
Copyright © 2010 by
ALL rights reserved. Information in this document is subject to change without notice. Companies, names and data used
in examples herein are fictitious unless otherwise noted. No part of this document may be reproduced or transmitted in
any form or by any means, electronic or mechanical, for any purpose, without express permission of Anthony Manufac
turing Co., Inc.
Anthony products identified in this manual are designed and certified to meet or for safety, and for sanitation standards.
Each customer is responsible for final site approval.
-

Table of Contents
TABLE OF CONTENTS
Preliminary Considerations for Door and Frame Servicing Procedures . . . . . . . . . . . . . . . . . . . . . . . . 1
Safety .................................................................................................................................................. 1
Tools.................................................................................................................................................... 1
Tips...................................................................................................................................................... 1
FRAME INSTALLATION AND SERVICE MAINTENANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
Shimming............................................................................................................................................. 2
To Install the Frame............................................................................................................................. 3
Frame Electrical Wiring Connections .................................................................................................. 4
DOOR INSTALLATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
To Install the Door Assembly............................................................................................................... 5
To Remove the Door Assembly........................................................................................................... 6
TorqueMaster™ and SAG Adjustment ............................................................................................... 7
Removing and Replacing the Door Rail Plastic Cover ........................................................................ 7
Install New Replacement Plastic Covers............................................................................................. 9
11/4/2010 i 99-18690-I001_A

Table of Contents
11/4/2010 ii 99-18690-I001_A

Instructions
Preliminary Considerations for Door and Frame Servicing Procedures
Safety
Proper safety equipment includes:
safety glasses work gloves work shoes
NOTE: TURN OFF ALL ELECTRICAL POWER PRIOR TO BEGINNING
WORK ON THE DOOR OR ON ANY ELECTRICAL. USE EXTRA CAUTION
WHEN WORKING WITH OR AROUND THE DOOR GLASS PACKAGE.
NOTE: DO NOT USE POWER TOOLS FOR THE FOLLOWING
PROCEDURES
Tools
Tools required for this procedure include:
- #2 Phillips-head screwdriver - Flat-head screwdriver
- Needle-nose pliers - Rubber or plastic mallet
- 7/16” and 1/2” Hand Wrench - 5/32” Hex Key
- Wire stripper and cutter - Soldering iron
- Heat Gun - Razor Knife
Tips
• Complete replacement of wire assemblies is recommended whenever required. Splice wires only if necessary
using proper materials such as, electrical tape, wire nuts, flux core solder and heat shrink.
• Apply liquid soap to rail plastic covers and gaskets upon installation to facilitate insertion into mounting grooves.
• Keep doors and frames clean for product efficiency. This can also help reduce energy consumption and potential health hazards.
• Whenever binding gasket or plastic parts, use food grade silicone.
11/4/2010 1 99-18690-I001_A