Installation lnstructions V1.1
Floor Pedestal
Freedom Series

Note
Floor pedestal installation should conform to local building codes
The installation instructions provided are for the Amico standard products. Slight
modications to the installations may be required. The product shipped to the job
site may not be exactly as shown on the installation drawings.
2 Amico Pipeline

Before Installation
1. Review a copy of the nal approved shop drawing(s) and/or submittal package. These documents will
provide you with technical information specic to your installation, such as:
- equipment types and quantities
- room numbers and location
- shop drawings of each unit type
2. Locate the console unit from the shipping boxes that you wish to install. The contents of each shipping
box are listed on the shipping document(s).
www.amico.com 3

Installation
1. Remove the top cover by loosening the 8 screws around the top attaching it to the oor pedestal.
2. (Optional) Remove the access panel cover on the back of the oor pedestal by loosening the 6 screws
attaching it to the oor pedestal.
4 Amico Pipeline

3. Anchor the oor pedestal to the ground by inserting 4 bolts or screws (by others) on the base of the oor
pedestal.
4. Make all on-site connections.
5. Replace the top cover removed in step 1 and, if applicable, the access panel cover removed in step 2.
www.amico.com 5

Other Installation Notes
1. Division 15 to connect gas stubs on oor pedestal to building medical gas supply lines previously
roughed in.
2. Division 16 to feed exible electrical conduits through bottom of oor pedestals into ground for
connection to normal, emergency and low voltage sources provided in ground by division 16 contractor.
www.amico.com 7

www.amico.com
Amico Pipeline | www.amico.com
85 Fulton Way, Richmond Hill
Ontario, L4B 2N4, Canada
71 East Industry Court, Deer Park
NY 11729, U.S.A
Toll Free Tel: 1.877.264.2697
Toll Free Fax: 1.866.440.4986
Tel: 905.763.7778
Fax: 905.763.8587
Email: info@amico.com
APE-INSTAL-INSTR-FLR-PEDSTAL APRIL 2008