THANK YOU...for selecting American Standard . . . the benchmark of fine quality for over 100 years.To ensure that
your installation proceeds smoothly--please read these instructions carefully before you begin.All you need to finish the installation are your selected fittings.(Certain installations may require professional help.) Also be sure your installation conforms to local codes.
GENERAL INSTALLATION INFORMATION
Carefully uncrate and inspect your new bath and tub frame for any shipping damage. If such damage is found, report it to your vendor immediately.
Protect all finished surfaces of the bath frame during construction and installation using a drop cloth. If packaging foam is removed for inspection purposes, save for frame installation procedure.
Fittings (bath filler, drain, and water supplies) are not provided with the bath and must be ordered separately.
List of Required Components (not included):
• 1593.170.295 Drain*
• 9116.017.295 Bath Filler*
• 9117.012.295 Water Supplies w/deck risers* * Available at your American Standard Distributor
List of Required Tools and Supplies: Tools:
• Drill
• Drill bits for wood or tile
• Level
• Tape Measure
• Pipe Wrench
• Crescent Wrench
• Slip Joint Pliers
• Screw Driver
• Standard Woodworking Tools
• Personal Safety Equipment
• Caulking Gun
• Torque Wrench with 1/2" Socket
• #2 Square Drive
Supplies
• Putty
• Painter's Tape
INSTALLER: PLEASE LEAVE THESE INSTRUCTIONS WITH HOMEOWNER AS THEY PROVIDE IMPORTANT CLEANING INFORMATION.
FOR AFTER-SALES SERVICE CALL 1 (800) 442-1902
WEEKDAYS.
© American Standard Inc. 2004 All product names listed herein are trademarks of American Standard Inc. unless otherwise noted.
SUGGESTED LOCATION FOR BATH FILLER (MOUNTING HOLES
(146mm)
14-1/4
(362mm)
(1111mm)
C/L OF OVERFLOW
5-3/4
43-3/4
CAST METAL DESIGN INSERTS
PANELED INSERTS
6 (152mm)
BY OTHERS)
(933mm)
C/L OF DRAIN
26-3/4
(679mm)
3 (76mm)
FINISHED
1-3/8 O.D. TAILPIECE
36-3/4
BATH RIM
FLOOR
70 (1778mm)
SUPPORT LEGS
HC
73-3/4
(1873mm)
C/L OF 1/2 NPTS
7 (178mm)
3-1/2 (89mm)
OUTLINE OF
SKID RESISTANT
SURFACE
(114mm)
4-1/4
(108mm)
2
(51mm)
(635mm)
1/2 N.P.T.S. INLETS
4-1/2
25
SUPPLIES
VIEW
8
(203mm)
3-1/4
(83mm)
40-3/8 (1026mm)
SUPPORT LEGS
14
(356mm)
GENERAL SPECIFICATIONS FOR 2742 BATHING POOL
INSTALLED SIZE
WEIGHT WEIGHT w/WATER GAL. TO OVERFLOW. BATHING WELL AT SUMP BATHING WELL AT RIM WATER DEPTH TO OVERFLOW FLOOR LOADING (PROJECTED AREA) PTS.
CUBE (FT3)
73-3/4 x 43-3/4 x 25 In.
(1873 x 1111 x 635mm)
114 Lbs. (66 Kg.)
748 Lbs. (340 Kg.)
76 Gal. (288 L.) 41 x 21-1/2 In. (1041 x 546mm) 62 x 31-3/8 In. (1575 x 797mm)
15-3/4 In. (400mm)
36 Lbs./Sq. Ft. (174 Kgs/Sq. m.)
27.8
55.7
1. Identify desired location of the tub. Please note: the floor area suppor ting the tub and frame
must be capable of supporting a load in excess of 2000 lbs.The supplies and drain must not interfere with the floor joists (see rough-in for dimensions).
2. Place the wood frame, finished side down, on a soft surface to prevent scratching (an old blanket or quilt may be suitable).
3. Remove the unfinished shipping supports from each cor ner by remov­ing the four (4) wood screws in each cor ner. (Save the screws for attaching the legs).
4.Take a leg and insert it into the underside of the frame. Be sure to have the studs protrude thru the opening in the corner of the frame (see photo #1).
5. Using the wood screws from step #3, attach the leg to the frame.
6. Slide the cor ner bracket over the studs and, using the nuts and wash­ers provided, secure the bracket to the frame (see photo # 2). Alternating between the nuts, tighten to 10 ft-lbs.Do not overtighten!!
7. Repeat steps 4 thr u 6 for the remaining legs.
8. Assemble the jam nuts and lock nuts on the leveler bolt and screw it into the threaded insert located on the bottom of the leg (see photo #3). Note – the bottom of the leveler bolt should be 1" from the bottom of the leg.
9. Repeat for the other legs
10.Turn the frame over and place it in position on the floor.Adjust the
levelers so that frame is level. Please note that the maximum
adjustment is 1/8" up or down. Shimming the legs is prohibit­ed. Additional adjustment must be accommodated in the floor as required.
11. Slide the anti-tip bracket over the leveler as shown in photo #4.
12.Trace the outline of the bracket onto the floor.
13. Repeat for the remaining legs.
14. Move the frame about 1 ft. in the direction of the opening on the anti-tip bracket. Note - all
brackets must have the opening pointing in the same direction.
15. Place the anti-tip bracket on the floor within the outline drawn in step # 16 and trace the two
holes onto the floor.Note - all brackets must have the opening pointing in the same direc-
tion.
16. Dr ill the holes in the floor using a 3/8" drill bit and install the inserts using the supplied hex key
wrench.
752846-100 Rev. C
2
#1
#2
#3
#4
17. Attach the anti-tip bracket to the floor using the 1/4- 20 socket
head bolts and hex key wrench (see photo #5).
18. Repeat for the remaining brackets.Note - all brackets must have
the opening pointing in the same direction.
19. Slide the frame into position. The leveler should touch the inside of
the bracket as shown in photo #6. Tighten the lock nut onto the bracket so that it is snug.
20. Place the tub into the frame making sure that it is centered in the
frame.
21. Check to see if the center suppor t is within 1/16" of the floor. Make
adjustments to the levelers as necessary.
22.Trace the outline of the center support onto the floor, firmly tighten
the jam and lock nuts, and raise the tub off of the frame.
23. Apply 1/4" beads of the neutral cure silicone (supplied) 1" apar t to
the floor within the outline
24. Lower the tub down to the floor so that center suppor t compresses
the silicone and the deck edges make contact with the frame.
25. Using the pre-dr illed holes in the frame at the lumbar end, drive two
(2) screws thru the underside of the frame and into the wood blocks attached to the bathtub (see photo #7).
26. Repeat on the opposite end
27. Wipe the excess silicone from the floor using mineral spirits
28. Using the pre-dr illed holes in the frame on the long side, drive four
(4) wood screws thru the underside of the frame and up into the wood blocks attached to the bathtub.
29. Repeat on the other side.
30.Take two (2) of the leg covers and position them on the legs as
shown in photo #8. Note – the V-notch should overlap and be on
the outside of the legs so that the holes cover the slots.
31. Using a non-marr ing clamp, tighten the covers against the leg (see
photo #9).
32. Using the # 33 dr ill bit supplied, drill a pilot hole 1/2" deep into the outside of the leg at the top
hole.
33. Attach the cover to the leg where the pilot hole was drilled using the #6 x 3/8" pan head screws