CAUTION: SOME PARTS HAVE SHARP EDGES. CARE
MUST BE TAKEN WHEN HANDLING THE VARIOUS PIECES
712730103
BUILDING DIMENSIONS
Exterior Dimensions Interior Dimensions Door
*Approx. Foundation Storage Area (Roof Edge to Roof Edge) (Wall to Wall) Opening
Size Size Sq. Ft. Cu. Ft. Width Depth Height Width Depth Height Width Height
3,0m x 4,0m 307cm x 407cm 12,0m2 24,1m3 313cm 413cm 223cm 300cm 400cm 220cm 141cm 152cm
* Size rounded off to the nearest foot
TO AVOID A MISHAP. FOR SAFETY SAKE, PLEASE READ
SAFETY INFORMATION PROVIDED IN THIS MANUAL
BEFORE BEGINNING CONSTRUCTION. WEAR GLOVES
WHEN HANDLING METAL PARTS.
BEFORE YOU BEGIN....
A2
Owner's Manual
Before beginning construction, check local building codes regarding footings, location
and other requirements. Study and understand this owner's manual.
Important information and helpful tips will make your construction easier and more
enjoyable.
Assembly Instructions: Instructions are supplied in this manual and contain all
appropriate information for your building model. Review all instructions before you begin,
and during assembly, follow the step sequence carefully for correct results.
Foundation and Anchoring: Your stor age building must be anchored to prev ent wind
damage. A f oundation is also necessary as a base in order to construct a square and lev el
building. Anchoring and foundation materials are not included with your building. We
recommend the combined use of an Arrow Floor Foundation Kit and an ArrowAnchoring Kit as an effective method of securing your building to the ground (Available
by mail order or at your local dealer) or you may construct the foundation and anchoring
system of your choice. Your assembly instructions provide information on a few methods
commonly used to secure and level a storage building.
Parts and Parts List: Check to be sure that you have all the necessary parts for y our
building.
•All part numbers can be found on the parts. All of these numbers (before the -) must agree with the
numbers on the parts list. The parts list is located on page 12.
•If you find that a part is missing, include the model number of your building and contact:
Arrow Group Industries, Inc. Customer Service Department
Route 50 East Breese, Illinois 62230
1-800-851-1085
•Separate contents of the carton by the part number while reviewing parts list. The first few steps
show how to join related parts to make larger sub assemblies which will be used later.
•Familiarize yourself with the hardware and fasteners for easier use during construction. These are
packaged within the carton. Note that extra fasteners have been supplied for your convenience.
2
PLAN AHEAD....
A3
W atch the W eather: Be sure the da y you select to install y our building is dry and calm.
Do not attempt to assemble your building on a windy day. Be careful on wet or muddy
ground.
Teamwork: Whenev er possible, two or more people should work together to assemble
your building. One person can position par ts or panels while the other is able to handle
the fasteners and the tools.
Tools and Materials: These are some basic tools and materials you will need for the
construction of your building. Decide which method of anchoring and the type of
foundation you wish to use in order to form a complete list of the materials you will need.
Required
• Eye Goggles
• No. 2 Phillips Screwdriver
(With Hardened Magnetic Tip)
Note: A power screwdriver or variable speed drill with Phillips-tip attachment can speed assembly by
as much as 40%.
• Work Gloves
• Step Ladder
• Utility Knife / Scissors
• Pliers
• Carpenter's Level
• Tape Measure
Required
Optional Time-Savers
• Wrench / Nut Driver
• Electric / Cordless Drill
• Square
• String (for squaring frame)
Foundation Preparation
• Hammer and Nails
• Spade or Shovel
• Hand Saw / Power Saw
• Lumber and/or Concrete
Selecting and Preparing Your Site: Before assembly, you will want to decide on
a location for your building. The best location is a level area with good drainage.
•Allow enough working space for ease of moving parts into position during assembly. Be sure there
will be enough space at entrance for doors to open fully and enough space around the building to
be able to fasten the panel screws from the outside.
•Before you begin the first steps in assembling your parts, a foundation should be constructed and
an anchoring system should be ready to use.
3
SAFETY FIRST....
A4
Safety precautions are important to follow throughout the construction of your building.
•Care must be taken when handling various
pieces of your building since some contain
sharp edges. Please wear work gloves, eye
protection and long sleeves when assembling
or performing any maintenance on your building.
safety edge
sharp edge
sharp edge
safety edge
•Keep children and pets away from worksite to
avoid distractions and any accidents which
may occur.
•Practice caution with the tools being used in the
assembly of this building. Be familiar with the
operation of all power tools.
•Do not attempt to assemble the building if parts
are missing because any building left partially
assembled may be seriously damaged by light
winds. Call 1-800-851-1085
•Never concentrate your total weight on the
roof of the building. When using a step ladder
make sure that it is fully open and on even
ground before climbing on it.
4
•Do not attempt to assemble the building on a
windy day, because the large panels acting as a
"sail", can be whipped about by the wind making
construction difficult and unsafe.
CARE & MAINTENANCE....
A5 Web
Finish: For long lasting finish, periodically clean and wax the exterior surface. Touch-
up scratches as soon as you notice them on your unit. Immediately clean the area with
a wire brush; wash it and apply touch-up paint per manufacturer's recommendation.
Roof: Keep roof clear of leaves and snow with long handled, soft-bristled broom. Heavy
amounts of snow on roof can damage building making it unsafe to enter. In snow country,
Roof Strengthening Kits are available for most Arrow Buildings for added protection
against heavy snow accumulation.
Doors: Alwa ys k eep the door tr acks clear of dirt and other debris that prevent them from
sliding easily. Lubricate door track annually with furniture polish or silicone spray. Keep
doors closed and locked to prevent wind damage.
Fasteners: Use all washers supplied to protect against weather infiltration and to protect
the metal from being scratched by screws . Regularly check your building f or loose screws ,
bolts, nuts, etc. and retighten them as necessary.
Moisture: A plastic sheet (vapor barrier) placed under the entire floor area with good
ventilation will reduce condensation.
Other Tips....
• Wash off inked part numbers on coated panels with soap and water.
• Silicone caulking may be used for watertight seals throughout the building.
Do not store swimming pool chemicals in your building. Combustibles and
corrosives must be stored in air tight approved containers.
Keep this Owner's Manual and Assembly Instructions for future reference.
5
ACCESSORIES....
A6 WEB
ROOF STRENGTHENING (heavy snow load) KITS Extra roof beams and gable braces
designed for added protection against heavy snow accumulation. Increases the strength of your roof by 50%.
ANCHOR KIT
ANCHOR KIT
Model No. AK4
Anchor Kit contains heavy-duty steel
augers, 60' (18m) of steel cable and 4 cable
clamps. No digging or concrete
pouring, just insert cable under roof,
over roof beams, into augers and twist
augers into the ground. For buildings
larger than 10'x9', use 2 kits.
Model No. AK100
New concrete anchor system permits
anchoring any size Arrow building
directly to a concrete slab. Each kit
contains heavy-duty, hot-dipped
galvanized steel corner gussets and
perimeter clips which fit over the floor
frame and lag bolt into a concrete slab.
Full assembly instructions and a 1/4"
masonary drill bit are included.
FLOOR FOUNDATION KITS
MODELS FB47410, FB5465, FB106-A
FB109-A, FB1010 AND FB1014-A
A simple new floor frame system made of heavy-duty, hot-dipped
galvanized steel. Use as foundation for plywood, sand or stone.
TOOL HANGING RACK
Model No. TH100
The perfect tool organizer. Twin
25 1/2" (65cm) steel channels
plus five heavy-duty snap-in
hangers and a small tool holder for
screwdrivers, pliers, etc. Holders
slide along channel for fully
adjustable spacing. Great for
garage, basement, or the back
of any door. Fits all Arrow
storage buildings.
6
ATTIC KIT / WORKBENCH KIT
Heavy-duty galvanized steel bars that
fit all 10' wide Arrow buildings. They
install quickly and easily to help
organize space and create more
useable space as an attic or
workbench. Will hold up to 250 lbs.
(113kg) evenly distributed.
Model No.FitsShipping Weight
10' Long, 250 lb. (113kg) load+
Fits all Arrow 10' wide buildings.
Must be drilled for use as workbench in Estator.
+ Even weight distribution.
16 lbs. (7kg)AT101
SHELF UNITS
Heavy-duty, galvanized steel shelf units help organize storage
space. They easily mount on the wall or sit on the floor. Fits all
Arrow buildings.*
Model No. SS404
• Makes 8" to 12" (20-30cm)
wide shelves in any length.
• Brackets, braces,
hardware included.
Lumber is not included.
* Some drilling required to fit buildings without mid-wall bracing.
Model No. SS900-A
• Grey color
• 3 shelves
• Holds up to 85 lbs. (38kg)
(even weight distribution)
THIS
PAGE
WAS
LEFT
BLANK
INTENTIONALLY
7
THIS
PAGE
WAS
LEFT
BLANK
INTENTIONALLY
8
Foundation
F09
The Foundation For Your Building
OPTION 1: ARROW FLOOR FOUNDATION KIT: (Order No. FB1014-A or 68387-A)
Arrow has the best base for your building in this simple kit. It keeps stored items above the ground.
This foundation should be used with one of the following:
A. To support a plywood deck B. To be filled with sand. We recommend the combined use of
1. an ARROW FLOOR FOUNDATION KIT and 2. an ARROW ANCHORING KIT as an effective method of securing the building to theground. Allow 1 - 2 hours for construction.
OPTION 2: Wood Platform
If you decide to build your own foundation, be sure to select the appropriate materials.
These are the recommended materials for your foundation:
● 2 x 4's (5cm x 10cm) Pressure Treated Lumber ● 5/8" (1,5cm) 4 x 8 (122cm x 244cm) Plywood-exterior grade
The platform should be level and flat (free of bumps, ridges etc.)
to provide good support for the building. The necessary materials
may be obtained from your local lumber yard.
To construct the foundation follow instructions and diagram.
Construct frame (using 10 penny galvanized nails)
Measure 16"/24" (40,6cm/61cm) sections to construct
inside frame (see diagram)
Secure plywood to frame (using 4 penny galvanized nails)
Allow 6 - 7 hours for construction.
Note: Platform/Slab will extend 9/16" (1,4cm) beyond floor
OPTION 3: Concrete Slab
The slab should be at least 3" to 4" (8-10cm) thick. It must be level and flat to provide good support for the frame.
The following are the recommended materials for your foundation.
● 1 x 4's (2,5cm x 10cm) (will be removed once the concrete cures)
● Concrete ● Sheet of 6 mil plastic
● We recommend for a proper strength concrete to use a mix of: 1 part cement ● 3 parts pea sized gravel ● 2 1/2 parts clean sand
Prepare the Site/Construct a Foundation
1. Dig a square, 6" (15cm) deep into the ground (remove grass).
2. Fill up to 4" (10cm) in the square with gravel and tamp firm.
3. Cover gravel with a sheet of 6 mil plastic.
4. Construct a wood frame using four planks of 1x4 (2,5cm x 10cm)
lumber.
5. Pour in concrete to fill in the hole and the frame giving a
total of 4" (8-10cm) thick concrete. Be sure surface is level.
Allow 3 - 5 hours for construction and a week for concrete curing time.
16"/24"
40,6cm/61cm
121"
FRONT
(DOOR)
frame on all four sides. Seal this 9/16" of wood with a
roofing cement (not included), or bevel this 9/16" of
concrete when pouring, for good water drainage.
3,1m
FRONT
(DOOR)
Note: Finished Slab dimensions, with lumber removed.
121"
3,1m
160 1/4"
4,1m
160 1/4"
4,1m
9
Anchoring
A10
Anchoring Down The Building
It is important that the entire floor frame be anchored after the building is erected.
Below are recommended ways of anchoring.
Arrow Anchoring Kit: (Model No. AK4 or 60298)
Recommended for use with any suggested base.
Contains: 4 Anchors with Cable, Clamps and
installation instruction.
Anchoring into Wood/Post:
Use 1/4" Wood Screws. There are 1/4" (0,63cm) dia.
holes provided in the frames for proper anchoring.
1.2.
OVER THE BEAMS
AND INTO THE GROUND
Arrow Anchoring Kit: (Model No. AK100 or 68383)
Recommended for use with the concrete foundation.
Contains: Corner gussets, perimeter clips, hardware,
1/4" masonary drill bit and installation instruction.
Anchoring into Concrete:
1. For poured concrete slab or footing or patio blocks:
Use 1/4" x 2" Lag Screws.
2. For Anchor Post of Concrete poured after building is
erected: Use 1/4" x 6" Lag Screws.
1.
2.
10
SO11
#8-32 Hex Nut (222)
65103
Hardware
Remove from bag of screws
and save for the last step
65900A
#10Bx1/2" Black Screw (4)
(Packed with Screws)
65923
#8-32x3/8" Bolt (222)
65004
#8Ax5/16" Screw (446)
66045
Handle (2)
66242
Door Slide (4)
66646
Washer (499)
(13 sheets of 40)
66382
Lower Door Guide (4)
65109
#8-32 Acorn Nut (4)
(Packed with Screws)
66183
Roof Trim Cap
(2 right & 2 left)
67468
Peak Cap (6)
(Arrow Logo)
6228
Track Support (2)
67545 21'
Weather Stripping (1)
67293 10'
Weather Stripping (1)
11
SO12
Parts List
Parts In Carton One
AssemblyPartPartQuantityCheck
Key No.Nu mbe rDescriptionIn CartonList
13719Door Handle Brace 2
29373Front Wall Panel 2
36020Corner Panel 4
46108Large Right Gable 2
56109Large Left Gable 2
66114Small Right Gable 2
76115Small Left Gable 2
86188Right Roof Panel 2
96189Left Roof Panel 2
106264Horizontal Door Brace 4
116278Vertical Door Brace 2
126515Wall Panel12
136538Roof Panel 8
148538Right Door 1
158539Left Door 1
169369Door Jamb 2
1767521Edge Trim 2
186015Side Roof Trim 2
196403Door Track Splice 1
206797Ridge Cap 6
216869Ridge Cap 3
226892Right Side Roof Trim 2
236893Left Side Roof Trim 2
249366Door Track 2
12
Parts In Carton Two
AssemblyPartPartQuantityCheck
Key No.Nu mbe rDescriptionIn CartonList
The front floor frame is made up of
three pieces. The side floor frames
and the rear floor frame are made up
of two pieces. The holes in these
pieces will align when the pieces are
positioned with correct amount of
overlap. The illustrations below show
the proper overall length for the sides,
rear and front. Proceed as follows:
● Par ts Needed For ●
Floor Frame Assemblies
9367
8934
10387
●●
● 8934 Ramp (1)
●●
●●
● 9367 Front Floor Frame (2)
●●
●●
● 8936 Rear Floor Frame (2)
●●
●●
● 10387 Side Floor Frame (4)
●●
9367
8936
1 Place the front floor frames as
shown. Center the ramp, with drain
holes facing outside, on top of the two
front floor frames. Join the frames by
inserting eight screws.
2 Overlap the side floor frames and
the rear floor frames as shown. The
holes in these pieces will align when
the pieces are positioned with correct amount of overlap. See the illustrations below for the proper overall
length of the side and rear floor frames.
Join the frames by inserting four/five
bolts into each frame set as shown.
3 Double check the length of each
and set these pieces aside for later
use.
STEP
1
STEP
2
9367
10387
8934
DRAIN HOLES FACE
OUTSIDE
Side Floor Frame 158 5/8" 4,0m
10387
Rear Floor Frame 119 3/8"
89368936
Front Floor
Frame Assembly
119 3/8" 3,0m
9367
3,0m
14
STEP
3
158 5/8" 4,0m
Sides
158 5/8" 4,0m
119 3/8" 3,0m
Front & Rear
119 3/8" 3,0m
Step 2
SO15
The main frame pieces reinforce the
walls. These pieces will later be installed in the center and at the top
edge of the side walls and the rear
wall. Proceed as follows:
1 Overlap the rear wall channel
pieces as shown in the figure and
fasten the two pieces together with
eight bolts
as shown.
● Parts Needed For ●
Frame Assemblies
10389
10388
●●
● 5986 Rear Wall Angle (2)
●●
●●
● 10389 Rear Wall Channel (2)
●●
●●
● 10388 Side Wall Channel (4)
●●
● ●
● 10391 Side Wall Angle (4)
● ●
Rear Wall Channel
118 1/8" 3,0m
10389
Side Wall Channels
157 3/8" 4,0m
2 Make two side wall channels by
overlapping the side wall channel
pieces as shown. Fasten each set
together with
eight bolts
as shown.
3 Overlap the rear wall angle
pieces as shown in the figure and
fasten them together with
one bolt in
the center hole.
4 Make two side wall angles by
overlapping the side wall angle
pieces as shown. Fasten each set
together with
The roof beams join the two gables
and support the roof panels. The main
roof beam is made up of four pieces
overlapped back to back at the center. The left and right roof beam assemblies are made up of two pieces.
Hint: These pieces are force-fitted,
so you may have to press hard to join
them together.
1 Place the end of one roof beam
inside a second roof beam so that the
six holes in each piece align. Make
four sets of roof beams by repeating
this procedure.
Do not insert bolts
yet.
2 Take two of the pressed-together
roof beams and join them as shown
to form the main roof beam assembly.
Hold the assembly together and fasten with 14 bolts. Build
Doubled Beam Assembly.
only one
STEP
1
STEP
2
10386
10386
Roof Beam 159 3/8" 4,0m
ASSEMBLED
END
VIEW
Beam Assembly for Peak in Roof
10386
Build
one
Doubled Main Roof
3 Fasten the other two pressed-
together roof beams with eight bolts
to make the left and right roof beam
assemblies.
4 Set these pieces aside for later
assembly.
16
10386
STEP
3
Build
two
Single Beam
Assemblies for Break in Roof
10386
10386
159 3/8"
4,0m
159 3/8"
4,0m
Step 4
SO17
The door track assembly supports
the sliding doors and reinforces the
front wall. It is made up of three pieces.
1 Using the door track splice,
(painted), join the door track
(galvanized) pieces end-to-end as
shown.
2 Insert four screws
side only.
Hint: The holes in the top side of the
door track assembly are for fastening
the gable to the top of the front wall in
a later step.
from the under-
● Par ts Needed For ●
Door Track Assembly
Door Track Splice (painted part)
6403
9366
9366
STEP
1
STEP
2
6403
NOTE:
●●
● 6403 Door Track Splice (1)
●●
●●
● 9366 Door Track (2)
●●
66242
Long Leg
on Top
Short Leg
on Bottom
9366
3 Position door slides onto the legs,
from the end of door track
assembly, as shown in the end view.
NOTE: Flat side on top, pins and
holes
must
be oriented as shown.
4 Set this piece aside for later use.
END VIEW
66242
118 1/8" 3m
STEP
3
118 1/8" 3m
118 1/8" 3m
9366
STEP
4
17
Step 5
SO18
● Par ts Needed For ●
Floor Frame
●●
● Front Floor Assembly (1)
●●
●●
● Side Floor Assembly (2)
●●
●●
● Rear Floor Assembly (1)
●●
RIGHT
REAR
10387
1 Place the floor frame pieces that
you assembled earlier on the foundation. Assemble the four corners of
the floor frame using two screws at
each corner as shown. At the front
corners fasten bolts through from
the bottom with nuts on top.
2 Measure the floor frame diago-
nally. When the diagonal measurements are equal, the floor frame is
square.
NOTE
If using a wood platform or
concrete slab do not fasten the
floor frames to your base at this
time. You will anchor the
building after it is erected.
STEP
1
FRONT
8936
RIGHT
FRONT
10387
9367
When Diagonal Measurements
are Equal the Floor Frame
is Square.
STEP
2
Level
NOTE
If you have purchased a Floor
Foundation Kit you need to
install it at this time.
The floor frame
and level
18
or holes will not align.
must be square
Step 6
SO19
● Par ts Needed For ●
Corners
●●
● 6515 Wall Panel (2)
●●
●●
● 9373 Front Wall Panel (2)
●●
●●
● 6020 Corner Panel (4)
●●
NOTE
The remainder of the building assembly
requires many hours and more than one
person. Do not continue beyond this point
if you do not have enough time to com-
plete the assembly today. A partially
assembled building can be severely
damaged by light winds.
Each screw and bolt in the wall requires a washer.
1 Position a corner panel at the
corner of the floor frame as shown.
The widest part of each corner panel
must be placed along the side of the
building for all four corners. Fasten
the corner panel to the floor frame
with one screw.
Support the corner panel with a step
ladder until a wall panel is attached.
2 Attach the front wall panels to the
front corner panels, as shown. A small
gap will exist between front wall panel
and ramp.
STEP
1
Wide Side
SIDE
6020
6020
6515
9373
TOP VIEW
FRONT
STEP
2
Narrow
Side
REAR
6020
SIDE
6020
6515
STEP
3
9373
3 Attach the wall panels to the rear
corner panels, as shown.
NOTE
Be careful to install the correct
panel in each position as shown
4 Double-check the part numbers of
the wall panels, before proceeding.
The floor frame
and level
or holes will not align.
must be square
STEP
4
6020
9373
9373
Panels rest on
frame as shown
6020
6515
6515
6020
6020
Washer
19
Step 7
SO20
The mid frame pieces give rigidity to
the side and rear walls.
1 Fasten the rear wall channel
across the middle of the rear wall
using screws.
2 Fasten the side wall channels
across the middle of the side panels
using screws. Fasten overlaps in
rear corners with bolts and nuts, at
two locations. See the figure.
NOTE
The wall channels behind the
front wall panels will be installed
in a later step.
● Parts Needed For ●
Mid Frames
●●
● Rear Wall Channel Assembly (1)
●●
●●
● Side Wall Channel Assembly (2)
●●
STEP
2
STEP
1
10389
10388
STEP
2
20
FRONT
Step 8
SO21
The top frame pieces give rigidity to
the walls and provide a surface for
attaching the gables which support
the roof.
1 Fasten the rear wall angle across
the inside top of the rear wall using
screws.
2 Fasten the side wall angles across
the inside top of the side panels using screws. Side wall angles must
overlap rear wall angle in corners.
● Par ts Needed For ●
Top Frames
●●
● Door Track Assembly (1)
●●
●●
● Rear Wall Angle Assembly (1)
●●
●●
● Side Wall Angle Assembly (2)
●●
3 Fasten the door track assembly
(holes on top) across the top of the
front wall panels using screws. See
the figure.
9366
STEP
3
Wall Angles
Must Face
Inside
Building
STEP
2
10391
DOOR TRACK ASSEMBLY
STEP
5986
Long Leg
on Top
Opening
1
facing in
Short Leg
on Bottom
FRONT
21
Step 9
SO22
Each wall panel has a crimped rib on
one side. The crimped rib should go
under the rib of the panel that follows
it.
1 Locate all of the wall panels and
set each one alongside the building.
2 Fasten the wall panels at the top
and bottom with screws.
3 Fasten the center of each panel to
the wall channel with screws.
● Par ts Needed For ●
Wall Panels
Crimped Rib
Underneath
●●
● 6515 Wall Panel (10)
●●
STEP
4
STEP
6515
Detail Showing
Center of Panel
Screwed to
Wall Channel
2
4 Fasten overlapping ribs as before.
Panels rest on
frame as shown
6515
STEP
STEP
1
Bolt and nut
does not go
3
thru wall
channel at
overlap
22
Use bolts and nuts
thru wall angle
overlap at the top
of panel at rear.
Step 10
SO23
Front Channel/Door Jamb
The door jambs reinforce the door
opening and provide an attractive
trim. Follow these steps for both
door jambs.
● Parts Needed For ●
9365
●●
● 9369 Door Jamb (2)
●●
●●
● 9365 Front Wall Channel (2)
●●
1 Fasten the front wall channels
in their positions between the end of
the side wall channel and the corner panel using screws. Do not put
a screw in the hole at the end behind the door opening at this time.
2 Fasten a door jamb to the front
panel with two bolts, nuts and acorn
nuts, as shown.
3 Fasten the center of the door
jamb to the front wall panel and the
front wall channel with two screws.
Acorn Nut
Hex Nut
Acorn Nut
STEP
1
STEP
2
9369
FRONT
FRONT
INSIDE OF
BUILDING
(2) bolts
Bolt
Screw
TOP VIEW
Front Wall Channel
Door Track
9369
TOP VIEW
Front Wall Channel
Cross-Section
Top View
Screw
STEP
3
4 Fasten the top of the door jamb to
the door track with two screws. Do
the same for the bottom into frame.
Repeat steps 2 through 4 for the
opposite
door jamb.
STEP
4
Screw
TOP VIEW
Door Track
Screw
23
Step 11
SO24
● Par ts Needed For ●
Gable Assemblies
●●
● 6108 Large Right Gable (2)
●●
●●
● 6109 Large Left Gable (2)
●●
●●
● 6114 Small Right Gable (2)
●●
●●
● 6115 Small Left Gable (2)
●●
●●
● 6085 Roof Beam Bracket (4)
●●
The gables go on top of the front and
rear walls to support the roof beams.
NOTE
The gables are packed nested
together and might be mistaken
as one piece. Carefully separate
them before continuing.
1 Apply edge trim to the edge of the
large left gable and the large right
gable, cut to length.
2 Join the large gables to the small
gables on the left and right sides
using four bolts, washers and nuts on
each side. This part of the gable is
called the
outer gable leg
.
67521 Edge Trim
(Plastic Piece)
FRONT
6109
Washer
6115
3 Attach the four roof beam
brackets to the outer gable legs us-
ing two bolts in the two bottom holes
of the four holes that align.
STEP
6114
STEP
3
STEP
1
2
6108
Roof Beam Brackets
6085
24
Step 12
SO25
1 Lift and fasten a right and left
gable, under angle at corner, to the
door track and rear wall angle with
screws.
Hint: On the front gable, leave out 2
screws closest to center gable leg.
On the rear gable, use a bolt and nut
at the overlapping rear wall angle.
2 Fasten the single roof beam to
the outer gable leg as shown using
bolts.
● Par ts Needed For ●
Gables/Roof Beams
●●
● Left Gable Assemblies (2)
●●
●●
● Right Gable Assemblies (2)
●●
●●
● Single Roof Beam Assemblies (2)
●●
●●
● 6636 Gable Brace (2)
●●
Hint: The holes along the length of
the beam must be on the
Repeat Step 1 for the opposite side of
building.
top
surface.
3 Join the left and right gables
together with a gable brace using a
bolt in the second hole from the
bottom
front and rear gables.
Repeat Step 2 for the opposite side of
building.
only
. Do this step for both
Nut and bolt
at rear of building.
6636 Gable Brace
STEP
1
Gable
STEP
3
10386 Roof Beam (Single)
STEP
2
25
Step 13
SO26
1 Fasten the track supports to the
front gable assembly only, as shown.
● Par ts Needed For ●
Roof Beam//Braces
●●
● Main Roof Beam Assembly (1)
●●
●●
● 6227 Roof Beam Brace (2)
●●
STEP
2 Wrap the weather stripping tape
around the two joined edges of the
large left and right gables. See diagram. Cut the weather stripping to
length and repeat on next gable set.
3 Spread the two halves of the double
roof beam and fasten to the gable
brace of the front gable.
4 Fasten the other end of the double
roof beam to the gable brace of the
rear gable.
5 Fasten a roof beam brace to the
double roof beam behind the front
gable by placing the tab on the end of
the brace
Align the tab with the
fasten the brace with a bolt and nut.
between
the roof beams.
fourth
hole and
STEP
2
Spread Two Halves
Of Roof Beams
1
Track Supports 6228
Weather Stripping
STEP
3
STEP
4
6 Fasten the lower end of the roof
beam brace to the track support
with a bolt and nut.
7 Fasten a roof beam brace be-
tween the rear gable and the roof
beam at the third hole, as shown.
26
10386 Roof Beam (Double)
STEP
STEP
7
5
Roof Beam Brace 6227
Roof Beam Brace 6227
STEP
6
Step 14
SO27
Installing the roof panels is best done
with a step ladder. Install the first roof
panel at the back right corner of the
building. Each screw and bolt in the
roof requires a washer.
NOTE
Measure the building diagonally
again and make adjustments to
make sure the building is square
and level. This will make the roof
panels fit better, and holes will
align. Don't anchor the floor frame.
NOTE
If a Roof Beef-Up Kit was
purchased, assemble prior to
attaching the roof panels.
● Par ts Needed For ●
Right Roof Panel
STEP
1
STEP
2
(6) Screws
●●
● 6188 Right Roof Panel (1)
●●
6188
Nut
Washer
1 Locate the roof panels and find the
right roof panel part number 6188.
2 Position the right roof panel at the
back right corner and fasten to the
gable with seven bolts and nuts and
roof beams using six screws.
fasten the lower end of the panel to
the side wall angle at this time.
Do not
Bolt
(7)
Gable
1
6188 Right Roof Panel
2
3
4
5
6
7
FRONT
27
Step 15
SO28
1 Install a left roof panel 6189 at the
left rear corner of the roof.
2 Cut 34 short (3") strips off the small
roll of weather stripping tape, and
put them aside. Cover the joint at the
peak with weather stripping tape,
large roll. Unroll the tape and press it
down over the opening at the ridge as
you install each roof panel. Do not cut
the tape at this time.
3 Install two roof panels 6538 work-
ing side to side. Fold the lower section of the roof panels down. Cover
the notches with the strips of weather
stripping tape. Save the rest.
fasten the lower end of the panels to
the side wall angles at this time.
tinue weather stripping the ridge opening.
NOTE
Narrow roof panel crimped rib is
overlapped by wide rib of
adjacent panel where possible
4 Install three ridge caps 6797 on
the completed roof section using bolts
and nuts. Do not fasten the ends of
the ridge caps at this time.
5 Fasten the roof panel ribs, peak
caps and ridge caps together using
bolts and nuts.
Do not
Con-
● Parts Needed For ●
Ridge Caps & Panels
Fasten at
Overlap With
Bolt
Screws To
Roof Beam
Do not fasten
STEP
1
6797
6538
Screws To
Roof Beam
at this time
6797
6189
Roll
STEP
●●
● 6189 Left Roof Panel (1)
●●
●●
● 6538 Roof Panel (2)
●●
●●
● 6797 Ridge Cap (3)
●●
Fasten At
Overlap With
Bolt
STEP
3
STEP
Weather Stripping Tape
4
6797
Strips
2
STEP
5
28
6538
STEP
3
FRONT
Step 16
SO29
1 Install the second ridge caps 6869
overlapping the first ridge caps while
installing four roof panels 6538.
The bolts on the ridge cap need to be
left loose to move the ridge cap to the
side and overlap the ribs of the next
roof panel.
Cover the notched areas
of the roof panels with strips of weather
stripping tape and continue weather
stripping the ridge.
NOTE
If roof beam holes do not line up
with the roof panel holes, shift the
building from left to right.
If this does not help, your building
may not be level. Shim the
corners until holes line up.
Hint:
● Par ts Needed For ●
Ridge Caps & Panels
●●
● 6538 Roof Panel (4)
●●
●●
● 6869 Ridge Cap (3)
●●
Weather Stripping Tape
6869
6869
6869
6538
6538
6538
6538
29
Step 17
SO30
● Par ts Needed For ●
Ridge Caps & Panels
●●
● 6538 Roof Panel (2)
●●
●●
● 6797 Ridge Cap (3)
●●
● ●
● 6188 Right Roof Panel (1)
● ●
● ●
● 6189 Left Roof Panel (1)
● ●
1 Install the third ridge caps 6797
overlapping the second ridge caps
while installing the remaining roof
panels 6538.
Hint: The bolts on the
ridge cap need to be left loose to
move the ridge cap to the side and
overlap the ribs of the next roof panel.
Cover the notched areas of the roof
panels with strips of weather stripping tape and continue weather stripping the ridge.
2 Install the left 6189 and right roof
panel 6188 as you unroll the weather
stripping tape, and press it down.
Fasten the lower end of the panels to
the side wall angles using screws
and washers.
Reducing Large Gable Bulge
Loosen eight bolts and nuts shown. Apply
pressure with one hand at the peak of the
gable and tighten bolt #1. Keeping pressure
on the gable work down the slope tightening
each bolt. Excess material will overlap smaller gable at seam. Once material bulge is
worked out tighten four vertical bolts that
connect the large and small gables.
#1
#2
#3
#4
3 Fasten the roof panel ribs, peak
caps and ridge caps together using
bolts and nuts.
6797
STEP
3
6188
STEP
2
6538
Peak Cap
STEP
6797
Cut
Weather Stripping
and Fold Under
1
6797
6538
6189
STEP
2
30
Step 18
SO31
1 Attach the right, left and side roof
trim to the lower end of the roof pan-
els on each side of the building using
screws at each panel overlap.
NOTE
A single screw fastens both trim
pieces at the overlap.
2 Using your thumb and index fin-
ger, overbend the bottom flange of
the roof panel rib at the corner inward
enough so the right and left roof trim
caps fit onto right and left corners.
●Parts Needed For●
Roof T rim
●●
● 6893 Left Side Roof Trim (2)
●●
●●
● 6892 Right Side Roof Trim (2)
●●
● ●
● 6015 Side Roof Trim (2)
● ●
3 Fasten the roof trim caps to the
side trim using a screw.
6892
Roof Trim Cap
STEP
3
6015
6893
6893
6015
Roof trim
6892
STEP
1
Roof Trim Cap
STEP
2
Tuck Flange
Inward to Fit
Inside of
31
Step 19
SO32
The steps on this page tell how to
assemble the right door. You will
perform exactly the same procedures
for the left door. Each bolt and screw
in the door requires a washer. Proceed as follows:
1 Attach the door handle brace and
handle to the door with 1 bolt as
shown.
Don't tighten the bolt yet.
● Parts Needed For ●
Door Assembly
6264
6278
66045
3719
●●
● 3719 Door Handle Brace (2)
●●
●●
● 8538 Right Door (1)
●●
●●
● 8539 Left Door (1)
●●
●●
● 6264 Horizontal Door Brace (4)
●●
●●
● 6278 Vertical Door Brace (2)
●●
66045
3719
2 Swing the door handle brace up to
the hole on the center of the door and
insert a screw.
3 Hold the vertical door brace
against the center of the inside surface of the door and turn the screw to
hold the vertical door brace and door
handle brace in place. Fasten to
door above and below center
connection using 2 screws.
4 Insert a second bolt in the door
handle and tighten both bolts.
5 Put a horizontal door brace onto
the top edge and bottom edge and
fasten
with 1 bolt in the center.
6 Attach the lower door guides as
shown.
66382
6278
66382
STEP
2
STEP
3
Right Door
STEP
1
6264
STEP
4
STEP
5
6264
7 Repeat steps 1 through 6 for the
left door.
32
66382
STEP
6
END VIEW
SHOWING:
Horizontal
Door Brace
Guide
Door
Washer
Step 20
SQ33
● Parts Needed For ●
Door Installation & Adjustment
●●
● Right Door Assembly (1)
●●
●●
● Left Door Assembly (1)
●●
1 From inside the building, put the
bottom of the right door assembly (on
your left when you are inside the
building) behind door jamb into the
front frame track.
2 Position the top of the door so that
the holes in the door line up with the
holes in the door slides.
3 Fasten the door to the door slides
using a #10Bx1/2" screw.
Gable
Door Track
Door Slide
Front Floor Frame Assembly
Horizontal Door Brace
Door
STEP
1
STEP
2
Door Slide
NOTE
The four holes in the top of each
door allow you to adjust the
doors. Place the door slide in
the middle 2 holes.
4 Repeat steps 1 through 3 for the
left door.
Adjustment Holes
Adjustment Holes Allow
Doors to Meet Evenly
Along Their Length
#10Bx1/2" Screw
STEP
3
Right DoorLeft Door
STEP
4
33
SO34
SOME FACTS ABOUT RUST
SOME FACTS ABOUT RUST
Rusting is a natural oxidizing process that occurs
when bare metal is exposed to moisture. Problem
areas include screw holes, unfinished edges, or
where scrapes and nicks occur in the protective
coating through normal assembly, handling and
use. Identifying these natural rusting problem areas
and taking some simple rust protection precautions
can help to stop rust from developing, or stop it
quickly as soon as it appears.
1. Avoid nicking or scraping the coating surface,
inside and out.
2. Use all the washers supplied. In addition to protecting against weather infiltration, the washers protect the metal from being scraped by the screws.
3. Keep roof, base perimeter and door tracks free of
debris and leaves which may accumulate and retain
moisture. These can do double damage since they
give off acid as they decay.
4. Touch up scrapes or nicks and any area of visible
rust as soon as possible. Make sure the surface is
free of moisture, oils, dirt or grime and then apply an
even film of high quality touch-up paint.
34
Loading...
+ hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.