Anchor NAVI-TRAC 50 WIDE GABLE User Manual

Assembly Instructions
Navi-Trac® Frame Tent
50’ Wide Gable End System
Please read all assembly / installation instructions before the installation or removal of this product.
WEB
EC4714
EVANSVILLE, INDIANA
2.3”
1100 Burch Dr., Evansville, IN 47725
Ph. 812-867-2421 • Fax. 812-867-0547
E-mail: tents@anchorinc.com • www.anchorinc.com
NAV50GE 1113
Table of Contents
Page No. Assembly Step
3 Introduction Inspect Site Frame Terminology
4 Component Illustrations
5 50’ Navi-Trac Component List Table
6 50’ Navi-Trac Component List Table Cont’d
7 Safety Guidelines
8 Squaring the Tent - Footprint Layout
9 Web Guy - Staking Guidelines Assembling the first Beam
10 Layout of all Beams Erecting second Beam first
11 Connecting the First Two Beams
12 Installing Purlins Completing First Bay Completing the Top Frame Installing the Gabled End Frame
13 Installing Guy Webs X-Cabled Bays
14 Installing Mid Panels Installing Gabled End Panels
15 Fabric Tensioning
16 Completed Gabled End Unit Illustration Alternate Hip End/ Gabled End Configuration
17 Combining Hip and Gabled End Assembly Steps Component Changes for Hip/ Gabled End Configuration
18 Diagonal Beam Brace
19 Wall Installation
20 Ground Bar Keeper
21 Limits of Liability
2
INTRODUCTION:
Like the hip-end version, the gabled end NAVI-TRAC frame is made up of extruded aluminum members joined by weldments. The alu­minum frame members themselves are extruded with channels into which the NAVI-TRAC fabric “kedar” is fed. However, the gabled end version of the Navi-Trac differs from the Hip End version in a number of ways:
1. All the beams are parallel to each other.
2. Beam base plates are hinged for pivoting to a vertical position. End Upright plates are fixed, non-pivoting.
3. The eave fittings are the MCW style that allows a simple drop-in action for purlin installation, rather than the slip joint of the hip end configuration.
4. Fabric middle bays are installed into the channels of adjacent beams one bay at a time.
5. Gabled End fabric is installed simply into the outer channel of the end beams and tensioned to the Gabled End uprights.
6. X- cabling extends into the overhead rafter area to compensate for the lack of hip end support.
7. Corner guys are in one direction only, parallel to the beams.
It is possible to combine the hip end and gabled end styles within one building unit (see kit #3); however, this assembly manual focus­es on the gabled end configuration only. The last few pages describe the hip/gabled combination and refer the customer to the hip end assembly manual for the hip end part of the building unit.
INSPECT SITE CAUTION:
Consult your local utility locator service or the National Utility Locating Contractors Association (NULCA) prior to installation. Prior to actual tent assembly, be sure to look up, down, above & below for obstacles, pipes, wires, trouble, etc.
MCW
GRW
EE10
UG-15
UGT
UG-5
50’ Gabled Navi-Trac Frame Terminology
RW
P1, P2 OR P3 Dependent upon mid bay width.
R5-7
R21-9
B4
U8
BHW
BFW
EW15
X-10, 11 or 12 Dependent upon mid bay width.
XRB
MCW
X-1, 2 or 3 Dependent upon mid bay width.
X-4, 5 or 6 Dependent upon mid bay width.
P1 for 20’ bay only.
RWE
ER10, 15, or 20 Dependent upon mid bay width.
30” Stake at Base Plates
42” Stake for each Guy
See Component List Table on Pages 5 & 6 for component descriptions.
3
50’ NAVI-TRAC COMPONENT ILLUSTRATIONS
INSTALLATION TOOLS
4
50’ NAVI-TRAC COMPONENT LIST
A MINIMUM GABLED UNIT CONSISTS OF (1) KIT #1, (1) KIT #2 AND (2) EXTENSION
MIDS. TO EXTEND THE LENGTH FURTHER, SIMPLY ADD ADDITIONAL EXTENSION MIDS.
STARTER MIDS ARE REQUIRED WITH HIP ENDS ONLY.
I.D. CODES 50’ GABLED END NAVI-TRAC
LABEL
(LETTER ON
DRAWING)
COMPONENT DESCRIPTION
(STAMPED OR
TAPED)
EXTRUSIONS W/CHANNELS
E10 EAVE - FEMALE 10’ 9 4
E15 EAVE - FEMALE 15’ 4
ER10 EAVE/RIDGE - DROP-IN 10’ 33
ER15 EAVE/RIDGE - DROP-IN 15’ 3 3
ER 20 EAVE/RIDGE - DROP-IN 20’ 3 3
EE-10 EAVE/GABLED END, DROP-IN 10’ 2 2
EW-15 EAVE/GABLED END, DROP-IN 15’ 2 2
R16-2 RAFTER INTERMEDIATE, 16’-2” 4
R5-7
RAFTER UPPER SPLICE, 5’-7 W/BOLT
*
R21-9 RAFTER 21’-9 2 2 2 2 2 2 2 2
H21-4 HIP LOWER SPLICE (2 PC) 21’-4 2
H15
HIP UPPER SPLICE (2PC) 15’ W/BOLT
*
BRACES
B2 HIP BRACE, 18’-9 (W/LANYARDS) 4
B3 BRACE, RIDGE 9’-6” 1 11111
B4 BRACE, UPRIGHT, 3’-9” 5 2 22222
GBL
GBL
KIT
1
KIT
2
HIP KIT
3
20’ MID STR
20’
MID EXT
15’
MID
STR
15’
MID EXT
10’ MID STR
10’
MID
EXT
2 2222222
2
PURLINS
P1 PURLIN 10’ 22 22
P2 PURLIN 15’ 22
P3 PURLIN 20’ 22
UPRIGHTS
U8 UPRIGHT - 8’ 2 7 2 2 2 2 2 2
UG-15 END UPRIGHT - 14’-2” 3 3
UG-5 END UPRIGHT SPLICE, 5’ 2 2
WELDMENTS, FITTINGS & PLATES
BFW ADJ. BASE PLATES W/INSERTS (FIXED) “END” 3372 2 2
BHW ADJ BASE PLATEW/INSERTS (HINGED) 2 2 2 2
CW CORNER WELDMENTS 2
EIW END INTERMEDIATE WELDMENTS 5
MLW MID LEFT WELDMENTS 2 2 2
MRW MID RIGHT WELDMENTS 2 2 2
MCW MID CENTER WELDMENTS 2 2 2 2
RW PEAK/RIDGE WELDMENT 1 1 1 1 1 1
RWE GABLED END RIDGE WELDMENT 1 1
GRW GABLED END UPRIGHT RAFTER WELD. 2 2
UGT GABLED END UPRIGHT TOP INSERT 3 3
XRB X-CABLE RAFTER BRACKET 8 8
TFW TOP FITTING (END RAFTER) W/HDWR 1
EFW END FITTING (HIP/INT. RAFTER) W/HDWR 8
CONTINUED ON NEXT PAGE
5
50’ NAVI-TRAC COMPONENT LIST
CONTINUED FROM PREVIOUS PAGE
I.D. 50’ GABLED END NAVI-TRAC
LABEL
(LETTER ON
DRAWING)
X-1
X-2
X-3
X4
X5
X6
X10
X11
X12
COMPONENT DESCRIPTION
CABLES
CODES
(STAMPED OR
TAPED)
GBL
GBL
HIP
20’
20’
15’
15’
10’
KIT
KIT
KIT
MID
MID
MID
MID
MID
MID
1
2
3
STR
EXT
STR
EXT
STR
EXT
**OPTIONS OF 10’,15’, OR 20’ BAYS MUST
BE SPECIFIED.
10’
1/2” TENSION LOCK PINS - CROSS CABLE 2 2 2 2 2 2 2 2
UPRIGHT X-CABLES FOR 10’ MID BAY** GREEN
NAV-BAY10-U8
UPRIGHT X-CABLES FOR 15’ MID BAY** GREEN
NAV-BAY15-U8
UPRIGHT X-CABLES FOR 20’ MID BAY** GREEN
NAV-BAY20-U8 LOWER ROOF X-CABLES FOR 10’ MID BAY A** LOWER ROOF X-CABLES FOR 15’ MID BAY A** LOWER ROOF X-CABLES FOR 20’ MID BAY A** UPPER ROOF X-CABLES FOR 10’ MID BAY C** UPPER ROOF X-CABLES FOR 15’ MID BAY C** UPPER ROOF X-CABLES FOR 20’ MID BAY C**
RED
NAV-BAY10
RED
NAV-BAY15
RED
NAV-BAY20
BLUE
NAV50-BAY10
BLUE
NAV50-BAY15
BLUE
NAV50-BAY20
[4] [4]
[4] [4]
[4] [4]
44
44
44
44
44
44
INSTALL AS SPECIFIED FOR
UNITS 100’ +
INSTALL AS SPECIFIED FOR
UNITS 100’ +
INSTALL AS SPECIFIED FOR
UNITS 100’ +
INSTALL AS SPECIFIED FOR
UNITS 100’ +
INSTALL AS SPECIFIED FOR
UNITS 100’ +
INSTALL AS SPECIFIED FOR
UNITS 100’ +
INSTALL AS SPECIFIED FOR
UNITS 100’ +
INSTALL AS SPECIFIED FOR
UNITS 100’ +
INSTALL AS SPECIFIED FOR
UNITS 100’ +
BOLTS AND HARDWARE
LANYARD ASS’Y W/HAIRPIN COTTER 8
1/2”-13 x 3” BOLT W/NYLOCK NUT 8 6 18 2 2 2 2 2 2
1/2”-13 x 3 1/2” BOLT W/NYLOCK NUT 7 7
INSTALLATION TOOLS
LOWER SAFETY STRAP W/RATCHET 4
UPPER SAFETY STRAP FOR 10’ BAYS 4
UPPER SAFETY STRAP FOR 15’ BAYS 4
UPPER SAFETY STRAP FOR 20’ BAYS 4
LONG LIFTING CRADLE 1
PUSH POLE EXT. (FOR LONG CRADLE) 1
SHORT LIFTING CRADLE 1
ADJ. BASEPLATE GUIDE BAR 2
FABRIC PULL ROPES 2
WHEELED PANEL GUIDES 2
DROP CLOTH (8’ x 30’) 1
Other component notes:
1. For X-Cables for units 100’ or longer, see page 13 for quantities and installation.
2. Stakes and Guys are not included in this table. See staking guidelines on Page 9.
6
NAVI-TRAC Installation Safety Guidelines
Your installation techniques will evolve to fit the needs of your clients, the experience level of your crews, the nature of other tentage on-site, and the equipment that you have most readily available. We encourage you to begin with a crew of (4) workers and only reduce this number as your experience level allows you to do so safely. Whatever techniques you adapt for your crews, we encourage you to keep safety utmost in mind.
Please read through this assembly manual completely before beginning your installation. Be sure the proper equip­ment, crew and safety precautions are in place. We hope that you enjoy the design features of the NAVI-TRAC each time the unit is installed.
1. It is recommended that workers wear safety shoes and hard-hats on site.
2. When moving beam sections by hand, use proper lifting techniques to protect the back, and avoid pinching fingers while making hardware connections.
3. Never permit bystanders or uninvolved to stand or walk even briefly in the falling path of a beam as it is being raised or lowered.
4. Be aware to avoid contact of beams with any overhead power lines near the site.
5. When anchoring the structure, avoid all underground power lines and gas lines or other utility easements. Local authorities should be able to map the location of these obstacles.
6. Keep site clear of debris to avoid tripping, especially while carrying components or bundles of fabric.
7. Do not drag bundles of fabric on concrete, asphalt, or ground as this can cause damage to the fabric from abrasion through the bag.
8. When lifting the NAVI-TRAC Hip End frame (See Appendix), be sure to use the heavy duty NAVI-TRAC frame lift. The standard Anchor frame lift was not designed for the weight of the NAVI-TRAC frame. When lifting each side of an end section, (2) NAVI-TRAC frame lifts should be used.
9. Before pivoting beams to vertical, clear the area of items that could cause tripping or slipping.
10. Before pivoting middle beam, install the cross-cable for safety bracing. On the 50’ NAVI-TRAC, the cross-cable should be left in place as an essential part of the structure.
11. NOTE: Hinged baseplates are used on all beams in the Gabled End Configuration. However, if the Hip End is constructed on either, or both ends of the unit, the base plates in the hip end module should all be the non-pivoting, fixed plates. Use of hinged baseplates in the end module could cause the end module to collapse during installation.
12. When using ladders to make peak connections, be sure the ladder is tall enough that workers can reach the peak from a ladder step consistent with the safety recommendations for the ladder being used. On middle beams, secure the eaves before climbing the ladder to secure the peak.
13. For any Gabled End NAVI-TRAC of 100 ft or more in length, one middle bay must be cross-cabled both in the over head and at ground level in an “X” fashion on both sides for each 100 ft of length (see illustra­ tion on page 13).
14. For proper loading and anchoring information, consult the appropriate NAVI-TRAC blueprint available from Anchor Industries Inc.
15. If a Hip End is used on either end of the unit, before installing fabric, verify that all hip, brace, and rafter pins are seated into weldment fittings and secured by lanyard pins.
16. The installation method described herein requires coordination of tasks between workers. A
safe installation is dependent on alertness and coordination.
17. Before lifting Gabled End top frame to install uprights, always guy out and stake at least both corners of the side or end being lifted. This will help maintain the intended footprint and will protect against uplift
from the wind that could move or flip the tent, causing damage to the tent and/or severe injury to workers.
7
SQUARING THE TENT FOOTPRINT LAYOUT
BASE PLATE
A
LENGTH OF TENT
D
LOCATING THE FOUR PRIMARY CORNERS
DIAGONAL
DIAGONALS MEASURED TO
CENTER OF BASE PLATE
STAKE HOLES.
WIDTH OF TENT
B
DIRECTIONS FOR SQUARING THE TENT
1. USE A TAPE MEASURE TO MARK THE ENDS OF A LINE FOR ONE END (“A” TO “B” ABOVE) EQUAL TO THE EXACT WIDTH OF THE UNIT. NOTE: FOR EASIER INSTALLATION, MARK THE WIDTH FROM STAKE HOLE TO STAKE HOLE OF THE BASEPLATES, AS SHOWN IN BELOW CHART.
2. HOLD THE “0” END OF ONE TAPE AT POINT “A” AND THE “0” END OF ANOTHER TAPE AT POINT “B”.
3. EXTEND THE FIRST TAPE ALONG ONE SIDE OF THE UNIT TO A MEASUREMENT EQUAL TO THE EXACT LENGTH OF THE TENT.
4. CONSULT THE CHART BELOW TO FIND THE DIAGONAL FOR THE TENT YOU ARE BUILDING.
5. EXTEND THE SECOND TAPE TO A MEASUREMENT EXACTLY EQUAL TO THIS DIAGONAL.
6. BRING THE TWO TAPES TOGETHER SO THAT THE LENGTH MEASUREMENT OF ONE LIES DIRECTLY ON THE DIAGONAL MEASUREMENT OF THE OTHER. PULL THE TAPES TIGHT AND MARK THEIR INTERSECTION. THIS WILL LOCATE A FAR CORNER (POINT “D” ABOVE).
7. SWITCH TAPES SO THAT TAPE 1 (ABOVE) MEASURES THE DIAGONAL AND TAPE 2 (ABOVE) MEASURES THE LENGTH. THIS WILL LOCATE POINT “C” ABOVE.
8. WITH THE FOUR PRIMARY CORNERS LOCATED, LAY OUT BASEPLATES AND UPRIGHTS ACCORDING TO THE NUMBER OF BEAMS TO BE INCLUDED IN THE BUILDING UNIT. MEASUREMENTS GIVEN ARE TO THE CENTER OF THE STAKE HOLE OF EACH PLATE.
C
DIAGONALS FOR SQUARING FOOTPRINT
LENGTH OF TENT
DIAGONAL SHOWN IN FEET-INCHES (TO NEAREST INCH) - - TO CENTERS OF STAKE HOLES.
STAKE HOLE)
(STAKE HOLE TO
WIDTH OF TENT
8
WEB GUY - STAKING GUIDELINES
REQUIRED DISTANCE OUT BETWEEN FRAME UPRIGHTS AND STAKE LINE IS EQUAL TO THE UPRIGHT HEIGHT. (FOR EXAMPLE, 8’ UPRIGHT = 8’ STAKE-OUT DISTANCE.)
(1) 30” Stake through base plate. Drive into ground as far as possible.
42” Stake driven through stake plate. Stake must be driven into ground as far as possible. (1) per upright as shown for Gabled End Units.
ASSEMBLE FIRST BEAM
CAUTION: BRACES
REQUIRED TO AVOID
FRAME DAMAGE!!
MCW)
11
12
(1) STAKE PER
2
BASE PLATE
15
1
20
16
XRB (2) FOR X-CABLED BEAMS ONLY
U8
BHW
UPRIGHT HEIGHT
STAKE-OUT DISTANCE =
RW ON MID BEAMS, RWE ON END BEAMS
9
10
B3 *
GRW (FOR END BEAMS ONLY)
MAKE CONNECTIONS IN NUMBER SEQUENCE SHOWN. STAKE PLATES BEFORE ERECTING.
8
R5-7
7
1718
C50 *
B4
19
R21-9
6
14
13
(1) STAKE PER
4
BASE PLATE
5
3
* NOTE: B3 AND C50 ABOVE ARE NOT REQUIRED ON BEAMS THAT HAVE GABLED END FRAMEWORK ATTACHED.
9
LAYOUT OF ALL BEAMS
IMPORTANT NOTE: IF YOU WILL BE USING THE OPTIONAL DIAGONAL BEAM BRACES, LAY OUT ALL BEAMS IN THE
SAME DIRECTION, DO NOT BUTTERFLY. SEE DIAGONAL BEAM BRACE USE AT THE BACK OF THIS MANUAL.
UPPER ENDS OF ALL X­CABLES ATTACHED BEFORE BEAMS ARE RAISED.
FIRST (2) BEAMS BUTTER­FLIED SO THAT ADJACENT BASE PLATE STAKES CAN BE USED FOR SAFETY GUYING. (2ND BEAM WILL BE RAISED FIRST.)
ADJUST BASE PLATE GUIDE BARS FOR PROPER SPAC­ING AND ALIGNMENT OF BASEPLATES. (DROP BAR FITTING OVER PINS IN BASE PLATES.)
ALL BASE PLATES ARE STAKED USING 30” STAKES.
2-PC SAFETY WEBS:
1. LOOP (4) LOWER SAFETY WEBS OVER STAKE HEADS OF THE ADJACENT BASE PLATES, BEAMS 1 & 3 (RATCHET ENDS UP).
2. CHOOSE (4) UPPER SAFETY WEBS LABELED FOR 10’, 15’, OR 20’ BAY SPAC­ING, AS NEEDED FOR YOUR UNIT.
3. ON THE TRAILING WEBS (TO BEAM #3), INSERT THE LOOSE, HANGING ENDS OF UPPER WEBS INTO THE RATCHETS OF THE LOWER SAFETY WEBS. PULL ABOUT 1 FT OF WEB THRU THE RATCH­ET. LEAVE PLENTY OF SLACK.
4. SNAP UPPER ENDS OF UPPER WEBS TO THE EAVE BRACKETS OF THE BEAM TO BE RAISED.
5. LEAVE THE LEADING WEBS (TO BEAM #1) LOOSE AND HANGING UNTIL BEAM IS UP.
ERECTING 2nd BEAM 1st
ATTACH PUSH POLE EXTENSION TO TOP OF THE LONG LIFTING POLE. HOOK INTO PEAK WELDMENT BRACKET & TWIST TO SECURE. THIS WORKER CONTROLS PEAK DURING ERECTION.
WORKERS LIFT FIRST AT THE PEAK, THEN SHUFFLE SIDEWAYS TOWARD THE UPRIGHTS.
AS THE 2ND BEAM PIVOTS TOWARD VERTICAL, THE TRAILING SAFETY WEBS DRAW TIGHTER.
10
SECURING THE 1st VERTICAL BEAM
ON THE LEADING 2-PC SAFETY WEBS, WORKERS INSERT LOOSE ENDS OF UPPER SAFETY WEBS INTO THE RATCHETS OF THE LOWER SAFETY WEBS.
USING RATCHETS, ADJUST LEADING AND TRAIL­ING SAFETY WEBS AGAINST EACH OTHER ON BOTH SIDES OF THE STRUCTURE TO SECURE AND VERTI­CALLY ALIGN THE BEAM.
ERECTING THE 2nd BEAM
WITH THE 2ND BEAM SECURED BY SAFETY WEBS IN BOTH DIRECTIONS, THE 1ST BEAM IS ROTATED TOWARD IT. (2) OR (3) WORK­ERS SHOULD HOLD THE BEAM AT VERTI­CAL UNTIL EAVE BARS (ER10, 15 or 20) ARE INSTALLED (SEE NEXT STEP)
SECURING THE 2nd BEAM WITH DROP-IN RIDGE/EAVE BARS
DROP ONE HOOK END OF BAR INTO EAVE FITTING.
DROP-IN RIDGE/EAVE BARS CON­NECT 1st AND 2nd BEAMS. DROP ONE HOOK END OF BAR INTO EAVE FITTING. USE LIFTING CRADLES TO POSITION 2nd END.
USE LIFTING CRADLES TO POSITION 2nd END.
11
INSTALLING PURLINS AND RIDGE BARS
USE SAME TECHNIQUE AND THE LONG LIFTING POLE WITH CRADLE TO INSTALL THE PURLINS AND RIDGE EAVE BAR (AT THE PEAK)
COMPLETING THE 1ST BAY
COMPLETING THE TOP FRAME
REPEAT PREVIOUS STEPS UNTIL ALL BEAMS ARE VERTICAL AND BOTH END BAYS ARE X-CABLED, AS SHOWN.
IN 20’ MID BAYS ONLY, INSTALL A SUPPORT PURLIN BETWEEN THE EAVE AND THE PURLIN AT THE MID­RAFTER LOCATION. THIS SUPPORT WILL BRACE AGAINST INWARD DEFLECTION OF THE EAVE BAY THAT COULD OTHERWISE RESULT IN WATER POND­ING IN THE 20 FT BAY.
INSTALLING GABLED END FRAME
UG-15
5
EW-15
15’ 10’
6
13
3
7
EW-15
14
2
1
9
8
UG-15
10
15
UG-5
4
11
BFW
12
INSTALL GABLED END FRAME. MAKE CONNECTIONS IN THE ORDER SHOWN.
12
INSTALLING GUY WEBS BEFORE INSTALLING FABRIC
ATTACH GUY WEBS TO EAVE WELDMENTS AND STAKE OUT AT 45º. SEE STAKING GUIDELINES ON PAGE 9.
* IMPORTANT NOTE: REFER TO CAUTION STATEMENT #2 FOR IMPORTANT WARNING ABOUT NUMBER OF STAKES
SUPPLIED. (SEE BACK PAGE OF THIS MANUAL)
THE INSTALLER MUST USE THE LOCAL SOIL CONDITIONS TO CALCULATE THE ACTUAL NUMBER OF STAKES REQUIRED AND IS RESPONSIBLE FOR THE STAKING PATTERN AND CONFIGURATION.
ANCHOR PROVIDES ANCHORING PACKAGES FOR COMMON SOIL CLASSIFICATIONS; CONTACT YOUR TENT SALES REPRESENTATIVE FOR MORE INFORMATION.
X-CABLED BAYS
FOR CABLE CONNECTIONS AT MID PORTION OF RAFTERS, INSERT THE BOLTS IN THE HOLES OF THE RAFTER THAT ARE JUST ABOVE AND JUST BELOW THE PURLIN CONNEC­TION. THREADS SHOULD POINT INWARD TOWARD EACH OTHER. THREAD CABLE EYE NUTS ONTO EACH BOLT TO SECURE THE CABLES AS SHOWN.
LOWER RAFTER X-CABLES ARE COLOR-CODED RED AND LABELED 10, 15, OR 20 ACCORDING TO BAY SIZE.
UPRIGHT X-CABLES ARE COLOR-CODED GREEN AND LABELED 10, 15, OR 20 ACCORDING TO BAY SIZE.
STAKE PLATES AT PROPER SPACING BEFORE INSTALLING THE X-CABLES. THEN, ADJUST TURNBUCKLES UNTIL CABLE IS SNUG
UPPER RAFTER X-CABLES ARE COLOR-CODED BLUE AND LABELED 10, 15, OR 20 ACCORDING TO BAY SIZE.
PURLIN
NAVI-TRAC UNITS 100 FT. OR MORE IN LENGTH MUST HAVE AN X-CABLED BAY NEAR THE MIDDLE OF THE UNIT (AND/OR EQUALLY SPACED) FOR EVERY 100 FT. UNIT OF LENGTH.
X-CABLING IS IDENTICAL ON BOTH SIDES OF THE STRUCTURE.
SUBSTITUTE BOLTS FOR PINS AT THE TOP OF BOTH UPRIGHTS AND BOTTOM AND TOP OF BOTH RAF­TERS. THREADS SHOULD POINT INWARD TOWARD EACH OTHER. THREAD CABLE EYE NUTS ONTO EACH BOLT TO SECURE THE CABLES AS SHOWN.
REMOVE NUTS FROM THE BOLTS THAT PIN THE BASEPLATE TO THE UPRIGHT. TURN BOLTS SO THE THREADS ARE TO THE INSIDE (FACING EACH OTHER). THREAD CABLE EYE NUTS ONTO BOLTS TO SECURE THE CABLE.
13
INSTALLING MID PANEL
INSERT FINGERS OF WHEELED PANEL GUIDE INTO THE OPEN END OF THE RAFTER AND WELDMENT. TIGHTEN THE BUTTERFLY NUT. REVERSE FOR OPPOSITE SIDE OF BAY.
NOTE: TO ENSURE THAT MID FABRIC GOES IN SMOOTHLY AND TO MINIMIZE CHANCE OF DAMAGE TO FABRIC, ALWAYS USE THE WHEELED PANEL GUIDE TO FEED KEDAR INTO FRAME CHANNELS. SEE PAGE 15 FOR INFORMATION ON HOW TO ATTACH PULL ROPES TO FABRIC.
PULL MID PANEL UP AND OVER THROUGH CHANNELS IN RAFTER EXTRUSIONS.
RAFTER
WHEELED PANEL
GUIDE
INSTALLING 2-PC GABLED END
SECURE LACE LINE AT TOP & BOTTOM WITH FASTEX BUCKLES
WHEELED PANEL GUIDE AT EAVE
STANDARD LOOP & GROMMET LACING
TIE OFF BOTTOM LOOP
USE LONG LIFTING POLE TO PUSH EACH HALF TO PEAK.
14
SAFE ATTACHMENT OF PULL ROPES TO FABRIC
KEDAR
FLAP - ONLY ONE SIDE OF MID OR END WILL HAVE THE FLAP.
SNAP OF PULL ROPE MUST BE FASTENED TO PULL WEB ON UNDER SIDE OF FABRIC PIECES. SNAP MUST FACE AWAY FROM KEDAR.
FOLD CURTAIN AND CATENARY BACK ON TOP OF MID SO THAT THEY ARE OUT OF THE WAY.
FABRIC TENSIONING
TOP
TENSIONING WEB (LEFT) W/ RING
CATENARY TAILS
UPRIGHT
DIAGRAM SHOWING UNDER SIDE OF FABRIC AT EAVE.
TENSIONING WEB (RIGHT) W/ RING
TENSIONING RINGS OVERLAPPED
WEB/RATCHET
ATTACH WEB/RATCHET TO TRIANGLE RING AND TENSION DOWNWARD.
1. USE WEB/ RATCHETS TO SECURE CATENARY ARCHES TO UPRIGHTS, STAKE BASEPLATES BEFORE TENSIONING WEBS.
TENSIONING METHOD:
1. PASS RING OF LEFT TENSIONING WEB THROUGH OPPOSITE CATENARY RING.
2. PASS RING OF RIGHT TENSIONING WEB THROUGH ITS OWN CATENARY RING (PASSING OVER THE LEFT WEB).
3. CONTINUE RING OF RIGHT TENSIONING WEB THROUGH OPPOSITE CATENARY RING.
4. OVERLAP BOTH TENSION RINGS. ATTACH WEB/RATCHET AND TENSION DOWNARD AGAINST TENSION HOLE IN UPRIGHT. (CATENARY RINGS SHOULD MOVE CLOSER TOGETHER AS RATCHET IS TIGHTENED.)
15
50’ x 100’ GABLED END NAVI-TRAC
COMPLETED 50’ GABLED END NAVI-TRAC WITH FABRIC INSTALLED AND TENSIONED, GUY WEBS STAKED AND RATCHETED TIGHT. TO
MEET ENGINEERING REQUIREMENTS WALLS SHOULD BE INSTALLED ON ALL (4) SIDES.
ALTERNATE HIP/GABLED END COMBINATION USING KIT
#3 FOR THE HIP COMPONENTS (SEE THE FOLLOWING PAGE FOR ASSEMBLY REFERENCE)
16
HIP/GABLED END COMBINATION UNIT
SEE THE STANDARD NAVI-TRAC INSTALLATION INSTRUCTIONS FOR ASSEMBLY OF THE HIP END UNIT.
EXTENSION BEAMS ARE PIVOTED IN THE SAME MANNER AS SHOWN PREVIOUSLY IN THIS GABLED END ASSEMBLY INSTRUCTION.
HIP (KIT #3) COMPONENTS (NOTE: MRW & MLW ARE SUPPLIED WITH THE “STARTER’ FRAMES)
H21-4
R21-9
R16-2
MRW
R5-7
H15
EFW
SEE BELOW FOR COMPONENTS THAT MUST BE SUBSTITUTED IN HIP END UNIT (SEE KIT #3)
TFW
EFW
C50
B2
EIW
U8
CW
B4
MLW
E10
E15
DIAGONAL BEAM BRACE USE (OPTIONAL PURCHASE)
The diagonal beam brace is an optional purchase and is used for help in rais­ing and stabilizing the first raised beam. These are sold in sets of two and are meant to be used simultaneously on both sides of the frame.
The diagonal beam brace is adjustable and may be used on all standard sized mids and upright heights.
The first step in using the diagonal beam brace is to adjust it to the size required. Slide the bar out until you see the label for your particular mid size and upright height, then pin to size.
Insert top of beam brace into pad eye weldment and pin as shown in Figure 2.
SECOND BEAM LAY­ING ON GROUND
FIRST BEAM BEING RAISED
As beam is being raised, guide bottom of brace to the base plate of the second beam. Attach brace to base plate and pin as shown in Figure 3.
Raise second beam.
Attach purlins and cables.
Remove braces.
TOP OF DIAGONAL BEAM BRACE FITS INTO HOLE OF PAD EYE, PIN TO KEEP IN PLACE.
DIAGONAL BEAM BRACE
TOP OF DIAGONAL BEAM BRACE PINNED INTO PAD EYE. SEE FIGURE 2.
NOTE: IN THIS OPTION, BEAMS ARE ALL LAID IN THE SAME DIRECTION.
Figure 1
NEWLY RAISED BEAM.
Figure 2
SLIDE BOTTOM OF BEAM BRACE OVER PIN IN BASE PLATE. USE HITCH PIN TO KEEP IT IN PLACE
DIAGONAL BEAM BRACE
Figure 3
NEWLY RAISED BEAM.
DIAGONAL BEAM BRACE SHOWN PINNED IN PLACE
18
Wall Installation
Step 1
Determine which side of wall is inside and out. Ground bar pockets are on outside, Lace flap is on inside. Start by feeding top of kedar edge into channel opening until top of wall is as far as it will go. (Figure A) Insert the bottom edge of kedar into channel opening and feed down until wall is smoothly installed into upright.
Step 2
Starting with wall tab nearest the lace, insert into slotted opening in bottom channel of eave bar. Feed rest of wall tabs into channel.
Step 3
Repeat with the matching half of the wall.
Step 4
Lace wall starting at top of wall bring­ing top loop thru the top grommet of matching half of wall to inside of wall. Continue with this process looping next loop thru grommet and then the up­per loop until all loops are laced. (See Figure B) Tie off bottom loop to keep lace together.
Wall tabs
Channel opening
Ground bar pocket
Lace Flap
Eave Bar
Outside View
Eave Bar
Channel opening
Figure A
Velcro for lace ap
Step 5
Slide ground bar (Figure C) thru pocket on outside of wall. Fasten to frame us­ing the ground bar keeper as noted on next page.
Inside View
Lace loops thru grommets
Figure B
Ground bar
Figure C
19
Navi-Trac Ground Bar Keeper Instructions
Upright prong fi ts into this part of upright.
Prong with no hole in­serts up into upright.
This end to outside
of tent.
Cross sectional view of upright.
Groundbar keeper for interme­diate upright.
Base Plate Inserted into upright.
Wall with kedar already slid into upright.
Groundbar slid into pocket.
Inserting keeper up into bottom of upright on outside corner of tent.
Groundbar keeper for Corners.
Corner Upright
Bottom View looking up into upright with Groundbar keeper inserted.
Gable End Leg Cover
Slide groundbars onto prongs and pin into place as shown.
For Gable End Uprights, This Gable End Leg Cover may be attached at bottom of uprights for use with groundbar keepers.
20
EVANSVILLE, INDIANA
PHONE NUMBER
812· 867· 2421
FAX NUMBER 812· 867· 0547
Anchor products are of superior design and operate best within the parameters of these instructions. It is imperative that the instructions be carefully read and COMPLETELY FOLLOWED. Please read installation instructions before the installation or removal of this product. Installation instructions are available online at www.anchorinc.com or by calling 1-800-544-4445.
CAUTION:
1. For each installation, the installer is solely responsible for evaluating the site and the proper securing method determined. Some soils require different staking or securing than that provided with the tent. Due to this variety of soil conditions, these are the manufacturer’s suggested sequence of installation procedures. Anchor’s responsibility is limited to the manufacture of the tent parts and materials. We are not responsible for methods that installers may choose to erect and secure the tent to the ground.
2. The number of stakes suggested in the installation instructions do not necessarily meet all or any relevant codes on the site of the tent installation. The number of stakes suggested will, in many cases, keep the tent erected, however, due to various soil conditions; these stakes will be insuf¿ cient to keep the tent secure in high winds. It is the tent installer’s responsibility, not the manufacturer, to determine the appropriate number of stakes to meet the necessary wind loads on the site. Regardless of the number of stakes we suggest, we make no representation or warranty as to whether this speci¿ c number of stakes will meet the local tent code. Anchor does not, nor can it make any suggestions, representation, or warranties about the adequate staking required at each speci¿ c installation site. Staking information provided in the installation instructions is not a suggestion about what is
necessary to meet a site-speci¿ c load.
For additional important information, consult: “The IFAI Procedural Handbook For the Safe Installation and Maintenance of Tentage” and the IFAI Pocket Guide “Pullout Capacity of Tent Stakes”, both available from the IFAI Tent Rental Division or on our website.
3. Inasmuch as the weather is unpredictable, good judgment and common sense must be incorporated within installation guidelines. It is the responsibility of the tent installer/maintainer to determine the severity of the weather, proper time and method of installation and/or erection and disassembly. Note: We recommend that snow and
ice be removed from the tent surface as soon as possible because accumulation will damage the tent or fabric structure. Please consult with our Engineering Department about the maximum loads for each product.
This product has been manufactured to meet code requirements. For the safety of all occupants, evacuation is recommended if threatening weather occurs, or if there is any doubt concerning the safe use of this product.
4. Proper safety equipment should be used at all times to insure a safe installation and take down. We suggest a careful evaluation be made to determine safety equipment needed, such as hard hats, steel-toe shoes, safety glasses and other as required. It is our desire that all installations are safe. Please be aware of hidden dangers both underground, i.e., gas lines, water lines, electrical lines, etc. and above the tent such as power lines and telephone lines.
5. Anchor stands behind its products in accordance with its standard Terms and Conditions of sale. A copy of our Terms and Conditions of Sale can be obtained by contacting Anchor at the telephone number and/or address on this document.
28.3 03-04-09
Loading...