Aquatic Industries 6030CTS Installation Manual

Installation Instructions
4-Piece A2 Composite Shower System Models
GENERAL INSTALLATION INFORMATION
Thank you for selecting Aquatic. To insure maximum performance from the Aquatic fixture, please read and follow the instructions and cautions. Carefully inspect the new Aquatic fixture for any shipping damage. If such damage is found, report it to your vendor immediately. Under no circumstances should a damaged Aquatic fixture be installed. Aquatic and it’s Distributor are not responsible for removal or reinstallation costs if a replacement fixture is necessary due to installation of a damaged fixture. Do not make modifications to the Aquatic fixture. This could adversely affect the safety and performance of the Aquatic fixture and void the warranty. Any failure to comply with the installation instructions and cautions may void the warranty. For questions concerning installation and maintenance of the Aquatic fixture, contact Technical Services at 1-800-945-2726.
Items Included
Tub/Shower Shower
Tools Needed
Drill
Hammer Level
3/16"
Drill Bit
Phillips Screw Bit
Hole saw
#10 x 1 ½ self –tapping
washer head screw
OR 1 ½ Galvanized roofing nail
Customer Service (800) 945-2726 • www.aquaticbath.com
Tape
Measure
— 1 —
Safety Glasses
NOTE: Caulk is NOT
needed for this installation.
Installation Instructions
4-Piece A2 Composite Shower System Models
PLEASE READ ALL INSTALLATION INSTRUCTIONS COMPLETELY BEFORE BEGINNING THE INSTALLATION.
PRE-INSTALLATION PLANNING
1. Review job print and Aquatic rough-in dimensions; verify all key dimensions against actual job conditions. MUST INSURE ROUGH DIMENSIONS ARE PROPER AND SQUARE.
2. Locate studs as required and in remodeling, if necessary, add studs at each end to provide a vertical nailing surface for the side nailing flanges of the Aquatic fixture.
3. Make sure framed-in framing pocket is of proper size, square and plumb; check floor for level. Some shimming between the stud frame and fixture may be required.
4. DO NOT install the product over open floor joist. Product should not require any additional support if the subfloor is square and level with framing. Shimming or foundation material may be required for additional support, if subfloor is uneven.
5. If fire-rated framing pocket is required, approved finish material must be in place prior to unit installation to meet fire safety requirements of local building code and/or FHA/HUD Minimum Property Standards. NOTE: Finished framing pocket must have interior dimensions shown on rough-in diagram to permit installation of unit.
6. Foundation material is not required.
7. Provide 6” (150mm) floor opening for 2” (50mm) IPS and drain connection.
8. To ensure proper installation of the fixture, all local plumbing and building codes must be observed. Local building codes vary by location and you are responsible for insuring plumbing is complete and to code.
9. To avoid obstruction, make sure that supply lines and valve plumbing do not project into framing pocket during the installation process. Also, drain pipe must not project above floor level prior to installation.
10. On inside of plumbing wet wall of unit, note location of supply elbow and mixer valve. (See “Tub and Shower Mounted Fittings” below.)
11. To prevent scuffing while installing unit, cover the floor of the unit with a piece of cardboard or other protective material.
12. Fasteners for: Wood framing – 1 1⁄2 concrete nails and nailing tool. Steel studs (18 ga.) – drill flanges and studs with 5⁄32 NOTE: Always pre-drill no matter what fastener is to be used.
13. If installing shower door refer to the shower door manufacturers installation instructions for any special considerations.
14. NOTE: Where local codes specify minimum door openings, shower stalls may require swing doors. (Sliding doors may not provide a wide enough opening.)
15. 3232CS does not carry UPC seal and is not approved by some municipal plumbing codes due to inside dimensions. Check local building codes.
” galvanized roofing nails or #10 x 1 1⁄2
” carbide bit and use #12 x 1” sheet metal screws.
” self-tapping washer head screws. Concrete or block walls – 1”
Tub and Shower Mounted Fittings: If mounting fittings on tub or shower, from stable reference points (back wall studs, floor), measure
the locations of spout and valves. Note measurements:
Tub Filler: ________________________________________________ Valve: _____________________________________________
Shower Arm: _____________________________________________ Valve: _____________________________________________
(Mark dimensions only if shower arm is plumbed within bath fixture wall area.)
Customer Service (800) 945-2726 • www.aquaticbath.com
— 2 —
INSTALLATION PROCEDURE
1A 1B
Installation Instructions
4-Piece A2 Composite Shower System Models
DD
C
B
B
6"x12"
Check dimensions. For tub-showers, refer to Diagram 1A; for showers, refer to Diagram 1B.
NOTE: If you’re adding additional accessories such as a grab bar–additional framing may be needed for support.
Models A B C D
6030CT/CTM 60” 311⁄4 6030CTMIN/CTMM 60” 311⁄2 6032CTMIN/CTMM 60” 331⁄2 6036CT/CTM 60” 371⁄2 6042CT/CTM 60” 431⁄2 3232CPAN 32” 32” 16” 151⁄2 3636CPAN 36” 36” 18” 171⁄2 4834CPAN 48” 34” 24” 161⁄2 6034CPAN 60” 34” 30” 161⁄2 6030CPAN 60” 30” 81⁄2
Pre-install unit to ensure framing pocket is plumb, square and a level installation can be achieved (see steps 3 through 9).
Adjust framing as needed – Shim where necessary.
C
AA
AA
27⁄8 23⁄4 23⁄4 2 173⁄8 2 203⁄8
141⁄4 145⁄8 153⁄4
14”
32
C
” ” ” ” ” ” ” ”
Additional stud may be required for vertical backwall flange. Stud @ 7 for easier installation.
7
8” CL from back, on both sides. Stud can be turned
77⁄8"
DD
B
B
C
6"Dia.
L
C
AA
DD
CC
6"Dia.
*Review Tech Data at a2bath.com for more detail. Note: 6030CTS is shown for illustrational purposes.
4
Lift and place the base into framing.
Customer Service (800) 945-2726 • www.aquaticbath.com
5
Level and mark all sides. Front apron should be firmly on the floor.
— 3 —