Installation
Instructions
GREEN TEA
DECK-MOUNT BATH FILLER
7010.900
7010.901
Thank you for selecting American-Standard...the benchmark
of fine quality for over 100 years.
To ensure that your installation proceeds smoothly--please
read these instructions carefully before you begin.
Recommended Tools
Flat Blade Screwdriver
Adjustable Wrench
Channel Locks
*Wrench
*Hex key
*Supplied with Fitting
ROUGHING-IN DIMENSIONS
10-5/8"
5-5/16"
3-3/4"
2-9/16"
MOUNTING
SURFACE
8-1/16"
1-1/8 DIA.
3/4-14 MALE
N.P.T. INLETS
3"
1-1/16 DIA.
2-1/8"
(H)
Certified to comply with ANSI A112.18.1M
M968595 Rev.1.2
ADJ. 6-1/2 TO 12
2-1/16"
DIA.
1-1/4
MAX.
3
(C)
12 MAX
1-1/2 MAX.
1-3/16 DIA.
2-1/16
DIA.
7-7/8"
(200mm)
SPOUT ASSEMBLY
1
CAUTION
Install RING WASHER (1) into SPOUT recess. Check that O-RING (2)
on end of SPOUT SHANK (3) is in place. Insert SPOUT SHANK (3)
through center hole on mounting surface.
Assemble RUBBER WASHER (4) and BRASS WASHER (5) and
LOCKNUT (6) onto SPOUT SHANK (3). Align SPOUT ASSEMBLY
and from underside of ledge secure SPOUT ASSEMBLY into
position with LOCKNUT (6).
Turn off hot and cold water
supplies before beginning.
SPOUT
ASSEMBLY
SPOUT RECESS
1
3
2
MOUNTING
SURFACE
4
5
6
PREPARE TUBE AND TEE ASSEMBLY
2
Prepare TUBE and TEE ASSEMBLY (1) to fit center to center
VALVE (2) location (between 6-1/2" and 12"). If necessary,
cut and/or bend TUBING carefully. Make sure tube bend is
close to the TEE (1) so that it will not effect the compression
joint at the VALVE CONNECTION.
Remove COUPLING NUT (3) and FERRULE (4) from each
VALVE (2) and slide onto TUBING (5).
4
3
1
5
ADJ. 6-1/2 TO 12
MOUNTING
SURFACE
2
NOTE
VALVE inlet is 3/4-inch NPT male.
3
4
VALVE ASSEMBLY
3
Install LOCKNUTS (1) and RUBBER WASHERS (2) onto valve shanks.
Push TUBING (3) ends into VALVE (4) side outlets. Insert VALVES (4)
into mounting holes from underside of ledge.
Press TEE (5) onto SPOUT SHANK (6) making certain that the O-RING (7) is
properly seated on SHANK (6). Push COUPLING (8 or 8a) into TEE (5) and
attach to SPOUT SHANK (6) and tighten. For 7005.901 use a 10 mm
(3/8") hex key.
Thread of VALVE BODY (4) should extend at least 5/16 inch above
MOUNTING SURFACE (11). If necessary, adjust LOCKNUT (1).
Place RUBBER RING (10) into ESCUTCHEON ADAPTERS (9) and thread onto
valves until snug against internal stop.
Tighten LOCKNUT (1) to secure VALVE (4) position.
Slide FERRULE (12) and COUPLING NUT (13) to outlet of VALVE (4) and tighten
COUPLING NUT (13) firmly.
Connect HOT water supply to inlet of left VALVE and COLD water supply to inlet of
right VALVE using appropriate connector.
8
7
5/16'' MIN.
4
11
MOUNTING
SURFACE
2
1
9
10
HOT
8a
FOR FITTING
LESS SPRAY
MOUNTING
11
SURFACE
9
10
7
12
13
4
3
5
6
12
8
13
COLD
INSTALL HANDLES
4
Push ADAPTER (1) on VALVE STEM (2), so that the hole of the
ADAPTER (1) without a spline is facing up. Fig. A. Tighten
STEM SCREW (3) to secure ADAPTER (1).
Find correct position of LEVER HANDLE ASSEMBLY (4) by adjusting
male teeth on ADAPTER (1) to female teeth in HANDLE (4). Push
LEVER HANDLE ASSEMBLY (4) down onto ADAPTER (1).
Thread base of LEVER HANDLE ASSEMBLY (4a) onto DECK
ADAPTER (5) until snug against mounting surface.
SPLINE END DOWN
SERVICE
5
To change direction of handle:
Turn valve to OFF position
Thread HANDLE BASE (1a) counter clock-wise until loose.
Pull HANDLE (1) “UP” firmly to release from ADAPTER (2).
Remove SPRING CLIP (3). Lift STOP WASHER (4), turn 90˚
and replace. Replace SPRING CLIP (3).
Re-install HANDLE ASSEMBLY (1).
Fig. A.
1a
4
4a
TOP
1
3
2
5
1
r
e
m
o
v
e
l
l
a
t
s
i
n
If spout drips, operate handles several times from OFF to ON position.
Do not force - handles turn only 90˚.
90˚
2
4
3
2
M968595 Rev.1.2