
Disposal of Electronic Equipment WEEE Directive 2002/96/EC
Description – Aspen LED Linklight
® Installation Instructions
Luminaire Code(s) –
ALEDKL/__
General Installation Instructions
These instructions should be read carefully prior to any installation and retained after completion for further reference and
maintenance. Please give these instructions to the building owner/occupier after installation.
Important Safety
1. Before installation, maintenance or lamp replacement, ensure that the mains supply to the luminaire is switched off and the circuit supply fuses are removed or
the circuit breaker is turned off.
2. It is recommended that only a qualified electrical contractor carries out the installation of this luminaire and that the luminaire is installed in compliance with the
current edition of the IEE Wiring Regulations.
3. The person carrying out the installation is to check and verify that the total load on the circuit, including that of this luminaire does not exceed the rating of the
circuit cable, fuse or circuit breaker.
4. Where a luminaire incorporates discharge control gear (inductive load), the circuit capacity and ratings require careful sizing to avoid nuisance tripping of the
protective device used in the installation.
5. Where applicable, careful consideration should be taken during installation to ensure that all fixings and/or suspensions are of a suitable size for the luminaire
being installed.
Ratings
1. All luminaires are manufactured & tested in compliance with the requirement contained within BS EN 60598 and are CE marked.
2. All luminaires that are of Class 1 construction and that are marked accordingly, MUST be earthed.
3. All luminaires are designed to operate at 230Volts AC -6%/+10% = 216Volts to 252Volts. Do not operate outside these voltages.
4. All luminaires are only suitable for applications within their rated Ingress Protection limits as stated.
-------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Installation
• Select a suitable mounting location to install the LED linklight. Care should be given to ensure adequate ventilation for luminaire. This
luminaire is not suitable for high temperature areas.
• Fix the supplied mounting brackets x 2 onto the intended surface.
• Clip the LED strip into place.
• Using the supplied mains lead, connect to a 230V supply. Please check the orientation of the female / male plugs are correct when
connecting.
• Two or more fittings can be connected directly together if required, connecting together the corresponding male to female plugs
connections.
• Ensure all connections and fittings are connected together and securely.
• Restore the power supply and test for correct operation.
• Maximum 12 fittings run.
-------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Maintenance:
1. This luminaire contains no serviceable parts.
Blue / Black
Brown / Red
-------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
www.anselluk.com
This product falls within the scope of the Waste Electrical & Electronic Equipment Directive
(WEEE), which means the product should not be disposed of as normal household waste.
Ensure that this luminaire and lamp is disposed of in accordance with the WEEE Directive.
Contact a local Council Waste Dept. Local Amenity Site, or the Environment Agency for
further information. RoHS - All components and materials used in this product are RoHS
Issue Date: td 20120621
IP20