American Standard 3572, 3574, 3575 User Manual

Page 1
THANK YOU...
for selecting an American Standard bath. Your new bath is shipped to you after careful inspection. The Air Massage System is completely assembled with air pump, motor, lights, and system piping. All you need to finish the installation are your selected fittings and electrical connections for an Air Massage System.
To insure maximum performance and pleasure from this product, please follow the instructions and cautions.
FOR AFTER-SALES SERVICE CALL 1 (00) 44-10 WEEKDAYS.
GREEN TEA™ 5' x 36" MODEL 3571
GREEN TEA™ 5-1/2' x 36" MODEL 3572
GREEN TEA™ 6' x 36" MODEL 3573
GREEN TEA™ 5' x 42" MODEL 3574
GREEN TEA™ 6' x 42" MODEL 3575
TOWN SQUARE
®
5' x 42" MODEL 2748
TOWN SQUARE
®
6' x 42" MODEL 2742
ELLISSE OVAL MODEL 2709
INSTALLATION GUIDE FOR
AIR MASSAGE SYSTEM
1
754063-100 Rev. B
Page 2
TABLE OF CONTENTS:
Cover
................................................................................................Page 1
Table of Contents
..............................................................................Page 
Safety Instructions Notice.................................................................Page 3
Roughing-in Reference.....................................................................Page 4 - 6
Installation and Framing Instructions................................................Page 7 - 
Supplied Drain Assembly and Installation Instructions.....................Page  - 13
Post Installation Instructions.............................................................Page 14
Remote Blower Location Option.......................................................Page 15
Warranty
...........................................................................................Page 16
754063-100 Rev. B
Page 3
IMPORTANT SAFETY
INSTRUCTIONS
READ AND FOLLOW ALL INSTRUCTIONS!
!
!
!
!
!
!
WARNING: Risk of personal injury. Do not permit children to use this bathtub without adult supervision.
WARNING: Risk of electric shock. Do not permit electrical appliances near any bathtub when bathtub contains water.
WARNING:
Risk of hyperthermia and possible drowning.
People using medications and/or having adverse medical
history should consult a physician before using this product.
WARNING: Risk of personal injury. Do not overfill bathtub before entering. Entering tub when filled more than /3 can
cause overflow and slippery conditions. Exercise caution when entering and exiting.
WARNING:
No Food or Alcoholic Beverages.
Use of your bathtub immediately after meals is not recommended. Avoid alcohol consumption before or during bathing. Alcoholic beverages can cause drowsiness or hyperthermia resulting in loss of consciousness or even drowning.
WARNING:
Pregnancy.
If you are or think you may be pregnant, consult your physician before using the bathtub.
Use this unit only for its intended use as described in this manual. Do not use any attachments not recommended by American Standard.
The unit must be connected only to a supply circuit that is properly protected by a ground-fault circuit-interrupter (GFCI). Such a GFCI should be provided by the installer and should be tested on a routine basis. To test the GFCI, push the test button. The GFCI should interrupt power. Push the reset button. Power should be restored. If the GFCI fails to operate in this manner, the GFCI is defective. If the GFCI interrupts power to the bathtub without the test button being pushed, a ground current is flowing, indicating the possibility of an electric shock. Do not use this air bath. Disconnect the air bath and have the problem corrected by a licensed electrician before using.
SAVE THESE INSTRUCTIONS
3
754063-100 Rev. B
Page 4
ELLISSE OVAL
MODEL 2709 AIR BATH
C/L
FOR SPOUT
& VALVES
FOR HAND SPRAY
FITTINGS DECK
EDGE OF FITTINGS
DECK
35-3/4
(908mm)
TO END OF TUB
1-1/2
(38mm)
1-1/2
(38mm)
1-1/2
(38mm)
2-1/2
(64mm)
4-1/2
(114mm)
4-1/2
(114mm)5(127mm)
DRAIN
ROUGHING-IN REFERENCES
HOLE DRILLING LOCATION FOR AMERICAN STANDARD "TOWN SQUARE"
DECK MOUNT BATH FILLER WITH PERSONAL SHOWER, MODEL #2555.901 ONLY
C/L
FOR SPOUT
& VALVES
FOR HAND
SPRAY
FITTINGS DECK
EDGE OF FITTINGS
DECK
29-3/4
(755mm)
TO END OF TUB
1-1/2
(38mm)
1-1/2
(38mm)
1-1/2
(38mm)
2-1/2
(64mm)
4-1/2
(114mm)
4-1/2
(114mm)5(127mm)
DRAIN
HOLE DRILLING LOCATION FOR AMERICAN STANDARD "TOWN SQUARE"
DECK MOUNT BATH FILLER WITH PERSONAL SHOWER, MODEL #2555.901 ONLY
TOP VIEW
TOWN SQUARE® 5' x 42"
MODEL 2748 AIR BATH
59-1/2"
(1511mm)
INTEGRAL FITTING DECK 2-1/2" X 14" (64 X 356mm)
29-3/4"
(755mm)
41-5/8"
(1057mm)
CONTROL PANEL
OUTLINE OF CUTOUT
58" X 40-1/8"
(1473 X 1019mm)
PROVIDE ACCESS TO BLOWER FOR
SERVICE ON ALL INSTALLATIONS
C/L OF DRAIN OUTLET
FLOOR CUTOUT
9" X 18"
(229 X 458mm)
3/4" (19mm)
14-1/2"
(368mm)
5-1/4" (133mm)
3"
(76mm)
OUTLINE OF SKID
RESISTANT SURFACE
20 AIR JETS
EDGE OF FLOOR CUTOUT
AIR
BLOWER
LEVELING STRINGER
(NOT FOR SUPPORT)
1-1/2" N.P.T. THREADS
2"
(51mm)
5-3/4"
(146mm)
C/L OF OVERFLOW
21"
(533mm)
23"
(584mm)
ROUGH
FLOOR
INTEGRAL FEET WITH
ATTACHED BASEBOARD
1-1/2" O.D. TAILPIECE
3/4" (19mm)
3-1/8"
(79mm)
AIR
BLOWER
7-3/4" TYPICAL (197mm)
10-1/4"
(260mm)
END VIEW
END VIEW
TOP VIEW
CONTROL PANEL
41-3/4"
(1060mm)
26-3/4
(679mm)
7-3/4” TYPICAL (197mm)
OUTLINE OF SKID RESISTANT SURFACE
35-3/4"
(908mm)
13-1/4"
(337mm)
4"
(102mm)
71-1/2"
(1816mm)
3"
(76mm)
FLOOR CUTOUT 9" X 19" (229 X 459mm)
OUTLINE OF CUTOUT 70" X 40-1/4" (1778 X 1022mm)
PROVIDE ACCESS TO BLOWER FOR SERVICE ON ALL INSTALLATIONS
INTEGRAL FITTING DECK 2-1/4" X 14" (57 X 356mm)
3/4"
(19mm)
EDGE OF FLOOR CUTOUT
AIR BLOWER
C/L OF DRAIN OUTLET
20 AIR JETS
LEVELING STRINGER (NOT FOR SUPPORT)
1-1/2" N.P.T. THREADS
2"
(51mm)
3-1/4"
(83mm)
C/L OF OVERFLOW
20"
(508mm)
22"
(559mm)
ROUGH
FLOOR
1-1/2" O.D.TAILPIECE
5/8"
(16mm)
3" (76mm)
AIR BLOWER
10-1/4”
(260mm)
INTEGRAL FEET WITH ATTACHED BASEBOARD
TOP VIEW
END VIEW
TOP VIEW
END VIEW
FLOOR CUTOUT 229 X 459mm (9" X 19")
1759 mm
(69-1/4")
OUTLINE OF CUTOUT
240 mm
(9-7/16")
978 mm (38-1/2")
489mm
(19-1/4")
76mm
(3")
C
L
OF DRAIN OUTLET
PROVIDE ACCESS
TO BLOWER FOR
SERVICING ON ALL
INSTALLATIONS
16 AIR JETS
AIR
BLOWER
SEE FTTG.SPECS
FOR DIMENSION
C
L
OF SUPPLIES
CONTROL
PANEL
11-1/4"
(286mm)
7-3/4" TYPICAL (197mm)
ROUGH FLOOR
1-1/2" O.D. TAILPIECE
495mm
(19-1/2")
INTEGRAL FEET
WITH ATTACHED
BASEBOARD
86mm (3-3/8")
38mm
(1-1/2")
533mm
(21")
1-1/2" N.P.T.M. THREADS
35mm
(1-3/8")
98mm (3-7/8")
C
L
TO OVERFLOW
TOWN SQUARE® 6' x 42"
MODEL 2742 AIR BATH
GREEN TEA™ 5' x 36"
MODEL 3571 AIR BATH
LEVELING STRINGER NOT FOR SUPPORT
60
(1524mm)
36
(914mm)
11-1/2
(292mm)
OUTLINE OF CUTOUT 58.5 x 34.5 (1486 x 876mm)
14-3/4
(375mm)
CONTROL PANEL
BLOWER
CUTOUT IN FLOOR FOR DRAIN
20 AIR JETS
9
(229mm)
C
L
PROVIDE ACCESS TO BLOWER FOR SERVICE ON ALL INSTALLATIONS
ROUGH FLOOR
1-1/2" O.D. TAILPIECE
508mm
(20")
INTEGRAL FEET WITH ATTACHED BASEBOARD
51mm
(2")
559mm
(22")
1-1/2" N.P.T.M. THREADS
35mm
(1-3/8")
98mm (3-7/8")
C
L
TO OVERFLOW
102mm (4")
754063-100 Rev. B
4
Page 5
GREEN TEA™ 6' x 36"
MODEL 3573 AIR BATH
GREEN TEA™ 5' x 42"
MODEL 3574 AIR BATH
ROUGHING-IN REFERENCES
TOP VIEW
END VIEW
TOP VIEW
END VIEW
TOP VIEW
END VIEW
TOP VIEW
END VIEW
GREEN TEA™ 5-1/2' x 36"
MODEL 3572 AIR BATH
GREEN TEA™ 6' x 42"
MODEL 3575 AIR BATH
22 AIR JETS
PROVIDE ACCESS TO BLOWER FOR SERVICE ON ALL INSTALLATIONS
66
(1676mm)
36
(914mm)
11-1/2
(292mm)
14-3/4
(292mm)
BLOWER
C
L
CUTOUT IN FLOOR FOR DRAIN
9
(229mm)
OUTLINE OF CUTOUT 64.5 x 34.5 (1638 x 876mm)
CONTROL PANEL
LEVELING STRINGER NOT FOR SUPPORT
ROUGH FLOOR
1-1/2" O.D. TAILPIECE
508mm
(20")
INTEGRAL FEET WITH ATTACHED BASEBOARD
51mm
(2")
559mm
(22")
1-1/2" N.P.T.M. THREADS
35mm
(1-3/8")
98mm (3-7/8")
C
L
TO OVERFLOW
102mm (4")
72
(1829mm)
36
(914mm)
11-1/2
(292mm)
OUTLINE OF CUTOUT 70.5 x 34.5 (1780 x 876mm)
14-3/4
(375mm)
CONTROL PANEL
BLOWER
CUTOUT IN FLOOR FOR DRAIN
C
L
9
(229mm)
LEVELING STRINGER NOT FOR SUPPORT
ROUGH FLOOR
1-1/2" O.D. TAILPIECE
508mm
(20")
INTEGRAL FEET WITH ATTACHED BASEBOARD
51mm
(2")
559mm
(22")
1-1/2" N.P.T.M. THREADS
35mm
(1-3/8")
98mm (3-7/8")
C
L
TO OVERFLOW
102mm (4")
PROVIDE ACCESS TO BLOWER FOR SERVICE ON ALL INSTALLATIONS
23 AIR JETS
60
(1524mm)
42
(1067mm)
11-1/2
(292mm)
OUTLINE OF CUTOUT 58.5 x 40.5 (1486 x 1029mm)
14-3/4
(375mm)
BLOWER
C
L
9
(229mm)
CUTOUT IN FLOOR FOR DRAIN
CONTROL PANEL
LEVELING STRINGER NOT FOR SUPPORT
ROUGH FLOOR
1-1/2" O.D. TAILPIECE
508mm
(20")
INTEGRAL FEET WITH ATTACHED BASEBOARD
51mm
(2")
559mm
(22")
1-1/2" N.P.T.M. THREADS
35mm (1-3/8")
98mm (3-7/8")
C
L
TO OVERFLOW
102mm (4")
PROVIDE ACCESS TO BLOWER FOR SERVICE ON ALL INSTALLATIONS
23 AIR JETS
72
(1829mm)
42
(1067mm)
11-1/2
(292mm)
OUTLINE OF CUTOUT 70.5 x 40.5 (1780 x 1029mm)
14-3/4
(375mm)
BLOWER
C
L
9
(229mm)
CUTOUT IN FLOOR FOR DRAIN
CONTROL PANEL
PROVIDE ACCESS TO BLOWER FOR SERVICE ON ALL INSTALLATIONS
LEVELING STRINGER NOT FOR SUPPORT
ROUGH FLOOR
1-1/2" O.D. TAILPIECE
508mm
(20")
INTEGRAL FEET WITH ATTACHED BASEBOARD
51mm
(2")
559mm
(22")
1-1/2" N.P.T.M. THREADS
35mm
(1-3/8")
98mm (3-7/8")
C
L
TO OVERFLOW
102mm (4")
27 AIR JETS
5
754063-100 Rev. B
Page 6
ROUGHING-IN REFERENCES
GENERAL SPECIFIC ATIONS F OR 2748
AIR MAS SAGE SYST EM
59- 1/2 x 41-5 /8 x 23 In. (1 511 x 10 57 x 5 84mm)
110 Lbs. (50 Kg. )
611 Lbs. (278 Kg .)
60 Gal. (227 L)
34 x 24 In. ( 864 x 61 0mm )
52 x 31 In. ( 132 1 x 1 321 mm)
12- 1/2 I n. (3 18m m)
40 Lbs./ Sq.Ft . ( 194 K gs. /Sq .m)
27. 8
45. 4
1.0 HP, 10 AM PS ,120V .BLO WER
ELECTRI CAL SPECI FICATION S
INS TALLE D SIZ E WEI GHT WEI GHT w /WATE R GAL . TO OVERF LOW BAT HING WELL AT SUMP BAT HING WELL AT RIM WAT ER DE PTH T O O VERFL OW FLO OR LO ADING (PR OJECT ED AR EA) PTS .
CUB E (FT3)
GENERAL SPECIFI CATIONS F OR 2709 AIR BATH
69- 1/4 x 38-1 /2 x 19- 3/4 In .(175 9 x 97 8 x 5 02m m)
107 Lbs. (49 Kg. )
640 Lbs. (291 Kg .)
64 Gal. (243 L) 45 x 23 In. ( 114 3 x 5 84m m) 63 x 32 In. ( 160 0 x 8 13m m)
13 In. ( 330mm )
35 Lbs./ Sq.Ft . ( 166 K gs. /Sq .m)
25. 6
49. 4
ELECTRICAL SPECIFICATIONS
1.0 HP, 10 AMPS , 120V.BLO WER
INS TALLE D SIZ E WEI GHT WEI GHT w /WATE R GAL . TO OVERF LOW BAT HING WELL AT SUMP BAT HING WELL AT RIM WAT ER DE PTH T O O VERFL OW FLO OR LO ADING (PR OJECT ED AR EA) PTS . CUB E (FT3)
GENERAL SPECIFICA TIONS FOR 2742
AIR MASS AGE SYSTE M
71- 1/2 x 41-3 /4 x 22 I n. (1 816 x 1060 x 55 9mm)
115 Lbs. (52 Kg.)
690 Lbs. (313 Kg.)
69 Gal. (261 L) 41 x 21- 1/2 I n. (1 041 x 546 mm) 62 x 31- 1/2 I n. (1 574 x 800 mm)
14- 1/4 I n. (3 62mm)
33 Lbs. /Sq.F t. (1 63 K gs./S q.m)
27. 8
55. 7
1.0 HP, 10 AM PS ,1 20V .BLO WER
ELECTRIC AL SPECIF ICATIONS
INS TALLE D SIZ E WEI GHT WEI GHT w /WATE R GAL . TO OVERF LOW BAT HING WELL AT SU MP BAT HING WELL AT RI M WAT ER DE PTH T O OVE RFLO W FLO OR LO ADING (PR OJECT ED AR EA) PTS .
CUB E (FT3)
6 0 x 3 6 x 2 2 In. (15 24 x 914 x 559m m)
86 Lbs. (39 K g.)
519 Lbs. (235 Kg.)
52 Gal. (197 L.) 38 Gal. (144 L.)
19 x 43 In. ( 483mm x 1 092mm )
48- 1/2 x 27 I n. (1 232m m x 6 86mm)
14 In. ( 356mm )
35 Lbs./ Sq. F t. (1 69 K gs/Sq . m.)
23. 8
44. 5
GENERAL SPECIFIC ATIONS FO R 3571
AIR BATH SYSTEM
INS TALLE D SIZ E WEI GHT WEI GHT w /WATE R GAL . TO OVERF LOW MIN . OPE RATIN G GAL . BAT HING WELL AT SU MP BAT HING WELL AT RI M WAT ER DE PTH T O OVE RFLO W FLO OR LO ADING (PR OJECT ED AR EA) PTS . CUB E (FT3)
ELECTRIC AL SPECI FICATIONS
1.0 HP, 10 AM PS, 1 20V.BLOWER
6 6 x 3 6 x 2 2 I n. (1676 x 914 x 55 9mm )
100 Lbs. (45 Kg. )
592 Lbs. (269 Kg .)
59 Gal. (223 L.) 44 Gal. (167 L.)
19 x 49 In. ( 483 mm x 124 5mm )
54- 1/2 x 27 I n. (1384 mm x 6 86m m)
14 In. ( 356mm )
36 Lbs./ Sq. F t. (175 Kgs /Sq . m .)
25. 6
45. 1
GENERAL SPECIFI CATIONS F OR 3572
AIR BATH SYSTEM
INS TALLE D SIZ E
WEI GHT WEI GHT w /WATE R GAL . TO OVERF LOW MIN . OPE RATIN G G AL. BAT HING WELL AT SUMP BAT HING WELL AT RIM WAT ER DE PTH T O O VERFL OW FLO OR LO ADING (PR OJECT ED AR EA) PTS . CUB E (FT3)
ELECTRI CAL SPEC IFICATIO NS
1.0 HP, 10 AM PS, 120V .BLOWER
7 2 x 3 6 x 2 2 In. (18 29 x 914 x 559m m)
115 Lbs. (52 Kg.)
665 Lbs. (302 Kg.)
66 Gal. (250 L.) 49 Gal. (185 L.)
19 x 55 In. ( 483mm x 1 397mm )
60- 1/2 x 27 I n. (1 537m m x 6 86mm)
14 In. ( 356mm )
37 Lbs./ Sq. F t. (1 75 K gs/Sq . m.)
23. 8
44. 5
GENERAL SPECIFIC ATIONS FO R 3573
AIR BATH SYSTEM
INS TALLE D SIZ E WEI GHT WEI GHT w /WATE R GAL . TO OVERF LOW MIN . OPE RATIN G GAL . BAT HING WELL AT SU MP BAT HING WELL AT RI M WAT ER DE PTH T O OVE RFLO W FLO OR LO ADING (PR OJECT ED AR EA) PTS . CUB E (FT3)
ELECTRI CAL SPECI FICATIONS
1.0 HP, 10 AM PS, 1 20V.BLOWER
5 9-3/4 x 42 x 22 In . ( 151 8 x 10 60 x 559 mm)
115 Lbs. (52 Kg. )
656 Lbs. (298 Kg .)
65 Gal. (246 L.) 47 Gal. (178 L.)
24- 1/2 x 42 I n. (622m m x 10 67m m)
48 x 33 In. ( 121 9mm x 83 8mm )
14 In. ( 356mm )
38 Lbs./ Sq. F t. (185 Kgs /Sq . m .)
27. 8
47. 4
GENERAL SPECIFI CATIONS F OR 3574
AIR BATH SYSTEM
INS TALLE D SIZ E WEI GHT WEI GHT w /WATE R GAL . TO OVERF LOW MIN . OPE RATIN G G AL. BAT HING WELL AT SUMP BAT HING WELL AT RIM WAT ER DE PTH T O O VERFL OW FLO OR LO ADING (PR OJECT ED AR EA) PTS . CUB E (FT3)
ELECTRI CAL SPEC IFICATION S
1.0 HP, 10 AM PS, 120V .BLOWER
7 2 x 4 2 x 2 2 In. (18 29 x 1067 x 559 mm)
127 Lbs. (58 Kg.)
785 Lbs. (356 Kg.)
79 Gal. (299 L.) 58 Gal. (219 L.)
22- 1/2 x 54 I n. (5 72mm x 13 72mm)
60 x 33 In. ( 1524m m x 838mm )
14 In. ( 356mm )
37 Lbs./ Sq. F t. (1 85 K gs/Sq . m.)
25. 6
49. 4
GENERAL SPECIFIC ATIONS F OR 3575
AIR BATH SYSTEM
INS TALLE D SIZ E WEI GHT WEI GHT w /WATE R GAL . TO OVERF LOW MIN . OPE RATIN G GAL . BAT HING WELL AT SU MP BAT HING WELL AT RI M WAT ER DE PTH T O OVE RFLO W FLO OR LO ADING (PR OJECT ED AR EA) PTS . CUB E (FT3)
ELECTRI CAL SPECI FICATIONS
1.0 HP, 10 AM PS, 1 20V.BLOWER
ELLISSE OVAL
MODEL 2709 AIR BATH
TOWN SQUARE® 5' x 42"
MODEL 2748 AIR BATH
TOWN SQUARE® 6' x 42"
MODEL 2742 AIR BATH
GREEN TEA™ 5' x 36"
MODEL 3571 AIR BATH
GREEN TEA™ 6' x 36"
MODEL 3573 AIR BATH
GREEN TEA™ 5' x 42"
MODEL 3574 AIR BATH
GREEN TEA™ 5-1/2' x 36"
MODEL 3572 AIR BATH
GREEN TEA™ 6' x 42" MODEL 3575 AIR BATH
754063-100 Rev. B
6
Page 7
60-1/4"
35" 36"
1" 5-1/" 34-1/"
1530mm
mm 14mm 43mm
146mm
76mm
66-1/4"
35" 36"
1" 64-1/" 34-1/"
163mm
mm 14mm 43mm
163mm
76mm
7-1/4"
35" 36"
1" 70-1/" 34-1/"
135mm
mm 14mm 43mm
171mm
76mm
60" 40-3/4" 41-3/4"
1" 5-1/4" 40-1/4"
154mm 1035mm 1060mm
43mm 140mm 10mm
7-1/4"
41" 4"
1" 70-1/" 40-1/"
135mm 1041mm 1067mm
43mm 171mm 10mm
INSTALLATION AND FRAMING INSTRUCTIONS:
The variety of installations possible for this air massage system may require framing procedures other than those shown. Locate studs as required. Ensure roughing-in dimensions are proper, plumb and square. Provisions must be made in all installations for an access opening for servicing the air blower and controls. It is strongly recommended that an additional opening be provided for access to the drain components. The apron should not be used as the primary access opening.
1. Position the air massage system into the installation opening and level the deck in both directions, shimming the integral feet with attached baseboard as necessary. Refer to the Air Bath Installation Table for nominal installation dimensions. Mark the final position of the underside of the deck by tracing a line on to the studs (see Figure 1).
. Remove the air massage system and attach a 1 x 4 stringer to the studs, with the top of the
stringer touching the traced line.
The rim of the bath must not support weight.
TYPICAL PIER TYPE INSTALLATION
AS DESIRED
F
CUTOUT
AS DESIRED
E
CUTOUT
D
4
(610 mm)
1
(305 mm)
MOUNTING SURFACE
WATERPROOF SEALANT
BATH
TYPICAL RECESS INSTALLATION
4
(610 mm)
1
(305 mm)
D
A
B
C
LEVELING STRINGERS
TILE
TILE BEAD STRIP
LEVELING STRINGER
1 x 4 (not for support)
BATH
ADHESIVE
SEALANT
WALLBOARD
NOTE: Tile bead kit not included and must be purchased separately.
D
TYPICAL INSTALLATION
FIGURE 1
3. Install supplied cable drain components to the air massage system according to the enclosed drain installation instructions. Before replacing your air bath for final installation, be certain that an opening has been provided in the sub-floor for the drain. See the roughing-in drawing for suggested opening size (shadowed) and location dimensions. The drain/overflow of the bath extends below the bottom of the bath. Note that this requires a cutout in the floor.
4. Replace air massage system and re-shim the integral support feet with attached baseboard, shimming the entire length of the baseboard as needed. Secure the shims using construction adhesive, silicone or equivalent materials.
The rim of the bath must not support weight. Any finish material such as tile or wall board must be
self-supporting if it contacts the deck of the bath.
!
!
ACCESS PANEL MUST BE LOCATED ON THE SAME SIDE AS THE MOTOR.
ALLOW OPEN FRAMING ON PUMP/MOTOR END FOR SERVICE.
ACCESS PANEL MUST BE LOCATED ON THE SAME SIDE AS THE BLOWER.
ALLOW OPEN FRAMING ON BLOWER END FOR SERVICE.
UNLESS AN ACCESS OPENING OF AT LEAST 12" X 24" (305 X 610mm)
IS PROVIDED, WARRANTY SERVICE WILL NOT BE PERFORMED.
UNLESS AN ACCESS OPENING OF AT LEAST 12" X 24" (305 X 610mm)
IS PROVIDED, WARRANTY SERVICE WILL NOT BE PERFORMED.
NOTE:
FRONT EDGE OF BATH MUST BE SUPPORTED BY STUD WALL OR AMERICAN STANDARD APRON KIT
** USE CUTOUT TEMPLATE PROVIDED FOR 70 MODEL
NOTICE:
DO NOT BUILD THE SURROUNDING STRUCTURE BEFORE RECEIVING YOUR AIR BATH. STRUCTURE MEASUREMENTS SHOULD BE VERIFIED AGAINST THE ACTUAL AIR BATH RECEIVED TO ENSURE PROPER FIT.
AIR BATH INSTALLATION TABLE
DIM.
DESCRIPTION
A B C D E F
5-3/4" 3-3/4" 41-3/4"
1" 5"
40-1/"
151mm 1511mm 1060mm
533mm 1473mm 101mm
Nominal tub length recess opening Nominal tub apron support opening Nominal tub width recess opening Nominal tub height opening Nominal tub length cutout Nominal tub width cutout
71-3/4" 3-3/4" 41-3/4"
0" 70"
40-1/4"
13mm 1511mm 1060mm
50mm 177mm 10mm
1-1/"
67"
36-1/"
45mm
170mm
7mm
**
2748 2742
AIR BATH MODEL NUMBER
2709
3571 3572 3573 3574 3575
7
754063-100 Rev. B
Page 8
All wiring must be performed by a licensed electrician in accordance with the national electrical code and all other applicable codes.
WARNING: When using electrical products, basic precautions should always be observed, including the following:
1. DANGER: RISK OF ELECTRIC SHOCK! Connect only to a circuit protected by a ground-fault circuit interrupter.
2. Permit access for servicing blower as noted.
3. All building materials and wiring should be routed away from the air blower.
AIR MASSAGE SYSTEM
ELECTRICAL INSTALLATION INSTRUCTIONS
ELECTRICAL DIAGRAM
READ AND FOLLOW ALL INSTRUCTIONS
WIR E SE L ECT I ON G UID E
Max i mum dis t anc e fr o m
fus e box to m oto r
The siz e s s h own on t his
cha r t a r e r e com m end a tio n s
for cop p er c ond u cto r s
onl y . A lwa y s f o llo w
loc a l a n d n a tio n al
ele c tri c al c ode s
Mot o r
Hi P erf o rma n ce
Rat i ng
2.1 H.P . ,
1.4 H.P . ,
and 1.2 5 H. P .
50' 1 0 0'
115 V Po w er L ine
150 ' 200 '
12 10 8 8
AIR MASSAGE SYSTEM:
The air bath should be installed on a 10 vac, 15 or 0 amp dedicated circuit. The circuit should be hard-wired from the electrical power supply panel. The circuit must be a three (3) wire circuit from the electrical supply panel. A grounded neutral wire and a third wire, earth ground, are essential.
!
USE 15 OR 20 AMP
GFCI OUTLET
AIR BLOWER
CHROMATHERAPY LIGHT
CONTROL BOX (OPTIONAL)
BL AC K
WH IT E
120 VAC
GND .
754063-100 Rev. B
Page 9
Please note that care must be taken to protect the surface of the tub during all aspects of the installation. Do not drill or cut the bath deck with the tub directly beneath it as damage to the tub may result.
1. Install the tub per the installation instructions provided with the unit. . Prepare the bath deck support structure per the local codes. Note - the bath deck must be self supporting.
3. Cut bath deck to your specifications.
4. Place the bath deck in position and trace the opening on the tub with a soft pencil. Do not drill or cut the bath deck with the tub directly beneath it as damage to the tub may result.
5. Remove the bath deck and apply a generous bead of waterproof sealant on the outer edge of the traced line.
6. Replace the bath deck and secure it into place.
7. Apply additional sealant along the tub and bath deck interface as necessary to ensure a watertight seal.
. Remove excess sealant per the manufacturer's instructions.
Finished bath deck surface material must be
self-supporting and secured per local codes
Tub support structure per installation instructions provided with the tub
Bath deck support material
Bathtub
Waterproof
Sealant
UNDER DECK MOUNTING INSTRUCTIONS
DRAIN STOPPER
WITH
ADJUSTABLE
BOLT
METAL STRAINER
BOLT
METAL
STRAINER
FLAT RUBBER
GASKET
DRAIN WASTE
FLANGE
OVERFLOW
ASSEMBLY
OVERFLOW NUT WITH O-RING
OVERFLOW
ESCUTCHEON
PLASTIC DRAIN BASE
DRAIN ACTUATOR SHAFT
SET
SCREW
AIR BATH NUT
WITH WASHER
AND GASKET
OVERFLOW
RETAINER
WEDGE
GASKET
CLOSE
OPEN
OVERFLOW
ASSEMBLY
VERTICAL
DRAIN PIPE
HORIZONTAL
DRAIN PIPE
PLASTIC
DRAIN BASE
0˚ ELBOW
AIR BATH DRAIN ILLUSTRATION
With supplied cable drain assembled to bath, connect drain outlet to waste line in accordance with the drain assembly instructions. Tighten all drain joints securely. Check the couplings and make sure they are hand-tight. Clean the air bath and fill with water to a point " below the overflow. Recheck the couplings and make certain that they are not leaking. (Although the couplings are factory tightened and inspected, some loosening may have occurred during transit.) Make sure the air bath is connected to the electrical supply and turn the air bath on. Check for leaks around all piping connections while the air bath is running.
DRAIN CONNECTION AND
SYSTEM TEST
(before installing bath into
framed out structure)
754063-100 Rev. B
Page 10
DRAIN CONNECTION
1. Remove and identify all drain components as defined in air bath drain illustration.
2. Find 1" schedule 40 PVC pipe, see pipe chart, HORIZONTAL DRAIN PIPE. Mark as "horizontal pipe", drain to elbow section.
3. Find 1" schedule 40 PVC pipe, see pipe chart, VERTICAL DRAIN PIPE. Mark as "vertical pipe", drain to elbow section.
4. Install drain from below unit through opening as shown in photo A.
5. Apply 3 or 4 pea sized dabs of 100% silicone sealant to bottom waste drain flange and press flat rubber gasket into place as shown in photos B and C.
6. Apply 1/" continuous bead of 100% silicone sealant to flat rubber gasket as shown in photo D. Set aside and be sure not to disturb silicone bead.
7. Apply 1/" continuous bead of 100% silicone sealant to back side to metal strainer as shown in photo E. Press Strainer retaining bolt into metal strainer and insert into drain hole of acrylic bath.
A.
B.
C.
D.
E.
HORIZONTAL
PIPE
VERTICAL
PIPE
MODEL
74
74
70
3571
357
3573
3574
3575
10.50"
1.00"
11.00"
1.75"
1.50"
1.75"
1.5"
1.50"
6.50"
6.50"
4.75"
5.75"
6.00"
5.75"
5.75"
5.75"
PIPE CHART
754063-100 Rev. B
10
Page 11
DRAIN CONNECTION continued...
8. Have assistant take drain assembly from step 6 and place over back surface of drain hole to engage the metal strainer bolt.
Secure plastic drain base to metal strainer in drain opening using nut driver shaft. DO NOT OVER TIGHTEN! Carefully remove excess silicone from acrylic surface as directed by silicone sealant directions.
9. From unit back side, overflow nut should be in alignment with overflow opening, as shown in photo F.
10. Slide air bath fitting nut, washer and gasket onto air bath fitting as shown in photos G and H.
11. Assemble air bath fitting to plastic drain base as shown in photos I, J, K and L. Hand tighten nut to create watertight joint.
F.
G.
H.
I.
J.
K.
L.
Overflow nut
O-ring
Air bath
fitting
11
754063-100 Rev. B
Page 12
DRAIN CONNECTION continued...
12. Apply PVC cement to Horizontal Drain Pipe PVC and assemble to 0 degree elbow.
13. Dry fit Vertical Drain Pipe PVC into overflow assembly, then insert into elbow, WITHOUT PVC GLUE to align drain and overflow to bath. Mark overflow female coupling as shown in photo M.
14. Test fit and trim pipe as required to get overflow drain into center of overflow hole BEFORE GLUING vertical pipe into 0 degree elbow, as shown in photos N-1 and N-2.
15. Apply PVC cement to Vertical Drain Pipe sub-assembly and assemble per re-aligned marks from step 13.
16. Disassemble overflow wedge gasket and chrome overflow retainer as shown in photo O.
17. Place overflow wedge gasket onto plastic overflow pipe flange with round raised rib surface contacting flange as shown in photo P.
O.
M.
P.
N-1. N-2.
754063-100 Rev. B
1
Page 13
DRAIN CONNECTION
continued...
18. Tighten chrome overflow retainer onto drain overflow assembly pipe per photo Q below.
19. Align flat on drain actuator shaft with corresponding flat in chrome metal overflow escutcheon and tighten set screw to fix overflow escutcheon in place per photos R and S.
20. Rotate left and right lightly to feel stops in drain cable control. This opens and closes drain.
21. Place drain stopper into drain waste hole as shown in photo T.
22. The drain stopper should prevent water from draining out of tub when the escutcheon is in the fully counterclockwise
position as shown in photo U. Adjust the drainstopper bolt to obtain the best water seal in the tub.
23. Rotate Drain Escutcheon to clockwise stop. This should open drain, between 1/" and 1/4", to allow water to exit bath. If not adjust metal bolt in drain stopper to allow draining function, but not so high that drain will not seal when closed to hold water during use. See photo V.
Q.
R.
U.
S.
V.
T.
13
754063-100 Rev. B
Page 14
POST INSTALLATION CLEAN-UP
Remove all construction debris from bath. Tile grout can be removed with a wooden popsicle stick or tongue depressor. Do not use wire brushes or any other metal implement on bath surface.
Post installation clean-up generally can be completed using warm water and liquid dishwashing detergent. Stubborn dirt or stains may be removed using granular Spic and Span® mixed with water.
Painter's naphtha can be used to remove excess adhesives and/or wet oil-base paint.
AFTERCARE and CLEANING
• The high gloss surface is resistant to impact and chemicals and will retain its lasting luster with proper care and maintenance.
• Always fill the tub with temperate water. Excessively hot water may cause surface damage
• Clean after use with a mild liquid household detergent cleaner. Do not use Lestoil, Lysol Disinfectant (spray or concentrate), or Lysol Basin, Tub and Tile Cleaner, Windex, Mr. Clean, Dow Disinfectant Bathroom Cleaner, or cleaning products in aerosol cans.
HARSH CHEMICALS SHOULD NEVER BE USED ON ACRYLIC SURFACES.
• Do not use wire brushes, knives or sharp objects to remove stains, cigarette tar deposits,or other surface blemishes.
• Abrasive cleaners or powders must not be used, since they will dull the surface. If the glossy surface looses its sheen, dulled areas can be restored by rubbing with a white "automotive type" polishing compound and waxing with a "liquid wax."
Do not wax areas where you walk or stand.
• Do not allow nail polish remover, acetone, dry cleaning fluid, paint remover or other solvents to come into contact with the surface.
• Clean the surrounding surface immediately after using caustic drain cleaners.
• Burning cigarettes will damage the surface.
• Should damage to the fixture occur, repairs can be made quickly and easily. Your distributor or builder can provide details.
• Do not permit drain cleaner to enter the circulation system.
754063-100 Rev. B
14
Page 15
REMOTE BLOWER LOCATION OPTION
IMPORTANT! It is not necessary that the blower motor be relocated. This option is provided for the case that a particular
installation makes this effort practical.
NOTE:
Relocating blower motor from factory installed location, see photo W, will require disassembly of air blower from mounting board. Keep all hardware for reattachment at new location. Additional hardware will be required depending upon final desired position of air blower. Follow all instructions listed below.
NOTE: Installing the blower in a remote location will reduce the system efficiency.
NOTE: Relocating a blower motor still requires a service access for the blower.
NOTE:
All materials needed for the relocation must be supplied by the installer. This includes ordering a longer control panel cable (P/N 75405-0071A).
A separate circuit, which must be protected by the Ground Fault Circuit Interrupter (GFCI), is required in the remote location. Electrical connections should be performed by a licensed electrician.
Choose a space as close to the bath as possible so the system works as efficiently as possible. The space must be at least 30 cubic feet and the blower must be mounted at least  inches above the floor and  inches minimum away from any wall. The blower must NOT be installed in an attic area.
The blower motor must be located within 1 feet of rigid piping from the bath air manifold. This limitation is for the total pipe length and applies to any direction changes and elbows. There can be no more than six changes of direction. There should be as few direction changes as possible and the piping installation must meet all requirements of local plumbing and building codes.
Disconnect the blower from the flexible hose as shown in photo X. Do NOT remove the check valve manifold that is mounted to the underside of the air bath. The manifold MUST remain mounted above the tub overflow level as shown in X.
Use 1 1/” PVC rigid piping and couplings to extend the blower motor location as shown in photos Y and Z. Detach the flexible hose section from the blower end and extend the air line by adding the appropriate length of PVC piping. Mount the blower in a horizontal direction using the mounting screws provided with the air bath system. Do NOT glue piping to either the manifold or blower. These couplings MUST be attached to the piping with screws as shown in photos Y and Z. Glue only the PVC piping and couplings needed to extend the air line. Let the glued couplings set overnight before attaching the blower and manifold couplings with screws.
CAUTION: It is imperative to let the glued piping set overnight as there may be fumes from the glue that could be ignited if not allowed to dissipate.
W.
X.
Y. Z.
TYPICAL VIEW
TYPICAL VIEW
Do NOT move check valve manifold
15
754063-100 Rev. B
Page 16
By Mail: American Standard Inc. P.O. Box 65 West Caldwell, N.J. 07007 Attention: Customer Care Center
AS America, Inc. Limited Lifetime Warranty for Premium Acrylic Air Baths
AS America, Inc. (”American Standard”) warrants to the original consumer purchaser that it will, at its option, repair or replace this whirlpool or any of its parts that are found by American Standard, in its sole judgment, to be defective under normal residential use and maintenance so long as it is owned by the original consumer purchaser.
This warranty shall only become effective upon receipt by American Standard of a completely filled out Warranty Registration Card evidencing proof of purchase.
This limited warranty does not apply to commercial installations. The warranty for commercial installations is three (3) years.
THIS WARRANTY SHALL BE VOID IF THE ACCESS PANEL TO THE WHIRLPOOL IS COVERED IN ANY MANNER CONTRARY TO THE INSTALLATION INSTRUCTIONS. In no event will American Standard be liable for the cost of repair or replacement of any installation materials including but not limited to tiles, marble etc.
This limited warranty DOES NOT COVER the following:
1. Defects or damages arising from shipping, installation, alterations, accidents, abuse, misuse, lack of proper maintenance and cleaning as directed in the owner’s manual and use of other than genuine American Standard replacement parts, in all cases whether caused by a plumbing contractor, service company, the owner or any other person.
. Deterioration through normal wear and tear and the expense of normal maintenance.
3. Commercial application.
4. Options and accessories. American Standard’s limited warranty on these items is one year for parts only and excludes labor. This one year limited warranty covers accessories manufactured by American Standard (e.g. aprons, drains, grab bars, heaters, trim kits) against defects of material or workmanship. Warranty coverage begins on the date the accessory was originally purchased by the owner.
5. Postage or shipping costs for returning products for repairs or replacement under this limited warranty and labor or other costs incurred in connection with product removal or installation under this limited warranty.
6. ANY LIABILITY FOR CONSEQUENTIAL OR INCIDENTAL DAMAGES, ALL OF WHICH ARE HEREBY EXPRESSLY DISCLAIMED, OR THE EXTENSION BEYOND THE DURATION OF THIS LIMITED WARRANTY OF ANY IMPLIED WARRANTIES, INCLUDING THOSE OF MERCHANTABILITY OR FITNESS FOR AN INTENDED PURPOSE. (Some jurisdictions do not allow limitations on how long an implied warranty lasts, or the exclusion or limitation of incidental or consequential damages, so these limitations and exclusions may not apply to you.)
7. Responsibility for compliance with local code requirements. (Since local code requirements vary greatly distributors, retailers, dealers, installation contractors and users of plumbing products should determine whether there are any code restrictions on the installation or use of a specific product.)
This warranty gives you specific legal rights. You may have other legal rights that vary from state to state. For service under this warranty, you should contact the following:
By Telephone:
1-800-442-1902
754063-100 Rev. B
16
Loading...