Argos Valencia - Under Oven Cabinet, 656-6720, 656-6744, 205-4281, 656-6737 ASSEMBLY INSTRUCTIONS

...
MADE IN
BRITAIN
Dimensions
Width - 60cm
Depth - 59cm
Height - 87cm
Valencia - Under Oven Cabinet
If you need help or have damaged or missing parts, call the Customer Helpline: 08456 400800
Issue 2 - 05/08/14
Important - Please read these instructions fully before starting assembly
hygena
656/5831
656/6720
656/6744
205/4281
656/6737
203/8104
Cabinet
Black Door Pack
Cream Door Pack
Oak Door Pack
White Gloss Door Pack
White HN Door Pack
Safety and Care Advice
Important - Please read these instructions fully before starting assembly
Warning: This unit weighs approximately 16.5kgs. Please lift with care.
• Check you have all the components and tools listed on pages 2, 3 and 4.
• Remove all fittings from the plastic bags and separate them into their groups.
• Keep children and animals away from the work area, small parts could choke if swallowed.
• Parts of the assembly will be easier with 2 people.
• Make sure you have enough space to layout the parts before starting.
• Do not stand or put weight on the product, this could cause damage.
• Assemble the item as close to its final position (in the same room) as possible.
• Assemble on a soft level surface to avoid damaging the unit or your floor (use opened out unit carton).
1
Care and maintenance
• Only clean using a damp cloth and mild detergent, do no use bleach or abrasive cleaners.
• From time to time check that there are no loose screws on this unit.
• This product should not be discarded with household waste. Take to your local authority waste disposal centre.
Note: If required the next page can be cut out and used as reference throughout the assembly. Keep this page with these instructions for future reference.
• We do not recommend the use of power drill/drivers for
inserting screws, as this could damage the unit. Only use hand screwdrivers.
Safety note: It is recommended that this unit is secured to a wall using the brackets supplied.
• Dispose of all packaging carefully and responsibly.
Components - Panels
Please check you have all the panels listed below
2
1
If you have damaged or missing components, call the
Customer Helpline: 08456 400800 quoting the reference
numbers below
2
4
3
Left Side (DPF068A)
(720 x 560mm)
Right Side (DPF069A)
(720 x 560mm)
Base (DPF078A)
(569 x 494mm)
Cross Rail (DPF080A)
(569 x 96mm) x 2
5
Support Rail (DPF112A)
(495 x 105mm) x 4
The front surface of this fascia
is protected with a peel-off film
Appliance Fascia (DPF124B)
(596 x 120mm)
6
Please check you have all the fittings listed below
3
Components - Fittings
If you have damaged or missing components, call the
Customer Helpline: 08456 400800 quoting the reference
numbers below
Tools required
Note: The quantities below are the correct amount to complete the assembly. In some cases more fittings may be supplied than are required.
A
Wooden dowel (F22) x 10
B
Metal dowel (F901) x 8
C
D
Large locking nut (F900) x 8
G H
K
I a
I c
I d
I e
I b
Rule Scissors Hammer
Eye protection (when using a hammer or drill)
Cross-head screwdriver
Ruler - Use this ruler to help correctly identify the screws
mm 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170
J
Electric drill
E
13mm Screw (F79) x 14
Connecting Sleeve (F432) x 2 19mm Connecting bolt (F461) x 2
Bracket (F945) x 8
Leg Bracket (F127) x 2
Leg Socket (F120) x 4
Leg Clip (F128) x 2
16mm Screw (F129) x 16
Leg (F122) x 4
45mm Screw (F65) x 4
F
25mm Screw (F50) x 2
38mm Screw (F933) x 4
Assembly Instructions
4
If you have damaged or missing components, call the
Customer Helpline: 08456 400800 quoting the reference
numbers below
Step 1
B
B
J
J
J
E
1
B
J
E
5mm
150mm
B
B
B
1st 5mm hole
2nd 5mm hole
1
Prepare the left side
Screw a metal dowel into one of the holes shown on the left side . .
Note: Tighten metal dowels up fully against the panels.
Important: The position of the metal dowel depends on where you would like the cross rail to be.
B
1
B
The hole chosen for the metal dowel determines the position of the rear cross rail. This will depend on where the services to the oven will be located.
We recommend that you consult a qualified joiner or kitchen fitter.
Step 2
Prepare the left side
Screw 3 metal dowels into the holes shown on the left side .
Note: Tighten metal dowels up fully against the panels.
Fit a bracket flush to the top edge of the left side , about 150mm in from the groove, see diagram.
Secure the bracket using screw .
Fit another bracket flush to the back edge of the left side , about 5mm down from the top edge, see diagram.
Secure the bracket using screw .
Note: The brackets must be flush with the top/back edge of the panel.
B
1
J
J
1
J
1
E
J
E
Only screw ONE metal dowel into
one of these holes.
Loading...
+ 11 hidden pages