Argos ZVEENT-MO-AR ASSEMBLY INSTRUCTIONS

MADE IN
BRITAIN
Dimensions
Width - 117cm
Depth - 39cm
Height - 48.5cm
Venice - Entertainment Unit
If you need help or have damaged or missing parts, call the Customer Helpline: 03456 400800
Issue 2 - 20/01/15
Important - Please read these instructions fully before starting assembly
365/5397
339/1077
Safety and Care Advice
Important - Please read these instructions fully before starting assembly
Warning: This unit weighs approximately 21kgs. Please lift with care.
• Check you have all the components and tools listed on pages 1, 2 and 3.
• Remove all fittings from the plastic bags and separate them into their groups.
• Keep children and animals away from the work area, small parts could choke if swallowed.
• Make sure you have enough space to layout the parts before starting.
• Do not stand or put weight on the product, this could cause damage.
• Assemble the item as close to its final position (in the same room) as possible.
• Assemble on a soft level surface to avoid damaging the unit or your floor (use opened out unit carton).
• We do not recommend the use of power drill/drivers for
inserting screws, as this could damage the unit. Only use hand screwdrivers.
Safety note: If there is any chance of this unit being pulled over by children etc. it is recommended that the unit is secured to a wall using suitable fixings (not supplied).
• Dispose of all packaging carefully and responsibly.
1
Care and maintenance
• Only clean using a damp cloth and mild detergent, do no use bleach or abrasive cleaners.
• From time to time check that there are no loose screws on this unit.
• This product should not be discarded with household waste. Take to your local authority waste disposal centre.
Note: If required the next page can be cut out and used as reference throughout the assembly. Keep this page with these instructions for future reference.
Tools required
Rule Scissors Hammer
Eye protection (when using a hammer or drill)
Cross-head screwdriver
Components - Panels
Please check you have all the panels listed below
2
1
If you have damaged or missing components, call the
Customer Helpline: 03456 400800 quoting the reference
numbers below
4
3
5
6
2
8
7
11
10
12
9
Upright (D1147A)
(152 x 251mm)
Plinth (D1094A)
(1090 x 96mm) x 2
Left Drawer Side (W409LH)
(320 x 105mm)
Right Drawer Side (W409RH)
(320 x 105mm)
Left Side (D1900A)
(448 x 389mm)
Top (D1968A)
(1166 x 391mm)
Right Side (D1901A)
(448 x 389mm)
Drawer Front (D3080A)
(1084 x 200mm)
Shelf (D1911A)
(1090 x 369mm)
Drawer Back (W559)
(1039 x 105mm)
Drawer Base (T559)
(1050 x 317mm)
Back (X939)
(495 x 402mm) x 2
Please check you have all the fittings listed below
3
Components - Fittings
If you have damaged or missing components, call the
Customer Helpline: 03456 400800 quoting the reference
numbers below
A
Wooden dowel (F22) x 4
B
Large metal dowel (F901) x 10
C
D
Large locking nut (F900) x 8
E
Small locking nut (F3) x 2
F
G
Small metal dowel (F893) x 4
H
19mm Screw (F461) x 2
K L
Nail (F51) x 24
Hollow core locking nut (F892) x 4
J
N
Wedgefix (F639) x 6
Note: The quantities below are the correct amount to complete the assembly. In some cases more fittings may be supplied than are required.
mm 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170mm 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170
Ruler - Use this ruler to help correctly identify the screws
O
40mm Screw (F910) x 2
P
Mini block (F25) x 2
Knock-in Peg (F171GY) x 4
13mm Screw (F52) x 6
M
R Runner (F160) x 1
b
L Runner (F161) x 1
M
c
L Runner (F159) x 1
M
a
R Runner (F162) x 1
M
d
13mm Screw (F63) x 6
I
Handle (FBARH128)
Assembly Instructions
If you have damaged or missing components, call the
Customer Helpline: 03456 400800 quoting the reference
numbers below
Step 1
B
F
F
6
Prepare the drawer front
Screw 2 large metal dowels into the holes shown on the back of the drawer front .
Note: Tighten metal dowels up fully against the panels.
B
4
Prepare the drawer sides
Insert a small locking nut into the hole shown on the left drawer side and right drawer side .
Note: Arrow on locking nut must point towards hole in edge of panel.
F
6
7
Step 2
7
F
B
B
B
B
4
Note: Due to the manufacturing process, the holes for the locking nut can be on either surface of the drawer sides.
Step 3
Attach the drawer sides to the drawer front
Push the left drawer side . and right drawer side . onto the back of the drawer front .
Turn the small locking nuts on the left drawer side and right drawer side .
Note: Turn the locking nuts clockwise to secure panels - more than 1/2 a turn.
6 7
4
F
6 7
F
B
B
F
Note: The locking nuts can be on either surface of the drawer sides. Make sure that the small groove is on the inside, as shown.
Groove
6
7
4
4
Loading...
+ 11 hidden pages