American Standard T353.730 Installation Manual

INSTALLATION
INSTRUCTIONS
TOWNSEND
®
T353.730
SINGLE HANDLE THERMO TRIM
Thank you for selecting American Standard... the benchmark of fine quality for over 100 years.
To ensure that your installation proceeds smoothly-please read these instructions carefully before you begin.
RECOMMENDED TOOLS
Flat Blade Screwdriver
ROUGHING-IN DIMENSIONS
R510
1/2
" NPT
R530
" NPT
1/2
3/4
3/4
R510
" NPT
R530
" NPT
1-3/8
(34 mm)
3-3/8"
(86 mm)
"
237"
(237 mm)
Certied to comply with ANSI A112.18.1M
Phillips Screwdriver
3-1/4"
(93 mm)
7-7/16"
(189 mm)
CARE INSTRUCTIONS:
To keep your new faucet looking new, please follow these simple care instructions:
DO: – Simply rinse the faucet clean with clear water. – Dry the faucet with a soft cotton cloth.
DO NOT: – Do not use any abrasive cleaners, cloths, or paper towels. – Do not use any cleaning agents containing acids, polish abrasives, or harsh cleaners or soaps.
Regular and routine cleaning will reduce the need for heavy cleaning and polishing. If heavy cleaning is required, the following procedures are recommended:
1"
(25 mm)
LEVER
HANDLE
Remove as much surface dirt and lm using clear water and soft cotton cloth (as described above). – Use any of the following to remove tough surface lm and build-up: – Mild liquid detergents
– Clear ammonia free liquid glass cleaners – Non-acidic, non-abrasive gentle liquid or fully dissolved powder cleansers mixed according to manufacturers directions – Non-abrasive liquid polishers
Once clean, rinse faucet again with clear water to thoroughly remove cleaner or polish and blot dry with a soft cotton cloth.
Failure to follow these care instructions may damage the Faucet’s finish.
3"
(73 mm)
Product names listed herein are trademarks of AS America, Inc. © AS America, Inc. 2016
- 1 -
1
TRIM INSTALLATION
Push CAP (1) over the O-RING SEAL (2).
2
Push ESCUTCHEON HOLDER (3) with lightly greased O-RING SEAL (4) over CAP (1). Attach with the two SCREWS (5) provided.
Align pins in back of ESCUTCHEON (6) with holes in
GREASE ESCUTCHEON
ESCUTCHEON HOLDER (3). Push ESCUTCHEON (6) ush against nished wall.
2
HANDLE INSTALLATION
• Install HANDLE ADAPTER (1) onto TEMPERATURE CONTROL KNOB (2) and tighten with SCREW (3).
Align HANDLE (4) and push onto TEMPERATURE CONTROL KNOB (2).
Tighten SET SCREW (5) in handle with HEX WRENCH (6) SUPPLIED.
3
TRANSPOSED SUPPLY PIPING OR BACK TO BACK INSTALLATION
Should the hot and cold water supply pipes have been transposed making adjustment impossible, proceed as follows:
– Shut off water supply. – Remove handle and rim – Remove check stops and re-install them transposed.
Important note: RED CHECK STOP is now on the right of the mixer body and the BLUE CHECK STOP is now on the left.
Turn the water supply back on and perform the temperature adjustment
in step 4.
O-RING SEAL
1
4
CHECK STOP
(RED TO BLUE)
3
5
PINS
6
2
4
1
3
5
6
CHECK STOP
(BLUE TO RED)
4
TEMPERATURE CALIBRATION
• Check that arrow marking B points vertically upwards. If not, push the BLACK CLAMP (1) on the SECURING RING (2) to the right, pull off KNOB MOUNT (3) and reinstall KNOB MOUNT (3) with arrow “B” pointing upwards.
SET HOT LIMIT STOP
– The maximum mixed water temperature is set at 109°F at the factory. This setting can be changed if desired. – Remove the TEMPERATURE LIMIT STOP (4) (H shaped Red Plastic part). Reinstall it at the desired notch as indicated in the diagram to limit the maximum mixed water temperature to 104°F or 112°F.
For 100°F adjustment, turn the water supply on. Turn KNOB MOUNT (3) until the spout temperature is 100°F. Check that arrow marking A on the KNOB MOUNT (3) still points upward after adjusting the thermostat to 100°F. If not, pull out the RED LOCKING DEVICE (5). Remove KNOB MOUNT (3) without turning by sliding out
as indicated by the arrow.
Reinstall the KNOB MOUNT (3) so that the arrow marking A points upwards.
Reinstall RED LOCKING DEVICE (5).
5
OPERATING THE VALVE
• Turn on water supply on and test installed tting.
If the system is delivering all Hot or all Cold and no mixed water the pipes are probably
transposed. See step 3 for TRANSPOSED SUPPLY PIPING.
Operate valve from off to cold to hot. Check temperature. If max mixed water temperature is to hot or to cold see step 4 and re-calibrate the valve.
ARROW
"B"
4
104
109
112
1
ARROW
"A"
3
2
5
HOT
COLD
OFF
- 2 -
Loading...
+ 1 hidden pages