Anvil America BMA7102 Installation Manual

INSTRUCTION MANUAL
HOT FOOD BAR
BMA7102
BMA7103
INSTALLATION, OPERATION AND CARE OF
BMA7102 TWO DIVISION HOT FOOD BAR BMA7103 THREE DIVISION HOT FOOD BAR
_____________________________________________________________
THIS INSTRUCTION BOOKLET COVERS THE ENTIRE RANGE OF BAINMARIES, HOT FOOD BARS AND FOODWARMERS. PLEASE ENSURE THAT YOU CHECK THE MODEL NO. AT THE REAR OF THE UNIT AND FOLLOW THE SPECIFIC INSTRUCTIONS PERTAINING TO THE RELEVANT PRODUCT.
INSTALLATION
UNPACKING: Unpack the product and check for any damage incurred during transit. This should be reported to the responsible carrier, railway or postal authority, and a request for a damage report should be made. Remove all the packaging materials and tape, as well as any protective plastic from the machine. Clean off any glue residue left over from the plastic or tape.
GENERAL INSTALLATION AND OPERATION INSTRUCTIONS:
1. Place the unit in the desired position and level tank using the adjustable feet provided.
2. Fill the tank with water to the desired level as indicated in the specific operation
IT IS ESSENTIAL TO MAKE SURE THAT THE INCOMING VOLTAGE IS THE SAME AS THE RATED VOLTAGE OF THE UNIT AS FOUND ON THE SERIAL PLATE. THE SERIAL PLATE IS LOCATED AT THE REAR OF THE UNIT ADJACENT TO THE INCOMING CABLE ENTRY.
instructions section.
3. Place the desired number of inserts into position and switch the energy control to the required temperature.
4. The unit is equipped with one pilot light that will remain illuminated when the when the heating element is energized.
5. Ensure that the tank water level is always maintained.
SPECIFIC OPERATING INSTRUCTIONS:
BMA7102/ BMA7103 - HOT FOOD BAR
THESE INSTRUCTIONS MUST BE FOLLOWED FOR US TO GUARANTEE OUR FULL SUPPORT OF YOUR CLAIM FOR PROTECTING AGAINST LOSS FROM CONCEALED DAMAGE. THE FORM FOR FILING SUCH A CLAIM WILL BE PROVIDED BY THE CARRIER.
An energy regulator controls the tank element, which is located on the control panel. The overhead heat lamps light up immediately when the appliance is connected.
DRY OPERATION
1. Place all the pans in the food bar and switch on the unit. Set the energy regulator to the desired position and allow the food bar to pre-heat for approximately 15 minutes before placing any food in the pans. An operating position of around 2 to 3 should suffice, but experience will dictate the best position for the particular food being displayed.
2. Please note: Care should be taken while operating dry not to leave the energy
regulator on position 6 for extended periods. The build up of excessive heat may damage the unit.
WET OPERATION
1. For wet operation, the most important factor is the volume of water placed in the tank. If the water level is too high, performance will be compromised. The water level should be between the indicated mark “H” (max) and “L” (min) found on the inside of the tank.
Loading...
+ 5 hidden pages