Argos Anderson - 2 Drawer Bedside ASSEMBLY INSTRUCTIONS

MADE IN
BRITAIN
Dimensions
Anderson - 2 Drawer Bedside
Assembly Instructions - Please keep for future reference
If you need help or have damaged or missing parts, call the Customer Helpline: 08456 400800
Important - Please read these instructions fully before starting assembly
Depth - 40cm
Height - 44.5cm
Issue 3 - 03/04/14
258/6357
249/7082
268/3872
Safety and Care Advice
Important - Please read these instructions fully before starting assembly
Warning: This unit weighs approximately 11kgs. Please lift with care.
• Check you have all the components and tools listed on pages 2 and 3.
• Remove all fittings from the plastic bags and separate them into their groups.
• Keep children and animals away from the work area, small parts could choke if swallowed.
• Parts of the assembly will be easier with 2 people.
• Make sure you have enough space to layout the parts before starting.
• Do not stand or put weight on the product, this could cause damage.
• Assemble the item as close to its final position (in the same room) as possible.
• Assemble on a soft level surface to avoid damaging the unit or your floor (use opened out unit carton).
• We do not recommend the use of power drill/drivers for
inserting screws, as this could damage the unit. Only use hand screwdrivers.
Safety note: If there is any chance of this unit being pulled over by children etc. it is recommended that the unit is secured to a wall using suitable fixings (not supplied).
• Dispose of all packaging carefully and responsibly.
1
Care and maintenance
• Only clean using a damp cloth and mild detergent, do no use bleach or abrasive cleaners.
• From time to time check that there are no loose screws on this unit.
• This product should not be discarded with household waste. Take to your local authority waste disposal centre.
Note: If required the next page can be cut out and used as reference throughout the assembly. Keep this page with these instructions for future reference.
Components - Panels
Please check you have all the panels listed below
2
1
4
2 3
Drawer Front (D0211A)
(367 x 176mm) x 2
5
10
Left Side (D2166A)
(422 x 372mm)
Right Side (D2167A)
(422 x 372mm)
Top (D2168A)
(380 x 396mm)
Rail (D2169A)
(347 x 60mm) x 2
Back (X400-370)
(400 x 370mm)
7
Drawer Back (W314-124)
(314 x 124mm) x 2
Drawer Base (T325-367)
(325 x 367mm) x 2
6
8
9
Left Drawer Side (W370-124LH)
(370 x 124mm) x 2
Right Drawer Side (W370-124RH)
(370 x 124mm) x 2
Please check you have all the fittings listed below
Tools required
3
Components - Fittings
Note: The quantities below are the correct amount to complete the assembly. In some cases more fittings may be supplied than are required.
A
Wooden dowel (F22) x 6
B
Metal dowel (F901) x 10
C
D E F
G
Ruler - Use this ruler to help correctly identify the screws
mm 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170
Large locking nut (F900) x 6
Nail (F51) x 10
Small locking nut (F3) x 4
9mm Screw (F73) x 8
9mm Screw (F74) x 4
I
Handle (F847a ) x 2
a
I
Handle screw (F847b) x 4
b
H
Drawer runner (F1004) x 4
Rule Scissors Hammer Eye protection
(when using a hammer or drill)
Cross-head screwdriver
J
Knock-in Peg (F171) x 8
L
Plastic Nail (F91) x 4
K
Wedgefix (F639) x 4
Assembly Instructions
4
Step 1
B
B
B
5
Step 2
Prepare the drawer fronts
Screw 2 metal dowels into the holes shown on the back of each drawer front .
Note: Tighten metal dowels up fully against the panels.
B
5
Prepare the drawer sides
Insert a small locking nut into the hole shown on the left drawer side and right drawer side .
Note: Arrow on locking nut must point towards hole in edge of panel.
Step 3
D
7
8
Attach the drawer sides to the drawer front
Push the left drawer side . and right drawer side . onto the back of the drawer front .
Turn the small locking nuts on the left drawer side and right drawer side .
Note: Turn the locking nuts clockwise to secure panels - more than 1/2 a turn.
7 8
5
D
7 8
x 2
D
B
B
D
5
Small groove
9
Note: Due to the manufacturing process, the holes for the locking nut can be on either surface of the drawer sides.
Note: The locking nuts can be on either surface of the drawer sides. Make sure that the small groove is on the inside, as shown.
D
D
7
8
8
7
Assembly Instructions
5
Step 4
Fit the drawer base
Slide the drawer base down the grooves in the drawer sides and and down into the groove in the drawer front .
Step 5
Fit the drawer back
Fit the drawer back between the drawer sides and .
Make sure that the drawer base fits into the groove in the drawer back .
Hold the drawer back in position and tap the knock-in pegs through the holes in the drawer sides and .
Step 6
6
7 8
5
9
7 8
6
9
9
J
7 8
Attach the handle
Attach a handle to each drawer front using 2 screws .
5
I a
I b
x 2
x 2
x 2
5
11
I a
325mm
J
J
Step 7
Fit the wedgefixes
Turn the drawer assemblies over and slide 2 wedgefixes into the front and back grooves, as shown, and tighten up the screws.
K
J
J
K
K
K
9
7
8
6
8
6
7
5
I b
I b
5
x 2
A
Assembly Instructions
6
Step 8
10mm
A
Finished
front edge
F
H
Rebated
back edge
F
H
c:
b:
a:
Prepare the left side
a: Place 2 runners on
left side . Slide back top of runner and use 2nd hole from the front to fit 1st screw .
b: Slide runner back the
other way and use 2nd hole from the back to fit 2nd screw .
c: Insert 1 large locking
nut into the left side . as shown.
Note: Arrow on locking nut must point towards hole in edge of panel.
Tap in wooden dowel as shown.
Note: Wooden dowels must not stick out from the edge by more than 10mm or they may damage other panels.
Screw 2 metal dowels into the holes shown.
1
H
F
F
C
A
B
1
F
H
F
H
1
Finished
front edge
Finished
front edge
Finished
front edge
F
F
1
1
C
B
B
C
A
Assembly Instructions
7
Step 9
Prepare the right side
a: Place 2 runners on
right side . Slide back top of runner and use 2nd hole from the front to fit 1st screw .
b: Slide runner back the
other way and use 2nd hole from the back to fit 2nd screw .
c: Insert 1 large locking
nut into the right side as shown.
Tap in wooden dowel as shown.
Screw 2 metal dowels into the holes shown.
2
H
F
F
a:
b:
C
Finished
front edge
F
H
Rebated
back edge
F
H
c:
2
A
B
F
H
F
H
F
F
2
2
2
B
B
C
Finished front edge
Finished front edge
Finished front edge
Assembly Instructions
Prepare the 2 rails
Insert 2 large locking nuts into the holes in the 2 rails .
Tap 2 wooden dowels into the ends of the 2 rails .
4
Step 10
Step 11
8
A
A
C
C
C
A
4
4
Fit the 2 rails
Push the 2 rails onto right side as shown.
Use a screwdriver to tighten the 2 large locking nuts fitted to the 2 rails.
Note: Turn the large locking nuts as far as they will go - more than 1/2 a turn.
C
C
B
C
4
2
Plain
chipboard
surface
A
A
C
C
4
Plain
chipboard
surface
Plain
chipboard
surface
Support this rail
until the left side
has been fitted in
the next step.
4
4
2
Assembly Instructions
9
Step 12
Fit the left side
Fit the left side to the 2 rails .
Use a screwdriver to tighten the 2 large locking nuts fitted to the 2 rails .
Note: Turn the large locking nuts as far as they will go - more than 1/2 a turn.
Step 13
1
4
C
4
C
B
B
Prepare the top
Screw 2 metal dowels into the top .
Note: Tighten metal dowels up fully against the panel.
Step 14
B
3
3
Fit the top
Push the top onto side panels and .
Use a screwdriver to tighten the 2 large locking nuts fitted to the inside of the side panels and .
Note: Turn the large locking nuts as far as they will go - more than 1/2 a turn.
3
1 2
1 2
C
C
4
4
1
1
3
2
Assembly Instructions
10
Step 15
b:
Fit the back and plastic nails
a: Square up the unit by
making sure that measurement x to x
equals y to y.
b: Place the back
onto the unit.
Nail around the outside edges of the back .
Note: Nails should be spaced about 150mm apart.
10
E
The measurement from top corner X to bottom corner X must be
equal to the measurement from top corner Y to bottom corner Y
a:
10
y
y
x
E
10
Tap 2 plastic nails into the bottom edge of each of the sides and . .
L
1
2
Stand the unit up for the next step.
L
L
L
L
1
2
x
Assembly Instructions
11
If you need help or have damaged or missing parts, call the Customer Helpline: 08456 400800
and quote the reference numbers on the component pages.
Argos Ltd, 489-499 Avebury Boulevard, Central Milton Keynes, MK9 2NW
Step 16
Fit the drawers
Starting with the bottom drawer, slide both the runners forward and locate the drawer sides and between them, lining up the holes in the drawer wrap with the 2nd 'threaded' holes in the runners .
Working from the inside of the drawer, insert 2 screws through the drawer sides and out into the 2nd threaded hole in the runner .
Note: Do not overtighten the screws . If they catch on the runner you may need to loosen them slightly.
Assembly is complete
G
H
2nd threaded
hole
G
7 8
H
H
G
7
H
ALR3007
G
G
Loading...