Amico Emerald Series Recessed Console With Rail User Manual

Page 1
Installation lnstructions
Select Series Consoles
www.amico.com
Page 2
Note
Security console installation should conform to local building codes
The installation instructions provided are for the Amico standard products. Slight
modi cations to the installations may be required. The product shipped to the job
site may not be exactly as shown on the installation drawings.
1. Review a copy of the  nal approved shop drawing(s) and/or submittal package. These documents will provide you with technical information speci c to your installation, such as:
- equipment types & quantities
- room numbers and location
- shop drawings of each unit type
2. Locate the console unit from the shipping boxes that you wish to install. The contents of each shipping box are listed on the shipping document(s).
2 Amico Pipeline
Page 3
Installation
1. Remove gas cover plates and devices by loosening any screws. Place everything in a safe and clean
location.
2. Remove the fascia by loosening the 2 screws (1 on each side) attaching it to the console. Place everything in a safe and clean location.
www.amico.com 3
Page 4
3. The console should be  ush with the  nished drywall after installation (see Fig. 1). Check the positioning of the  anges to determine if adjustment of the  anges is necessary. If adjustment is not required, skip steps 4 through 8, and proceed with step 9.
NOTE: The  anges are preset for 5/8” drywall.
Fig 1
NOTE 1:
Mounting hardware (rivets or screws) by others
STUD
CONSOLE BOX END CAP
CONSOLE BOX
FLANGE
DRYWALL
NOTE:
Go to step 9 if  anges do not require adjustment
4. Remove any aluminum device covers that are blocking access to the screws (2 per  ange) holding the  ange to the console box. This is done by loosening the screws (typically 2 per cover) attaching it to the console box. Place everything in a safe and clean location.
4 Amico Pipeline
Page 5
5. Remove any devices that are blocking access to the  ange crews. Place everything in a safe and clean location.
6. Loosen the 2  ange screws and make necessary adjustments on both sides.
7. Replace the devices removed in step 5.
8. Replace the aluminum device covers removed in step 4.
9. Mount the console box by using rivets or screws to attach the  anges (2 on each side) to the studs (See Fig. 1, NOTE 1). See architectural drawings for mounting heights. Also coordinate mounting heights with contractor on site.
www.amico.com 5
Page 6
10. Make all on-site gas and electrical connections, and perform any wiring required. If it is necessary to remove an aluminum device plate to wire a device, do so by loosening the screws (typically 2 per cover) attaching it to the console box.
11. Install drywall (by others).
12 . Reassemble the fascia removed in step 2.
13. Reassemble the electrical and gas cover plates removed in step 1.
6 Amico Pipeline
Page 7
Finished Product
Other Installation Notes
1. Division 15 to connect gas stubs on console to building medical gas supply lines previously roughed in.
2. Division 16 to feed electrical conduits through top or back of consoles into ceiling space for connection to normal, emergency and low voltage boxes provided in ceiling space by division 16 contractor.
www.amico.com 7
Page 8
www.amico.com
Amico Pipeline | www.amico.com
85 Fulton Way, Richmond Hill
Ontario, L
4B 2N4, Canada
71 East Industry Court, Deer Park NY 11729, U.S.A
Toll Free Tel: 1.877.264.2697 Toll Free Fax: 1.866.440.4986 Tel: 905.763.7778
Fax: 905.763.8587 Email: info@amico.com
C US LISTED
APE-INSTAL-INSTR-SLCT_SERIES_RECESSED_CONSL APRIL 2008