Installation Guide SMT 2200/3000 VA
Input/Output Hardwir e Kit
Safety
Adhere to all national and local electrical codes. A certified electrician must perform all electrical
connections.
1. Disconnect equipment connected to the UPS.
2. Press the OFF button located on the front of the UPS.
3. Disconnect the bat teries in the UPS.
4. Disconnect the UPS from utility power.
NOTE: When removing the panels from the UPS, note which cable is connected to the AC input. There are two
4-pin connectors on the UPS and they are not interchangeable.
Inventory
Note: The illustrations in this document may differ slightly from the actual hardware.
Terminal block
Termina l bl ock la bel
2 screws secure the
terminal block to the UPS
Input panel
Output panel
Blank panel
4 grounding screws 8 screws
secure input, output, and
blank panels to the UPS
2 wire nuts
Installation
Note: It is recommended that the input and output cables be connected to the terminal block prior to
installing the terminal block in the UPS.
Remove the five screws that secure the factory
installed PDU panels to the UPS.
Save the screws.
Disconnect the PDU input a nd output cables as
shown in the diagram.
C Input Connector
su0669b
Secure the replace ment input and output panels
(supplied), to the UPS. Sec ure the panels with
four of the screws removed from the factory
installed PDU panel.
Instal l ap p r op r i at e str a in r el ie f clamps (no t
supplied), to the input and output panels as
shown in the diagram.
Hardwire Kit SMT2200/3000 VA 100/120/ 230 VAC Tower2
su0670a