to Roof Edge) (Wall to Wall)
*Approx. Foundation Storage Area (Roof Edge to Roof Edge) (Wall to Wall) *Approx. Foundation Storage Area (Roof Edge to Roof Edge) (Wall to Wall)
Size Size Sq. Ft. Cu. Ft. Width Depth Height Width Depth Height Size Size Sq. Ft. Cu. Ft. Width Depth Height Width Depth Height
Size Size Sq. Ft. Cu. Ft. Width Depth Height Width Depth Height
Size Size Sq. Ft. Cu. Ft. Width Depth Height Width Depth Height Size Size Sq. Ft. Cu. Ft. Width Depth Height Width Depth Height
12' x 10' 141 1/8" x 111 3/4" 110 801 146 1/8" 117" 103 1/4" 141 1/8" 111 3/4" 102" 12' x 17' 141 1/8" x 198" 194 1419 146 1/8" 203 1/4" 103 1/4" 141 1/8" 198" 102" 12' x 24' 141 1/8" x 284 1/4" 278 2037 146 1/8" 289 1/2" 103 1/4" 141 1/8" 284 1/4" 102" 12' x 31' 141 1/8" x 370 1/2" 362 2655 146 1/8" 375 3/4" 103 1/4" 141 1/8" 370 1/2" 102"
3,7m x 3,1m 3,58m x 2,84m 10,2m 22,7m 3,71m 2,97m 2,62m 3,58m 2,84m 2,59m 3,7m x 5,2m 3,58m x 5,03m 18,0m 40,2m 3,71m 5,16m 2,62m 3,58m 5,03m 2,59m 3,7m x 7,3m 3,58m x 7,22m 25,8m 57,7m 3,71m 7,35m 2,62m 3,58m 7,22m 2,59m 3,7m x 9,5m 3,58m x 9,41m 33,6m 75,2m 3,71m 9,54m 2,62m 3,58m 9,41m 2,59m
* Size rounded off to the nearest foot
Exterior Dimensions Interior Dimensions Exterior Dimensions Interior Dimensions
Exterior Dimensions Interior Dimensions
Exterior Dimensions Interior Dimensions Exterior Dimensions Interior Dimensions
2 2
2 2
3 3
3 3
TO AVOID A MISHAP. FOR SAFETY SAKE, PLEASE READTO AVOID A MISHAP. FOR SAFETY SAKE, PLEASE READ SAFETY INFORMATION PROVIDED IN THIS MANUALSAFETY INFORMATION PROVIDED IN THIS MANUAL
SAFETY INFORMATION PROVIDED IN THIS MANUAL
SAFETY INFORMATION PROVIDED IN THIS MANUALSAFETY INFORMATION PROVIDED IN THIS MANUAL BEFORE BEGINNING CONSTRUCTION. WEAR GLOVESBEFORE BEGINNING CONSTRUCTION. WEAR GLOVES
BEFORE BEGINNING CONSTRUCTION. WEAR GLOVES
BEFORE BEGINNING CONSTRUCTION. WEAR GLOVESBEFORE BEGINNING CONSTRUCTION. WEAR GLOVES WHEN HANDLING METAL PARTS.WHEN HANDLING METAL PARTS.
WHEN HANDLING METAL PARTS.
WHEN HANDLING METAL PARTS.WHEN HANDLING METAL PARTS.
BEFORE BEFORE
BEFORE
BEFORE BEFORE
A2
Owner's ManualOwner's Manual
Owner's Manual
Owner's ManualOwner's Manual
Before beginning construction, check local building codes regarding footings, location and other requirements. Study and understand this owner's manual. Important information and helpful tips will make your construction easier and more enjoyable.
Assembly Instructions:Assembly Instructions:
Assembly Instructions: Instructions are supplied in this manual and contain all
Assembly Instructions:Assembly Instructions:
appropriate information for your building model. Review all instructions before you begin, and during assembly, follow the step sequence carefully for correct results.
FF
oundaounda
F
ounda
FF
oundaounda
tion and tion and
tion and
tion and tion and
AncAnc
Anc
AncAnc
horhor
ing:ing:
hor
ing: Your storage building must be anchored to pre vent wind
horhor
ing:ing:
YY
OU BEGINOU BEGIN
Y
OU BEGIN
YY
OU BEGINOU BEGIN
........
....
........
damage. A foundation is also necessary as a base in order to construct a square and level building. Anchoring and foundation materials are not included with your building. We recommend the combined use of an
AncAnc
horing Kithoring Kit
Anc
horing Kit as an effective method of secur ing your building to the ground (Available
AncAnc
horing Kithoring Kit
by mail order or at your local dealer) or you may construct the foundation and anchoring system of your choice. Your assembly instructions provide infor mation on a few methods commonly used to secure and level a storage building.
PP
arar
ts and Pts and P
P
ar
ts and P
PP
arar
ts and Pts and P
building.
•All part numbers can be found on the parts. All of these numbers (before the -) must agree with the numbers on the parts list. The parts list is located on page 12.
•If you find that a part is missing, include the model number of your building and contact:
Arrow Group Industries, Inc. Customer Service DepartmentArrow Group Industries, Inc. Customer Service Department
Arrow Group Industries, Inc. Customer Service Department
Arrow Group Industries, Inc. Customer Service DepartmentArrow Group Industries, Inc. Customer Service Department Route 50 East Breese, Illinois 62230Route 50 East Breese, Illinois 62230
Route 50 East Breese, Illinois 62230
Route 50 East Breese, Illinois 62230Route 50 East Breese, Illinois 62230
arar
ts List:ts List:
ar
ts List: Check to be sure that y ou have all the necessary parts for your
arar
ts List:ts List:
Arrow Floor Foundation Kit Arrow Floor Foundation Kit
Arrow Floor Foundation Kit and an
Arrow Floor Foundation Kit Arrow Floor Foundation Kit
Arrow Arrow
Arrow
Arrow Arrow
1-800-851-10851-800-851-1085
1-800-851-1085
1-800-851-10851-800-851-1085
•Separate contents of the carton by the part number while reviewing parts list. The first few steps show how to join related parts to make larger sub assemblies which will be used later.
•Familiarize yourself with the hardware and fasteners for easier use during construction. These are packaged within the carton. Note that extra fasteners have been supplied for your convenience.
2
PLAN PLAN
PLAN
PLAN PLAN
A3
WW
aa
tctc
W
WW
Do not attempt to assemble your building on a windy day. Be careful on wet or muddy ground.
TT
T
TT
your building. One person can position parts or panels while the other is able to handle the fasteners and the tools.
TT
T
TT
construction of your building. Decide which method of anchoring and the type of foundation you wish to use in order to form a complete list of the mater ials you will need.
h the h the
a
tc
h the
aa
tctc
h the h the
eamweamw
eamw
eamweamw
ools and Maools and Ma
ools and Ma
ools and Maools and Ma
oror
or
oror
WW
eaea
ther:ther:
ea
ther:
eaea
ther:ther:
Whenever possible, two or more people should work together to assemble
terter
ter
terter
k:k:
k:
k:k:
W
WW
Be sure the day you select to install y our building is dry and calm.
ials:ials:
ials:
ials:ials:
These are some basic tools and materials you will need for the
AHEADAHEAD
AHEAD
AHEADAHEAD
........
....
........
Required
• Eye Goggles
• No. 2 Phillips Screwdriver
(With Hardened Magnetic Tip) Note: A power screwdriver or vari­able speed drill with Phillips-tip at­tachment can speed assembly by as much as 40%.
Selecting and PrSelecting and Pr
Selecting and Pr
Selecting and PrSelecting and Pr
a location for your building. The best location is a level area with good drainage.
•Allow enough working space for ease of moving parts into position during assembly. Be sure there will be enough space at entrance for doors to open fully and enough space around the building to be able to fasten the panel screws from the outside.
•Before you begin the first steps in assembling your parts, a foundation should be constructed and an anchoring system should be ready to use.
• Work Gloves
• Step Ladder
• Utility Knife / Scissors
• Pliers
• Carpenter's Level
• Tape Measure
ee
parpar
e
par
ee
parpar
Required
ing ing
ing
ing ing
YY
our Site:our Site:
Y
our Site:
YY
our Site:our Site:
Optional Time-Savers
• Wrench / Nut Driver
• Electric / Cordless Drill
• Square
• String (for squaring frame)
Before assembly, you will want to decide on
Foundation Preparation
• Hammer and Nails
• Spade or Shovel
• Hand Saw / Power Saw
• Lumber and/or Concrete
3
SAFETY FIRSTSAFETY FIRST
SAFETY FIRST
SAFETY FIRSTSAFETY FIRST
A4
Safety precautions are important to follow throughout the construction of your building.Safety precautions are important to follow throughout the construction of your building.
Safety precautions are important to follow throughout the construction of your building.
Safety precautions are important to follow throughout the construction of your building.Safety precautions are important to follow throughout the construction of your building.
........
....
........
•Care must be taken when handling various pieces of your building since some contain sharp edges. Please wear work gloves, eye protection and long sleeves when assembling or performing any maintenance on your build­ing.
safety edge
sharp edge
sharp edge
safety edge
•Keep children and pets away from worksite to avoid distractions and any accidents which may occur.
•Practice caution with the tools being used in the assembly of this building. Be familiar with the operation of all power tools.
•Do not attempt to assemble the building if parts are missing because any building left partially assembled may be seriously damaged by light winds. Call 1-800-851-1085
•Never concentrate your total weight on the roof of the building. When using a step ladder make sure that it is fully open and on even ground before climbing on it.
4
•Do not attempt to assemble the building on a windy day, because the large panels acting as a "sail", can be whipped about by the wind making construction difficult and unsafe.
CARE & MAINTENCARE & MAINTEN
CARE & MAINTEN
CARE & MAINTENCARE & MAINTEN
A5 Web
FF
inish:inish:
F
inish: For long lasting finish, periodically clean and wax the exterior surface. Touch-
FF
inish:inish:
up scratches as soon as you notice them on your unit. Immediately clean the area with a wire brush; wash it and apply touch-up paint per manufacturer's recommendation.
ANCE....ANCE....
ANCE....
ANCE....ANCE....
Roof:Roof:
Roof:
Roof:Roof:
amounts of snow on roof can damage building making it unsafe to enter. In snow country, Roof Strengthening Kits are available for most Arrow Buildings for added protection against heavy snow accumulation.
DoorDoor
Door
DoorDoor
sliding easily. Lubricate door track annually with furniture polish or silicone spray. Keep doors closed and locked to prevent wind damage.
FF
astenerastener
F
astener
FF
astenerastener
the metal from being scratched by scre ws. Regularly check your b uilding f or loose scre ws, bolts, nuts, etc. and retighten them as necessary.
Moisture: Moisture:
Moisture: A plastic sheet (vapor barrier) placed under the entire floor area with good
Moisture: Moisture:
ventilation will reduce condensation.
Other Other
Other
Other Other
Keep roof clear of leaves and snow with long handled, soft-bristled broom. Heavy
s:s:
s:
Always keep the door trac ks clear of dirt and other debris that prevent them from
s:s:
s:s:
s:
Use all washers supplied to protect against weather infiltration and to protect
s:s:
TT
ips....ips....
T
ips....
TT
ips....ips....
• Wash off inked part numbers on coated panels with soap and water.
• Silicone caulking may be used for watertight seals throughout the building.
Do not store swimming pool chemicals in your building. Combustibles andDo not store swimming pool chemicals in your building. Combustibles and
Do not store swimming pool chemicals in your building. Combustibles and
Do not store swimming pool chemicals in your building. Combustibles andDo not store swimming pool chemicals in your building. Combustibles and corrosives must be stored in air tight approved containers.corrosives must be stored in air tight approved containers.
corrosives must be stored in air tight approved containers.
corrosives must be stored in air tight approved containers.corrosives must be stored in air tight approved containers.
Keep this Owner's Manual and Assembly Instructions for future reference.Keep this Owner's Manual and Assembly Instructions for future reference.
Keep this Owner's Manual and Assembly Instructions for future reference.
Keep this Owner's Manual and Assembly Instructions for future reference.Keep this Owner's Manual and Assembly Instructions for future reference.
5
AA
CCESSORIESCCESSORIES
A
CCESSORIES
AA
CCESSORIESCCESSORIES
A6 WEB
RR
OOF STRENGTHENING (heaOOF STRENGTHENING (hea
R
OOF STRENGTHENING (hea
RR
OOF STRENGTHENING (heaOOF STRENGTHENING (hea
designed for added protection against heavy snow accumulation. Increases the strength of your roof by 50%.
ANCHOR KITANCHOR KIT
ANCHOR KIT
ANCHOR KITANCHOR KIT
Model No. AK4Model No. AK4
Model No. AK4
Model No. AK4Model No. AK4
Anchor Kit contains heavy-duty steel augers, 60' (18m) of steel cable and 4 cable clamps. No digging or concrete pouring, just insert cable under roof, over roof beams, into augers and twist augers into the ground. For buildings
larger than 10'x9', use 2 kits.
vy snovy sno
vy sno
vy snovy sno
w load) KITSw load) KITS
w load) KITS Extra roof beams and gable braces
w load) KITSw load) KITS
ANCHOR KITANCHOR KIT
ANCHOR KIT
ANCHOR KITANCHOR KIT
Model No. AK100Model No. AK100
Model No. AK100
Model No. AK100Model No. AK100
New concrete anchor system permits anchoring any size Arrow building directly to a concrete slab. Each kit contains heavy-duty, hot-dipped galvanized steel corner gussets and perimeter clips which fit over the floor frame and lag bolt into a concrete slab. Full assembly instructions and a 1/4" masonary drill bit are included.
........
....
........
FLOOR FOUNDFLOOR FOUND
FLOOR FOUND
FLOOR FOUNDFLOOR FOUND
MODELS FB47410, FB5465, FB106-A
FB109-A, FB1010 AND FB1014-A
A simple new floor frame system made of heavy-duty, hot-dipped galvanized steel. Use as foundation for plywood, sand or stone.
TT
OOL HANGING RAOOL HANGING RA
T
OOL HANGING RA
TT
OOL HANGING RAOOL HANGING RA
Model No. TH100Model No. TH100
Model No. TH100
Model No. TH100Model No. TH100
The perfect tool organizer. Twin 25 1/2" (65cm) steel channels plus five heavy-duty snap-in hangers and a small tool holder for screwdrivers, pliers, etc. Holders slide along channel for fully adjustable spacing. Great for garage, basement, or the back of any door. Fits all Arrow storage buildings.
6
AA
TION KITSTION KITS
A
TION KITS
AA
TION KITSTION KITS
CKCK
CK
CKCK
AA
TTIC KIT / TTIC KIT /
A
TTIC KIT /
AA
TTIC KIT / TTIC KIT /
Heavy-duty galvanized steel bars that fit all 10' wide Arrow buildings. They install quickly and easily to help organize space and create more useable space as an attic or workbench. Will hold up to 250 lbs. (113kg) evenly distributed.
Model No.Model No.
Model No.
Model No.Model No.
Must be drilled for use as workbench in Estator. + Even weight distribution.
SHELF UNITSSHELF UNITS
SHELF UNITS
SHELF UNITSSHELF UNITS
Heavy-duty, galvanized steel shelf units help organize storage space. They easily mount on the wall or sit on the floor. Fits all Arrow buildings.*
Model No. SS404
• Makes 8" to 12" (20-30cm) wide shelves in any length.
• Brackets, braces, hardware included. Lumber is not included.
* Some drilling required to fit buildings without mid-wall bracing.
WW
ORKBENCH KITORKBENCH KIT
W
ORKBENCH KIT
WW
ORKBENCH KITORKBENCH KIT
FitsFits
Fits
FitsFits
10' Long, 250 lb. (113kg) load+
Fits all Arrow 10' wide buildings.
Model No. SS900-A
• Grey color
• 3 shelves
• Holds up to 85 lbs. (38kg) (even weight distribution)
Shipping WeightShipping Weight
Shipping Weight
Shipping WeightShipping Weight
16 lbs. (7kg)AT101
THIS
PAGE
WAS
LEFT
BLANK
INTENTIONALLY
7
THIS
PAGE
WAS
LEFT
BLANK
INTENTIONALLY
8
FF
oundaounda
F
ounda
FF
oundaounda
BW9
TT
he Fhe F
T
he F
TT
he Fhe F
Concrete SlabConcrete Slab
Concrete Slab
Concrete SlabConcrete Slab
The slab should be at least 3" to 4" (8-10cm) thick. It must be level and flat to provide good support for the frame.The slab should be at least 3" to 4" (8-10cm) thick. It must be level and flat to provide good support for the frame.
The slab should be at least 3" to 4" (8-10cm) thick. It must be level and flat to provide good support for the frame.
The slab should be at least 3" to 4" (8-10cm) thick. It must be level and flat to provide good support for the frame.The slab should be at least 3" to 4" (8-10cm) thick. It must be level and flat to provide good support for the frame. The following are the recommended materials for your foundation.The following are the recommended materials for your foundation.
The following are the recommended materials for your foundation.
The following are the recommended materials for your foundation.The following are the recommended materials for your foundation.
2 x 4's (5cm x 10cm) (will be removed once the concrete cures)
Concrete ● Sheet of 6 mil plastic
We recommend for a proper strength concrete to use a mix of: 1 part cement 3 parts pea sized gravel 2 1/2 parts clean sand
Prepare the Site/Construct a FoundationPrepare the Site/Construct a Foundation
Prepare the Site/Construct a Foundation
Prepare the Site/Construct a FoundationPrepare the Site/Construct a Foundation
1. Dig a square, 6" (15cm) deep into the ground (remove grass).
2. Fill up to 4" (10cm) in the square with gravel and tamp firm.
3. Cover gravel with a sheet of 6 mil plastic.
4. Construct a wood frame using four planks of 2x4 (5cm x 10cm) lumber.
5. Pour in concrete to fill in the hole and the frame giving a total of 4" (8-10cm) thick concrete. Be sure surface is level.
oundaounda
ounda
oundaounda
tion Ftion F
tion F
tion Ftion F
or or
or
or or
YY
our Buildingour Building
Y
our Building
YY
our Buildingour Building
tiontion
tion
tiontion
Allow 3 - 5 hours for construction and a week for concrete curing time.Allow 3 - 5 hours for construction and a week for concrete curing time.
Allow 3 - 5 hours for construction and a week for concrete curing time.
Allow 3 - 5 hours for construction and a week for concrete curing time.Allow 3 - 5 hours for construction and a week for concrete curing time.
Note: Before beginning construction, check local building codesNote: Before beginning construction, check local building codes
Note: Before beginning construction, check local building codes
Note: Before beginning construction, check local building codesNote: Before beginning construction, check local building codes
regarding footings, location and other requirements.regarding footings, location and other requirements.
regarding footings, location and other requirements.
regarding footings, location and other requirements.regarding footings, location and other requirements.
Welded Wire
Fabric
Reinforcing
Rods
Optional Footer Type of FoundationOptional Footer Type of Foundation
Optional Footer Type of Foundation
Optional Footer Type of FoundationOptional Footer Type of Foundation
141 1/8"141 1/8"
141 1/8"
FRONT (ROLL-UP DOOR)FRONT (ROLL-UP DOOR)
FRONT (ROLL-UP DOOR)
FRONT (ROLL-UP DOOR)FRONT (ROLL-UP DOOR)
141 1/8"141 1/8"
3,58m3,58m
3,58m
3,58m3,58m
10' - 111 3/4"10' - 111 3/4"
10' - 111 3/4"
10' - 111 3/4"10' - 111 3/4"
17' - 198"17' - 198"
17' - 198"
17' - 198"17' - 198"
24' - 284 1/4"24' - 284 1/4"
24' - 284 1/4"
24' - 284 1/4"24' - 284 1/4"
31' - 370 1/2"31' - 370 1/2"
31' - 370 1/2"
31' - 370 1/2"31' - 370 1/2"
2,84m2,84m
2,84m
2,84m2,84m
5,03m5,03m
5,03m
5,03m5,03m
7,22m7,22m
7,22m
7,22m7,22m
9,41m9,41m
9,41m
9,41m9,41m
Reinforcing
Rods
Note: Note:
Note: Finished Slab dimensions, with lumber removed.
Note: Note:
9
AnchoringAnchoring
Anchoring
AnchoringAnchoring
A10
AncAnc
Anc
AncAnc
It is important that the entire floor frame be anchored after the building is erected.It is important that the entire floor frame be anchored after the building is erected.
It is important that the entire floor frame be anchored after the building is erected.
It is important that the entire floor frame be anchored after the building is erected.It is important that the entire floor frame be anchored after the building is erected.
Below are recommended ways of anchoring.
Arrow Anchoring Kit:Arrow Anchoring Kit:
Arrow Anchoring Kit:
Arrow Anchoring Kit:Arrow Anchoring Kit:
Recommended for use with
Contains: Contains:
Contains: 4 Anchors with Cable, Clamps and
Contains: Contains:
installation instruction.
horhor
hor
horhor
ing Doing Do
ing Do
ing Doing Do
wn wn
TT
wn
T
wn wn
TT
(Model No. AK4 or 60298)
any any
any suggested
any any
he Buildinghe Building
he Building
he Buildinghe Building
base.base.
base.
base.base.
Anchoring into Wood/Post:Anchoring into Wood/Post:
Anchoring into Wood/Post:
Anchoring into Wood/Post:Anchoring into Wood/Post:
Use 1/4" Wood Screws. There are 1/4" (0,63cm) dia. holes provided in the frames for proper anchoring.
1. 2.
OVER THE BEAMS
AND INTO THE GROUND
Arrow Anchoring Kit:Arrow Anchoring Kit:
Arrow Anchoring Kit:
Arrow Anchoring Kit:Arrow Anchoring Kit:
Recommended for use with the
Contains: Contains:
Contains: Corner gussets, perimeter clips, hardware,
Contains: Contains:
1/4" masonary drill bit and installation instruction.
(Model No. AK100 or 68383)
concrete concrete
concrete foundation.
concrete concrete
Anchoring into Concrete:Anchoring into Concrete:
Anchoring into Concrete:
Anchoring into Concrete:Anchoring into Concrete:
1. For poured concrete slab or footing or patio blocks: Use 1/4" x 2" Lag Screws.
2. For Anchor Post of Concrete poured after building is erected: Use 1/4" x 6" Lag Screws.
1.
2.
10
BW11
6500465004
65004
6500465004
#8Ax5/16" Screw (403)#8Ax5/16" Screw (403)
#8Ax5/16" Screw (403)
#8Ax5/16" Screw (403)#8Ax5/16" Screw (403)
(190) (Carton 4)(190) (Carton 4)
(190) (Carton 4)
(190) (Carton 4)(190) (Carton 4)
HarHar
Har
HarHar
dd
d
dd
6510165101
65101
6510165101
1/4-20 Square Nut (10)1/4-20 Square Nut (10)
1/4-20 Square Nut (10)
1/4-20 Square Nut (10)1/4-20 Square Nut (10)
(Packed with Screws)(Packed with Screws)
(Packed with Screws)
(Packed with Screws)(Packed with Screws)
ww
w
ww
arar
ar
arar
e fe f
or Buildingor Building
e f
or Building
e fe f
or Buildingor Building
6510665106
65106
6510665106
#10-32 Square Nut (200)#10-32 Square Nut (200)
#10-32 Square Nut (200)
#10-32 Square Nut (200)#10-32 Square Nut (200)
(184) (Carton 4)(184) (Carton 4)
(184) (Carton 4)
(184) (Carton 4)(184) (Carton 4)
Remove from bag of screwsRemove from bag of screws
Remove from bag of screws
Remove from bag of screwsRemove from bag of screws
and save for the Step 28and save for the Step 28
and save for the Step 28
and save for the Step 28and save for the Step 28
6594365943
65943
6594365943
#10-32x7/16" Bolt (194)#10-32x7/16" Bolt (194)
#10-32x7/16" Bolt (194)
#10-32x7/16" Bolt (194)#10-32x7/16" Bolt (194)
(184) (Carton 4)(184) (Carton 4)
(184) (Carton 4)
(184) (Carton 4)(184) (Carton 4)
6598965989
65989
6598965989
1/4-20x1/2" Hex Head Bolt (10)1/4-20x1/2" Hex Head Bolt (10)
1/4-20x1/2" Hex Head Bolt (10)
1/4-20x1/2" Hex Head Bolt (10)1/4-20x1/2" Hex Head Bolt (10)
(Packed with Screws)(Packed with Screws)
(Packed with Screws)
(Packed with Screws)(Packed with Screws)
6664666646
66646
6664666646
Washer (600)Washer (600)
Washer (600)
Washer (600)Washer (600)
(320) (Carton 4)(320) (Carton 4)
(320) (Carton 4)
(320) (Carton 4)(320) (Carton 4)
79727972
7972
79727972
Door Handle Lock Bracket (1)Door Handle Lock Bracket (1)
Door Handle Lock Bracket (1)
Door Handle Lock Bracket (1)Door Handle Lock Bracket (1)
6540865408
65408
6540865408
#10-32x1/4" Bolts (4)#10-32x1/4" Bolts (4)
#10-32x1/4" Bolts (4)
#10-32x1/4" Bolts (4)#10-32x1/4" Bolts (4)
6644466444
66444
6644466444
Roof Trim CapRoof Trim Cap
Roof Trim Cap
Roof Trim CapRoof Trim Cap
(2 right & 2 left)(2 right & 2 left)
(2 right & 2 left)
(2 right & 2 left)(2 right & 2 left)
67545 21'67545 21'
67545 21'
67545 21'67545 21'
Weather Stripping (1)Weather Stripping (1)
Weather Stripping (1)
Weather Stripping (1)Weather Stripping (1)
65900A65900A
65900A
65900A65900A
#10Bx1/2" Black Screw (2)#10Bx1/2" Black Screw (2)
#10Bx1/2" Black Screw (2)
#10Bx1/2" Black Screw (2)#10Bx1/2" Black Screw (2)
(Packed with Screws)(Packed with Screws)
(Packed with Screws)
(Packed with Screws)(Packed with Screws)
66446 (Arrow Logo)66446 (Arrow Logo)
66446 (Arrow Logo)
66446 (Arrow Logo)66446 (Arrow Logo)
Peak Cap (2)Peak Cap (2)
Peak Cap (2)
Peak Cap (2)Peak Cap (2)
67293 10'67293 10'
67293 10'
67293 10'67293 10'
Weather Stripping (1)Weather Stripping (1)
Weather Stripping (1)
Weather Stripping (1)Weather Stripping (1)
(Carton 4)(Carton 4)
(Carton 4)
(Carton 4)(Carton 4)
6591465914
65914
6591465914
#6Ax7/8"Screw (5)#6Ax7/8"Screw (5)
#6Ax7/8"Screw (5)
#6Ax7/8"Screw (5)#6Ax7/8"Screw (5)
(Packed with Screws)(Packed with Screws)
(Packed with Screws)
(Packed with Screws)(Packed with Screws)
66610 (No Slot)66610 (No Slot)
66610 (No Slot)
66610 (No Slot)66610 (No Slot)
#10-32x7/16" Bolt (2)#10-32x7/16" Bolt (2)
#10-32x7/16" Bolt (2)
#10-32x7/16" Bolt (2)#10-32x7/16" Bolt (2)
6626566265
66265
6626566265
Edge Trim (4)Edge Trim (4)
Edge Trim (4)
Edge Trim (4)Edge Trim (4)
(Carton 4)(Carton 4)
(Carton 4)
(Carton 4)(Carton 4)
6609866098
66098
6609866098
Plastic Spacer (5)Plastic Spacer (5)
Plastic Spacer (5)
Plastic Spacer (5)Plastic Spacer (5)
6624266242
66242
6624266242
Door Slide (2)Door Slide (2)
Door Slide (2)
Door Slide (2)Door Slide (2)
6626066260
66260
6626066260
Handle (2)Handle (2)
Handle (2)
Handle (2)Handle (2)
6638266382
66382
6638266382
Lower Door Guide (2)Lower Door Guide (2)
Lower Door Guide (2)
Lower Door Guide (2)Lower Door Guide (2)
11
Parts ListParts List
Parts List
BW12
Carton #4 of the VT1217 can be deleted for a complete 12'x10' building, or more than one carton #4 may be used to extend depth in multiples of 7'.
Assembly Part Part Key No. Number Description Carton 1 Carton 2 Carton 3 Carton 4
1 7855 Truss Lower Chord 2 2 7856 Truss Upper Chord 2 3 6382 Center Gable Brace 2 8 4 7739 Truss Diagonal 4 5 6381 Mid Gable Brace 4 4 6 6380 Outer Gable Brace 4 4 7 7738 Splice Plate 1 8 7834 Right Front Frame 3 9 7837 Side Frame 4 10 7914 Side Frame 4 11 8532 Right Rear Frame 3 12 8531 Left Rear Frame 3 13 7835 Left Front Frame 3 14 7857 Truss Support 2 2 15 7824 Corner Wall Panel 4 16 7825 Front Wall Panel 2 17 7822 Main Wall Panel 7 6 18 6228 Frame Support 4 19 7917 Truss Column 2 20 7839 Front Column 2 21 7831 Lintel 1 22 7915 Side Top Angle 2 23 7838 Side Top Angle 2 24 7823 Medium Wall Panel 1 25 7833 Roof Beam 6 26 7912 Roof Beam 6 27 7942 Right Gable 2 28 7943 Left Gable 2 29 7840 Right Track Support 1 30 7841 Left Track Support 1 31 6372 Gable Strut 2 2 32 7827 Left Roof Panel 2 33 7826 Right Roof Panel 2 34 7828 Middle Roof Panel 4 6 35 7843 Ridge Cap 1 1 36 6874 Ridge Cap 1 37 5220 Side Roof Trim 2 2 38 6014 Side Roof Trim 2 39 7845 Left Rake 2 40 7846 Right Rake 2 41 7913 Spring Support Bracket 2 42 7830 Right Door Jamb 1 43 7829 Left Door Jamb 1 44 7517 Lower Door Track 1 45 7560 Ramp 1 46 7950 Side Wall Channel 1 47 7949 Side Wall Channel 1 48 7951 Support Column 1 49 7958 Door Track 1 50 7946 Door Jamb 2 51 7948 Door Wall Brace 1 52 7945 Door 1 53 3719 Door Handle Brace 1 54 7947 Vertical Door Brace 1 55 6264 Horizontal Door Brace 2 56 8530 Splice Channel 1 57 9286 Door Panel (Bottom) 1 58 7808 Bottom Angle 1 59 8198 Vinyl Weatherstrip 1 60 7848 Door Panel (Lock) 1 61 67510 Right Vertical Track 1 62 67509 Left Vertical Track 1 63 67476 Right Horizontal Tack 1 64 67475 Left Horizontal Track 1 65 7847 Door Panel (Top) 1
Parts ListParts List
12
BW13
AssembAssemb
Assemb
AssembAssemb
ll
y by b
l
y b
ll
y by b
y Ky K
y K
y Ky K
ee
y No.y No.
e
y No.
ee
y No.y No.
13
BW14
65101 (16)65101 (16)
65101 (16)
65101 (16)65101 (16)
1/4-20 Square Nut1/4-20 Square Nut
1/4-20 Square Nut
1/4-20 Square Nut1/4-20 Square Nut
(Packed with Screws)(Packed with Screws)
(Packed with Screws)
(Packed with Screws)(Packed with Screws)
66432 (4)66432 (4)
66432 (4)
66432 (4)66432 (4)
3/8-16x1 1/2" Hex3/8-16x1 1/2" Hex
3/8-16x1 1/2" Hex
3/8-16x1 1/2" Hex3/8-16x1 1/2" Hex
Head BoltHead Bolt
Head Bolt
Head BoltHead Bolt
HarHar
Har
HarHar
1/4-20 1 1/2" Hex1/4-20 1 1/2" Hex
1/4-20 1 1/2" Hex
1/4-20 1 1/2" Hex1/4-20 1 1/2" Hex
Head BoltHead Bolt
Head Bolt
Head BoltHead Bolt
3/8-16 Hex Nut3/8-16 Hex Nut
3/8-16 Hex Nut
3/8-16 Hex Nut3/8-16 Hex Nut
dd
ww
d
w
dd
ww
66464 (2)66464 (2)
66464 (2)
66464 (2)66464 (2)
66433 (4)66433 (4)
66433 (4)
66433 (4)66433 (4)
arar
ar
arar
e fe f
or Roll-Up-Dooror Roll-Up-Door
e f
or Roll-Up-Door
e fe f
or Roll-Up-Dooror Roll-Up-Door
65989 (6)65989 (6)
65989 (6)
65989 (6)65989 (6)
1/4-20x1/2" Hex1/4-20x1/2" Hex
1/4-20x1/2" Hex
1/4-20x1/2" Hex1/4-20x1/2" Hex
Head BoltHead Bolt
Head Bolt
Head BoltHead Bolt
(Packed with Screws)(Packed with Screws)
(Packed with Screws)
(Packed with Screws)(Packed with Screws)
66434 (2)66434 (2)
66434 (2)
66434 (2)66434 (2)
#10-32 x 2 1/2" Flat#10-32 x 2 1/2" Flat
#10-32 x 2 1/2" Flat
#10-32 x 2 1/2" Flat#10-32 x 2 1/2" Flat
Head BoltHead Bolt
Head Bolt
Head BoltHead Bolt
65106 (16)65106 (16)
65106 (16)
65106 (16)65106 (16)
#10-32 Square#10-32 Square
#10-32 Square
#10-32 Square#10-32 Square
NutNut
Nut
NutNut
65900A (38)65900A (38)
65900A (38)
65900A (38)65900A (38)
#10Bx1/2" Black#10Bx1/2" Black
#10Bx1/2" Black
#10Bx1/2" Black#10Bx1/2" Black
Truss Head ScrewTruss Head Screw
Truss Head Screw
Truss Head ScrewTruss Head Screw
(Packed with Screws)(Packed with Screws)
(Packed with Screws)
(Packed with Screws)(Packed with Screws)
66431 (8)66431 (8)
66431 (8)
66431 (8)66431 (8)
1/4-20x5/8" Rib1/4-20x5/8" Rib
1/4-20x5/8" Rib
1/4-20x5/8" Rib1/4-20x5/8" Rib
Neck BoltNeck Bolt
Neck Bolt
Neck BoltNeck Bolt
66441 (14)66441 (14)
66441 (14)
66441 (14)66441 (14)
#10-32x3/8" Bolt#10-32x3/8" Bolt
#10-32x3/8" Bolt
#10-32x3/8" Bolt#10-32x3/8" Bolt
6752567525
67525
6752567525
Inside "T" HandleInside "T" Handle
Inside "T" Handle
Inside "T" HandleInside "T" Handle
(1)(1)
(1)
(1)(1)
6750467504
67504
6750467504
Inside Latch BarInside Latch Bar
Inside Latch Bar
Inside Latch BarInside Latch Bar
Spacer (1)Spacer (1)
Spacer (1)
Spacer (1)Spacer (1)
6749167491
67491
6749167491
#2 Hinge#2 Hinge
#2 Hinge
#2 Hinge#2 Hinge
(2)(2)
(2)
(2)(2)
6748367483
67483
6748367483
Cable LacerCable Lacer
Cable Lacer
Cable LacerCable Lacer
(2)(2)
(2)
(2)(2)
6748267482
67482
6748267482
Keyed CableKeyed Cable
Keyed Cable
Keyed CableKeyed Cable
(2)(2)
(2)
(2)(2)
6749367493
67493
6749367493
Top FixtureTop Fixture
Top Fixture
Top FixtureTop Fixture
(2)(2)
(2)
(2)(2)
6750067500
67500
6750067500
SpringSpring
Spring
SpringSpring
(2)(2)
(2)
(2)(2)
6748467484
67484
6748467484
Spring ClevisSpring Clevis
Spring Clevis
Spring ClevisSpring Clevis
(2)(2)
(2)
(2)(2)
6748567485
67485
6748567485
Left BottomLeft Bottom
Left Bottom
Left BottomLeft Bottom
Bracket (1)Bracket (1)
Bracket (1)
Bracket (1)Bracket (1)
6749467494
67494
6749467494
Lift HandleLift Handle
Lift Handle
Lift HandleLift Handle
(2)(2)
(2)
(2)(2)
67528 Latch Set67528 Latch Set
67528 Latch Set
67528 Latch Set67528 Latch Set
(1) Flat Latch Bar(1) Flat Latch Bar
(1) Flat Latch Bar
(1) Flat Latch Bar(1) Flat Latch Bar
(4) "S" Hooks(4) "S" Hooks
(4) "S" Hooks
(4) "S" Hooks(4) "S" Hooks
(2) Strikers(2) Strikers
(2) Strikers
(2) Strikers(2) Strikers
(2) Spring Latches(2) Spring Latches
(2) Spring Latches
(2) Spring Latches(2) Spring Latches
(2) Latch Chains(2) Latch Chains
(2) Latch Chains
(2) Latch Chains(2) Latch Chains
6748867488
67488
6748867488
Heavy "S" HookHeavy "S" Hook
Heavy "S" Hook
Heavy "S" HookHeavy "S" Hook
(4)(4)
(4)
(4)(4)
6748667486
67486
6748667486
Right BottomRight Bottom
Right Bottom
Right BottomRight Bottom
Bracket (1)Bracket (1)
Bracket (1)
Bracket (1)Bracket (1)
6749667496
67496
6749667496
RollerRoller
Roller
RollerRoller
(8)(8)
(8)
(8)(8)
6751367513
67513
6751367513
Spring RestraintSpring Restraint
Spring Restraint
Spring RestraintSpring Restraint
Cable (2)Cable (2)
Cable (2)
Cable (2)Cable (2)
6750367503
67503
6750367503
Stile SpacerStile Spacer
Stile Spacer
Stile SpacerStile Spacer
(2)(2)
(2)
(2)(2)
6749067490
67490
6749067490
#1 Hinge#1 Hinge
#1 Hinge
#1 Hinge#1 Hinge
(4)(4)
(4)
(4)(4)
6749767497
67497
6749767497
SheaveSheave
Sheave
SheaveSheave
(4)(4)
(4)
(4)(4)
6752667526
67526
6752667526
Locking HandleLocking Handle
Locking Handle
Locking HandleLocking Handle
(1)(1)
(1)
(1)(1)
14
TT
rr
uss uss
uss
uss uss
trusstruss
truss
trusstruss
AssembAssemb
Assemb
AssembAssemb
T
r
TT
Step 1Step 1
Step 1
Step 1Step 1
BW15
1 1
1 Assemble 1/2 truss at a time, using
1 1
#10-32x7/16" bolts and square nuts, on all connections loosely.
2 2
2 Attach
2 2
upper chordupper chord
upper chord.
upper chordupper chord
3 3
3 Attach 2
3 3
the upper and lower chords at the opposite end of truss.
4 4
4 Attach 2
4 4
and lower chords.
5 5
5 Attach 2
5 5
upper and lower chords.
6 6
6 Attach 2
6 6
upper and lower chords at middle of truss.
7 7
7 Attach 2
7 7
upper and lower chords. Mount with short leg of brace.
truss lower chordtruss lower chord
truss lower chord to
truss lower chordtruss lower chord
center gable braces center gable braces
center gable braces to
center gable braces center gable braces
truss diagonalstruss diagonals
truss diagonals to upper
truss diagonalstruss diagonals
mid gable bracesmid gable braces
mid gable braces to
mid gable bracesmid gable braces
center gable bracescenter gable braces
center gable braces to
center gable bracescenter gable braces
outer gable bracesouter gable braces
outer gable braces to
outer gable bracesouter gable braces
rr
Parts Needed For ●
ll
y 12x17,y 12x17,
l
y 12x17,
ll
y 12x17,y 12x17,
ONLONL
ONL
ONLONL
6382
12x24 & 12x31 12x24 & 12x31
12x24 & 12x31
12x24 & 12x31 12x24 & 12x31
YY
Y
YY
The day before construction of the building, complete the sub­assemblies so they will be ready. EXAMPLE: Truss, floor frames, roof beams, gables, side and overhead doors. Set the assemblies aside, so they will not get damaged. The remainder of the building assembly requires more than 1 work session and more than 1 person. Do not continue beyond this point if you do not have enough time to complete the wall assembly and can tie down the assembly overnight. Complete the roof and doors on the following day.
●●
7855 Truss Lower Chord (2) 7855 Truss Lower Chord (2)
7855 Truss Lower Chord (2)
●●
7855 Truss Lower Chord (2) 7855 Truss Lower Chord (2)
●●
7856 Truss Upper Chord (2) 7856 Truss Upper Chord (2)
7856 Truss Upper Chord (2)
●●
7856 Truss Upper Chord (2) 7856 Truss Upper Chord (2)
●●
6382 Center Gable Brace (8) 6382 Center Gable Brace (8)
6382 Center Gable Brace (8)
●●
6382 Center Gable Brace (8) 6382 Center Gable Brace (8)
●●
7739 Truss Diagonal (4) 7739 Truss Diagonal (4)
7739 Truss Diagonal (4)
●●
7739 Truss Diagonal (4) 7739 Truss Diagonal (4)
●●
6381 Mid Gable Brace (4) 6381 Mid Gable Brace (4)
6381 Mid Gable Brace (4)
●●
6381 Mid Gable Brace (4) 6381 Mid Gable Brace (4)
●●
6380 Outer Gable Brace (4) 6380 Outer Gable Brace (4)
6380 Outer Gable Brace (4)
●●
6380 Outer Gable Brace (4) 6380 Outer Gable Brace (4)
●●
7738 Splice Plate (1) 7738 Splice Plate (1)
7738 Splice Plate (1)
●●
7738 Splice Plate (1) 7738 Splice Plate (1)
8 8
8 Square up 1/2 truss, adjust and
8 8
tighten.
9 9
9 Make other half and square.
9 9 10 10
10 Splice both halves together with
10 10
splice platesplice plate
splice plate and fasten center gable
splice platesplice plate
braces together, using 3 bolts and nuts.
11 11
11 Cut the 4 pieces of
11 11
half and slip over the bottom edges of gable braces. This trim is a must to protect against injury from the sharp edge. Make 1 assembly for the 12x17 Make 2 assemblies for the 12x24 Make 3 assemblies for the 12x31
NOTENOTE
NOTE
NOTENOTE
edge trim edge trim
edge trim in
edge trim edge trim
IMPORTANT:IMPORTANT:
IMPORTANT:
IMPORTANT:IMPORTANT:
Square Up Half Truss
Mounting Flange of Brackets
Must Face Towards Center
Of Truss Assembly
7738
Edge Trim
6381
7739
6380
6382
Short
Mounting
Leg
7856
#10-32 Square Nut
7855
#10-32x7/16" Bolt
15
Loading...
+ 33 hidden pages