available by contacting ARJO Hospital Equipment AB.
Our policy is one of continous development, and we therefore reserve
the right to make technical alterations without notice. The content of this
publication may not be copied either whole or in part without the consent
of ARJO Hospital Equipment AB.
Check Points prior to the Installation. . . . . . . . . . . . . 22
3
Page 4
Reference Copy
Published
Check occasionally
for new editions.
1:11 pm, Jun 05, 2007
Introduction
Freedom Bath
ARJO Freedom Bath is a sophisticated piece of
medical equipment and has to be handled as such.
The Freedom Bath does require installation,
however we do not want the Freedom Bath tiled
in as certain components need regular service and
maintenance.
Site Preparations
This document has been developed to supply you
with accurate and targeted information in order to
make your site preparation for the ARJO Freedom
Bath ideal. Combining good engineering practice
with a well prepared installation site, will ensure a
worry free installation the day your Freedom Bath
is delivered. Please read through the complete
manual prior to preparing your site as it will show
different installation scenarios.
Please take extra care to identify your specific
installation scenario. We suggest that you use
the tic box in the lower right hand corner of each
scenario for future reference as well as simple
identification within different workgroups.
(plumbing, electrical, drywall, tiling etc.)
For installation sites that require a seal between
their tub and wall; we have an accessory in the
form of a Tile-in kit comprising of a seal that can be
placed between tub and wall, allowing for easy
removal.
Approvals
UL classification
UL marking (US-models 120V-60Hz)
Patient Bathing Units Classified in accordance
with the standards for Plastic Bathtub and Shower
Units, ANSI Z124.1.2-2005;
Whirlpool Bathtub Appliances, ANSI/ASME
A112.19.7M-1995;
Suction Fittings, ANSI/ASME A112.19.8-1987;
Pipe Applied Vacuum Breakers, ANSI/ASSE
1001-1988;
Hand- HeldShowers, ANSI/ASSE 1014-1989;
Individual Thermostatic, Pressure Balancing and
Combination Pressure Balancing and Thermostatic
Control Valves for Individual Fixtures, ANSI/ASSE
1016-1996.
Medical Equipment with respect to electrical
shock, fire and mechanical hazards only in
accordance with Standards no. UL60601-1
CAN/CSA-C22.2No.601.1-M90
Patient bathing units Classified in accordance with
CAN/CSA-B45.0-2004 and B45.5-2004,
“Plumbing Fixtures”, and CAN/CSA-B64.0-1994
and B64.1.1-1994, “Backflow Preventers and
Vacuum Breakers.”
CE marking
CE-marking in accordance with the directive
93/42/EEC (Medical Devices Directive).
The equipment has been tested and fulfils all
requirements with respect to electrical and
mechanical hazards according to IEC 60 601-1
and for EMC according to IEC 60 601-1-2.
User Guidelines
In order to ensure that we accomplish your
demands, we are grateful if this information is read.
This will facilitate the installation procedure and
give the correct and optimal working conditions of
all involved persons.
WRAS (GB only)
WRAS approved Thermostatic Mixing Valves,
according to National Health Service
Model Engineering Specification D 08- TMV3.
Thermostatic Mixing Valves (Healthcare Premises).
Designation Code: HP-S / HP-T44.
4
Page 5
Reference Copy
Published
Check occasionally
for new editions.
1:11 pm, Jun 05, 2007
Safety Precautions
••
All electrical and plumbing work must be carried
out by authorized personnel:
•In accordance with local codes
•In accordance with local regulations
It is the responsibility of the customer to prepare
the site before the installation procedure starts.
•
To avoid personal damage due to heavy lifts,
suitable transporting aids must be available when
installing the product.
Attention:
Massachusetts customers
With reference to Massachusetts state plumbing
regulations, customers shall install proper backflow prevention devices in compliance with 248
CMR (Code of Massachusetts Regulations).
The drainage system shall also comply
with 248 CMR.
In the Commonwealth of 248 Massachusetts, all
water temperatures shall comply with 248 CMR.
5
Page 6
Reference Copy
Published
Check occasionally
for new editions.
1:11 pm, Jun 05, 2007
Measurements and Weights
Box
W
H
L
Box 1
The Freedom Bath is delivered in box 1
Box 2 contains installation kit
Freedom Bath
27 1/4"
760 mm
e
690 mm
29 3/4"
b
Box 2
a
59 1/2"
1510 mm
Measurements:
L Length W WidthH Height
64 3/4” (1645 mm)36” (915 mm)54” (1370 mm)
W
Shipping weights:
ModelWeight with
Still bath335 lb (152 kg)313 lb (142 kg)
Air spa357 lb (162 kg)335 lb (152 kg)
built-in water control
•
Measurements:
Length
a
Width
b
Height
c
Height, spout
d
Recommended depth of alcove
e
Distance (c/c) drain-floor
f
Weight without
built-in water control
41 1/8"
1045 mm
c
Freedom Bath is available in right-hand
version only!
10 1/2"
270 mm
44 5/8"
1134 mm
d
Drain connection
flexible drain hose included
Weights:
ModelWeight with
Still bath287 lb (130 kg)264 lb (120 kg)
Air spa309 lb (140 kg)287 lb (130 kg)
built-in water control
6 2/8"
160 mm
f
Weight without
built-in water control
6
Page 7
Reference Copy
Published
Check occasionally
for new editions.
1:11 pm, Jun 05, 2007
Space Requirements
Space requirements around the bath
Freedom Bath must always be installed according
to recommended space requirements, this to provide optimal working conditions for personnel and
resident.
Note that space for furniture and other personal
items are not included in these measurements.
tub 59 1/2" (1510 mm)
59 1/2" (1510 mm)
tub
30" (760 mm)
59 " (1500 mm)
Available area for lift integration
Freedom Bath in lift accessible version (LA) allows
following area for lift integration, limited by the
drain connections.
tub
59 1/2" (1510 mm)
32" (800 mm)
59 " (1500 mm)
16" (410 mm)
tub
30" (760 mm)
91 1/2" (2310 mm)
31 1/2" (800 mm)
42 1/8" (1070 mm)
6" (155 mm)
7
Page 8
Reference Copy
Published
Check occasionally
for new editions.
1:11 pm, Jun 05, 2007
Site Preparations
Floor/Walls
Prior to installation of Freedom Bath the floor
and walls within the required area must be
finished.
•
Materials
The floor should be made of a slip-resistant
material, free of bumps.
Levels
The doorway must not have a treshold or if
necessary it should be of the depressible rubber
type, this to facilitate the use of a mobile aid.
Floor Slope
When using a floor drain the slope towards the
drain should not exceed 1:50.
•
Drain
Floor attachments
The sliding tracks provided in the installation kit
have to be used when installing Freedom Bath.
The floor construction must be suitable for anchoring the bolts.
For exact positioning of the two sliding tracks
a template is provided. (See figures 1 and 2.)
Loads
Max. floor load (filled with water + resident):
384 psi (265 N/cm
2
)
Max. floor loading (filled with water + resident):
292 lbs pounds force (1300 N)/foot pad
Weights
Total weight of tub filled with water and typical
176 pound resident (80 kg).
Water capacity
Tub weight
Max. load = resident weight + water weight + tub
weight.
Caulking between tub and wall
Not recommended as it will make the service
access difficult. NOTE ! The tub must never be
built into the finished wall. In order to seal the
space between tub and wall we strongly recommend use of the tile-in kit.
Tile-in kit
When a water protection is wanted between tub
rim and wall the optional tile-in kit should be used.
(See figure 3.) The tile-in kit consists of a flexible
seal that can be placed between tub and wall.
The tile-in kit can both be applied horizontally as
well as vertically.
Slope max. 1:50
8
Page 9
Reference Copy
Published
Check occasionally
for new editions.
1:11 pm, Jun 05, 2007
3/8" hexagonal screw
Sliding track
Optional spacer
Concrete anchor
Te mplate
Figure 1. Floor attachment kit
Drilled holes (x4) for internally 3/8" threaded flush mount concrete anchors.
Follow instructions from anchor manufacturer, for example www.hilti.com
Suitable anchor, example: HILTI HDI 3/8 SS 303
5 6/8"
146 mm
16 5/8"
423 mm
6 2/8"
158 mm
47"
1194 mm
Drilled hole in flooring
6 2/8"
158 mm
Figure 2. Sliding tracks mounted in alcove layout
Figure 3. Tile-in kit applied between Freedom Bath and wall in alcove layout
Tile-in kit
Tile-in kit
Tub
Wall
9
Page 10
Reference Copy
Published
Check occasionally
for new editions.
1:11 pm, Jun 05, 2007
Available Kits (For special installations)
For the in this manual described alternatives for water and drainage installations, the following kits are
available:
AFA0090
1 Drainage pump with accessories
AFA0025
A2 water hoses 94 4/8” (2400mm)
B2 holders
C4 ties
Time necessary to fill tub will be dependent on
actual delivery rates.
Actual delivery rates will be dependent on temperature of hot and cold water in facility water supply
net and related supply pressure.
Plumbing
This manual contains sets of values for temperature and flow; the min./max. values are there to
give you the extremes and are showing the tolerances of the Freedom Bath, we will however also
give you a recommended temperature span and
your target should be to end up within this span to
achieve an optimal function of your product.
Please note that in some countries/states/cities;
local variations of recommended values might differ from our recommended values, in this case the
local code/rules apply. If the local recommendations fall outside the min./max. values, other solutions will have to be looked into and we ask you to
contact your local ARJO representative.
Temperatures
The Freedom Bath contains (optional) a thermostatic mixer that responds very well to differences
in the supply line, both temperature and pressure
differences.
This mixer will safely ensure that the resident never
is exposed to temperatures exceeding
108˚ F (42˚ C) even if the maximum specified hot
water temperature is supplied. Please note that
a few degrees are always "lost" when using a thermostatic mixer and it is therefore recommended to
have a higher supply temperature than the wanted
bath water temperature.
An important reason for keeping hot supply water
really hot is that high temperatures prevents the
rapid growth of Legionella in hot water systems. Of
the same reason it is important that the cold water
temperature is really cold. Of course other methods of reducing the risk of Legionella than regulating temperature can be used.
Pressure and Flow
When designing a bath system with an integrated
mixer it is essential to plan for a low filling time and
a high temperature accuracy. In the Freedom Bath
we did this by installing a combined 3x1/2" pressure and temperature compensating mixer. This
mixer allows us to fill the Freedom Bath at a high
rate and at the same time ensuring a very stable
low flow situation when taking a shower.
In order to achieve this we require you follow the
recommended values/rates on the supply side.
Please see to that the Freedom Bath is fed according to the recommended specifications.
Water connections
G 3/4", Stub-ups must be well sealed not
protruding more than 4" above the finished floor.
(See figure 1 on next page.) Stub-ups with shut-off
valves are recommended.
Flexible water hoses are included in delivery.
Restrictions
Pressure:
Max static: 87 psi (600kPa, 6 bar)
Min. dynamic: 14.5 psi (100kPa, 1 bar)
Cold water: 36-77˚F (2-25˚C)
Hot water: 100-176˚F (38-80˚C)
Recommendations
Pressure:
Dynamic: 29-43.5 psi (200-300kPa, 2-3 bar)
Temperature:
Hot water temperature 114-140˚F (45-60˚C)
Cold water temperature 41-59˚F (5-15˚C)
11
Page 12
3/4" BSP MALE
Reference Copy
Published
Check occasionally
for new editions.
1:11 pm, Jun 05, 2007
max.4"(100 mm)
Figure 1
20 1/2"
520 mm
18 3/4"
480 mm
CW 3/4"
HW 3/4"
15 6/8"
400 mm
26 3/8"
670 mm
Figure 2
12
Page 13
ARJO recommended water supply - floor
Reference Copy
Published
Check occasionally
for new editions.
1:11 pm, Jun 05, 2007
2 3/8"
60 mm
2 3/8"
60 mm
2 3/8"
60 mm
Water supply - wall, left side of tub
TUB
90° Elbow needed
(supplied by others)
17 3/4"-25 5/8"
450-650 mm
Maximum 2 3/8" (60 mmm)
CW
HW
9 7/8"-15 3/4" (250-400 mm)
2" (50 mm)
SITE SPECIFIC
CHOICE
Note! Tub can only be
put in place from this
direction!
SITE SPECIFIC
CHOICE
13
Page 14
Water supply - wall, right side of tub. Use kit AFA0025
Reference Copy
Published
Check occasionally
for new editions.
1:11 pm, Jun 05, 2007
2 3/8"
60 mm
2 3/8"
60 mm
2 3/8"
60 mm
Holders mounted under rear side
of each sliding track.
Rear side of tub
Water hoses fastened with two ties
at each holder.
SITE SPECIFIC
CHOICE
14
Page 15
Water Supply (External Mixer)
Reference Copy
Published
Check occasionally
for new editions.
1:11 pm, Jun 05, 2007
Unassistad bathing - recommended locations of externally mounted water control
•
1
W
S
F
2
W
S
C
F
3
CornerBack wallRecessed
Figure 1
Assisted bathing - recommended locations of externally mounted water control
•
W
S
= Shower
S
= Water mixing valve
W
= Fill spout
F
F
F
1
Figure 2
2
S
W
C
S
F
W
F
3
CornerBack wallRecessed
4
S
F
W
Back wall
S
W
F
15
F
F
= Shower
= Water mixing valve
= Fill spout
S
W
Page 16
Drain Installation
Reference Copy
Published
Check occasionally
for new editions.
1:11 pm, Jun 05, 2007
Connections must be done in accordance with
local regulations.
Restrictions
Min.drainage capacity: 24.6 US gallons/min
(100 l/min).
Recommendations
8" floor sink with trap, indirect connection with
3" drain pipe is preferred. A floor sink facilitates
maintenance of the tub and eliminates the risk of
water damage in case of emergency draining of the
tub.
Recommended location of floor sink drain according to measurements in figure on next page.
•
If alternative area for floor sink is chosen be
sure the floor sink drain will not interfere with
water supply area.
16
Page 17
ARJO recommended floor sink drain
Reference Copy
Published
Check occasionally
for new editions.
1:11 pm, Jun 05, 2007
3 15/16"
100 mm
300 mm
11 13/16"
SITE SPECIFIC
CHOICE
17
Page 18
Alternative stub-up connection
Reference Copy
Published
Check occasionally
for new editions.
1:11 pm, Jun 05, 2007
DRAIN STUB-UP
1 1/2"
(DN 40)
2 3/8"
60 mm
max. 4" (100 mm)
8 1/4"
210 mm
SITE SPECIFIC
CHOICE
18
Page 19
Drain connection with stub-up on right hand side. Use kit AFA0045
Reference Copy
Published
Check occasionally
for new editions.
1:11 pm, Jun 05, 2007
8 1/4"
210 mm
2 3/8"
60 mm
Holders mounted under rear side
of each sliding track.
Rear side of tub
Rear side of tub
Drain pipe fastened with two ties at
each holder.
SITE SPECIFIC
CHOICE
19
Page 20
Power
Reference Copy
Published
Check occasionally
for new editions.
1:11 pm, Jun 05, 2007
The unit must be permanently connected to the
mains.
When used in USA and Canada: All electrical
installations must comply with the US National
Electrical Code and the Canadian Electrical Code
respectively.
Requirements
The unit shall be permanently connected
using the following equipment (not included in
delivery):
•Separate external fuse.
•Ground fault circuit interrupter (10mA).
•Safety switch, according to regulations and
local codes.
•Mains cable (3x16AWG / 3x1.5 mm2).
MarketVoltageFrequencyPower consumption
Europe
N.America
230/240V single phase AC
120V single phase AC
Potential equalization.
Freedom Bath is equipped with a potential
equalization connection. Connect to the potential
equalization connection according to local/national
requirements. (See figure 2.)
50Hz
60Hz
max. 800 VA
max. 800 VA
20
Page 21
Figure 1
Reference Copy
Published
Check occasionally
for new editions.
1:11 pm, Jun 05, 2007
49 3/4"
1265 mm
Warning!- moving parts in this area
Place no cables or connections
under the tub
22"
560 mm
7 7/8"
200 mm
Field wiring box (US)
Figure 2
Potential equalization
21
Page 22
Check Points prior to the Installation
Reference Copy
Published
Check occasionally
for new editions.
1:11 pm, Jun 05, 2007
Always make sure that the following check points are fulfilled and completed prior to the installation.
Reference to values and other information in this manual.
Completed
Water cold/hotpressure, temperature, location, local/national requirements
ARJO Canada Inc.
1575 South Gateway Road
Unit "C"
MISSISSAUGA, ON, L4W 5JI
Tel: 1-800-665-4831
Fax: 1-800-309-1116
E-mail: info@arjo.ca
Web page: www.arjo.com.
ARJO Med AB Limited
St Catherine Street
GLOUCESTER GL1 2SL
Tel: 08702 430 430
Fax: 01452-525 207
USA
ARJO Inc.
50 North Gary Avenue
ROSELLE, IL 60172
Tel: 1-800-323-1245
Fax: 1-888-594-2756
www.arjo.com
...with people in mind.
info@arjo.com
R
D
E
E
G
R
I
S
E
T
FM 24321 ISO 9001
MD 87841 ISO 13485
If your country is not listed here, please contact your local distributor
or: ARJO INTERNATIONAL AB, Box 61, S-241 21 ESLÖV, SWEDEN
Tel: +46 413 645 00; Fax: +46 413 645 63;
www.arjo.com
7000202
MEMBER OF THE GETINGE GROUP
Loading...
+ hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.