INSTALLATION INSTRUCTIONS
Acrylux Builder Series Bathtubs
Model 6030Y1.102.XXX
Model 6030Y1.202.XXX
Model 6032Y1.102.XXX
Model 6032Y1.202.XXX
Thank you for selecting American Standard – the benchmark of fine quality for over 100 years. To ensure this product
is installed properly, please read these instructions carefully before you begin. Local building codes vary by location.
Observe all local plumbing and building codes.
RECOMMENDED TOOLS AND MATERIALS
Tape Measure Saber Saw Pencil Mortar Compound (optional)
Level Safety Glasses Drill Screws, 1" Flathead, Stainless
IMPORTANT:
• Allow tub to reach room temperature before installation.
• Before you begin, locate appropriate product reference (below).
• Read installation instructions carefully before starting project.
• Keep instructions for warranty information.
6030Y1.102.XXX
6030Y1.202.XXX
6032Y1.102.XXX
6032Y1.202.XXX
59-7/8"
1521mm
STUD LAYOUT:
The American Standard Acrylux Bathtub
will fit all standard 30" x 60" tub walls.
14"
356mm
6"
152mm
Drain C
L
60"
1524mm
Floor Cut Out
6" x 10"
(152 x 254mm)
31-1/2"
800mm
10"
254mm
8"
203mm
= stud location
30"
762mm
15"
381mm
59-7/8"
1521mm
STUD LAYOUT:
The American Standard Acrylux Bathtub
will fit all standard 32" x 60" tub walls.
15"
381mm
6"
152mm
Drain C
L
1524mm
= stud location
(152 x 254mm)
60"
Floor Cut Out
6" x 10"
33-1/2"
851mm
10"
254mm
8"
203mm
32"
813mm
18"
457mm
LHO shown - reverse for RHO LHO shown - reverse for RHO
Product names listed herein are trademarks of AS America, Inc.
© AS America, Inc. 2008
754281-100 Rev. A
INSTALLATION INSTRUCTIONS
STEP 1. PREPARING ALCOVE
• Strip to bare studs.
• Alcove studs should be constructed as shown above.
• Floor must be clean, smooth, and level (check with level). Sub
floor must be installed. Do not install tub on open floor joists.
• Cut hole in sub floor as shown on page 1 to accommodate drain.
STEP 2. INSTALLING TUB
• Trial fit tub in prepared alcove. With tub sitting flat on floor, check
with level on top of tub. Tub should be level from front-to-back
and side-to-side (Fig 1).
• A floor leveling compound (smooth mortar) or a similar
quick-setting compound specifically made for leveling floors may
be used to fully support and level base.
• After tub is leveled, if alcove is larger than tub, shim between tub
and studs to create a tight fit. Screw tub flange to studs (Fig. 2).
CLEANING
FIGURE 1. Check to assure tub is level.
FIGURE 2. If necessary, shim between tub and studs for
tight fit and screw to each stud.
• Do not use any abrasive cleaners or metal scrapers.
• If drywall mud or plaster gets on your shower, it may be carefully removed with a wooden scraper made from
a piece of scrap wood.
• Adhesive may be removed with mineral spirits.
• Ideal cleaners are Soft Scrub Gel® or Comet Gel®.
WARNING:
Some cleaning products are not suitable for use. Read all labels carefully.
DO NOT USE if they say “not suitable for use with ABS, acrylic, or polystyrene.
754281-100 Rev. A-2-