American Standard 2580 User Manual

Installation
Instructions
THE
COLLECTION
by
BIDET FITTING
Thank you for selecting American-Standard...the benchmark of fine quality for over 100 years.
2580
To ensure that your installation proceeds smoothly--please read these instructions carefully before you begin.
Required Tools
Flat Blade Screwdriver
Tubing Cutter
Phillips Screwdriver
Adjustable Wrench
*Wrench
*Supplied with Fitting
MOUNTING BIDET FAUCET
1
CAUTION
Place MOUNTING NUTS (1) onto the VALVE BODIES (2) and insert VALVE BODIES (2) through outside holes, from underside of the BIDET LEDGE. Drop the RUBBER RING (3) over the VALVE BODIES (2) and thread DECK ADAPTER (4) onto VALVE BODIE (2) until it locks against the internal stop.
Tighten the MOUNTING NUT (1) to secure the VALVE BODY (2).
Remove ESCUTCHEON (5), WASHER (10) and UPPER GASKET (7) from TRANSFER VALVE (8) and insert into the center forward hole of BIDET.
Replace UPPER GASKET (7), and ESCUTCHEON (5) until it locks against the internal stop. Position the side threaded outlet rearward and secure MOUNTING NUT (9).
Turn off hot and cold water supplies before beginning.
Channel Locks
Roughing-in Dimensions
BIDET OUTLINE IS SYMBOLIC
1-3/16
DRAIN INSTALLATION
2
DOUCHE SPRAY
3-7/8
DIA.
1-3/8
MAX.
FINISHED FLOOR
Certified to comply with ASME A112.18.1M U.S. Patent No. 5,819,789
TRANSFER VALVE
(FOR FLUSHING
RIM OR SPRAY)
7/8 DIA.
ADJ. 1-1/4
TO 2-1/4
1-3/8
DIA.
5-1/2
(C)
FINISHED WALL
2-1/8
DIA.
1-1/4 O.D. TAILPIECE
(H)
2-1/4
DIA.
4-1/4
FOR GROUND JOINT CONNECTION OR 1/2 " O.D. SLIP (INLETS)
REAR VIEW WITH
WALL REMOVED
M968292
STOPPER
4 3
BIDET
LEDGE
Assemble O-RING (1), WASHER (2), PIVOT
5
10
2
HOT
1
8
COLD
7
ROD (3) and NUT (4) to DRAIN BODY (5). Concave side of cup WASHER (2) is toward ball.
Thread LOCKNUT (6), WASHER (7) and GASKET (8) onto DRAIN BODY (5).
Apply a bead of PUTTY to underside of FLANGE (9).
Feed DRAIN BODY (5) up through BIDET and thread FLANGE (9) fully onto BODY (5). Tighten LOCKNUT (6) firmly, keeping the PIVOT ROD (3) pointed towards the back of the BIDET.
Push DRAIN ESCUTCHEON (10) onto TAILPIECE (11).
8 7
6
PUTTY
2
5
9
BIDET
4
1
11
CLIP
3
9
10
SPRAY INSTALLATION
3
Assemble SPRAY BODY (1) to BIDET. Apply putty to underside of SPRAY BODY FLANGE (2) to seal and secure with NUT (3).
Thread SPRAY HOSE (4) with SEAL WASHER (5) to SPRAY BODY (1). Connect other end of HOSE (4) with SEAL WASHER (6) to bottom outlet NIPPLE (7) of the TRANSFER VALVE (8).
Thread SPRAY CAP (9) onto SPRAY BODY (1).
TEE AND HOSE CONNECTION
5
Insert SEAL (1) into ADAPTER (2) and tighten ADAPTER (2) to side inlet of TRANSFER VALVE (3).
Install SEAL (4) into coupling nut of TEE (5) and tighten connection to ADAPTER (2)
Connect HOSE COUPLING NUTS (6) to Hot and Cold valve bodies and securely tighten.
Cold
6
3
8
INSTALL HANDLES
6
LEVER HANDLES:
Push ADAPTER (1) on VALVE STEM (2), so that the hole of the ADAPTER (1) without spline is facing up. See figure "A".
Thread HANDLE BASE (3) onto DECK ADAPTER (7)
Push HANDLE (4) onto ADAPTER (1).
Find correct position of HANDLE (4) by adjusting male teeth on ADAPTER (1) to female teeth in HANDLE (4).
Secure HANDLE (4) with HANDLE SCREW (5).
2
PUTTY
7
6
9
1
3
5
4
4
Unscrew LIFT ROD NUT (1) from LIFT ROD GUIDE (2).
Make sure SEAL (3) is seated into ESCUTCHEON of LIFT ROD GUIDE (2).
Drop LIFT ROD GUIDE (2) into rear hole of bidet and from below secure with LIFT ROD NUT (1).
Hot
6
LIFT ROD GUIDE INSTALLATION
DIVERTER KNOB:
Install HANDLE ADAPTER (8) onto valve stem (12).
Push DIVERTER KNOB (7) onto HANDLE ADAPTER (8).
Install RING (9) onto DIVERTER KNOB 7) and tighten with SCREW (10).
Press on KNOB CAP (11).
5
4
2
1
Front
2
3
1
Push INDEX CAP (6) in hole of HANDLE (4).
TOP
Figure "A"
SPLINE END DOWN
2
6
5
11
10
4
9
3
1
7
8
12
7
M968292
WATER SUPPLY CONNECTIONS
7
FINISH DRAIN INSTALLATION
8
NOTE: FLEXIBLE SUPPLIES ARE NOT INCLUDED AND HAVE TO BE PURCHASED SEPARATELY
Connect water supplies to FAUCET (1) with 1/2" IPS FLEXIBLE SUPPLIES (2) or 3/8" O.D. BULL-NOSE RISERS (3). Use adjustable wrench to tighten connections.
Do not over tighten. Be careful not to kink copper supply when bending. Use tubing cutter to cut to proper length.
1
2
COUPLING NUT
3
Cold
FERRULE
Position BIDET fixture and secure to floor.
Insert lift rod into lift rod guide.
Position EXTENSION ROD (1) onto POP-UP ROD (2) and tighten THUMBSCREW (3).
Remove one end of CLIP (4) from PIVOT ROD (7) by squeezing ends together while sliding.
Insert PIVOT ROD (7) into second or third hole in EXTENSION ROD (1) and reassemble CLIP (4). (EXTENSION ROD (1) may need to be bent.)
Adjust STOPPER height by repositioning EXTENSION ROD (1) and tightening THUMBSCREW (3).
Using metal TAILPIECE (5), make connection to the TRAP (6).
2
1
3
7
1
5
4
TEST INSTALLED FITTING
9
With HANDLES (1) in OFF position, turn on WATER SUPPLIES (2) and check all connections for leaks.
Operate both handles to flush water lines thoroughly. Turn DIVERTOR (6) to rim wash and bidet spray.
Operate Lift Rod (3) and fill Bidet with water. Check that DRAIN STOPPER (4) makes a good seal and retains water in Bidet. Adjust stopper height by repositioning Lift Rod (3) and tightening Thumbscrew (5).
Release DRAIN STOPPER (4) and check all drain connections for leaks. Tighten if necessary.
6
1
6
3
2
4
5
10
11
SERVICE
To change direction of handle rotation, proceed as follows:
Turn valve to OFF position. Remove HANDLE and ADAPTER if present. Remove SPRING CLIP (1). Lift STOP WASHER (2), turn 90° and replace. Replace SPRING CLIP (1). Replace HANDLE ASSEMBLY.
SPRAY (3) may accumulate dirt causing distorted and reduced water flow. Unscrew and remove SPRAY (3) and rinse clean.
Replace SPRAY (3) and operate handles several times from OFF to ON position. Do not force, handles turn only 90˚.
CARE INSTRUCTIONS:
2
90°
1
3
DO: SIMPLY RINSE THE PRODUCT CLEAN WITH CLEAR WATER. DRY WITH A SOFT COTTON FLANNEL CLOTH.
DO NOT: DO NOT CLEAN THE PRODUCT
2
WITH SOAPS, ACID, POLISH, ABRASIVES, HARSH CLEANERS, OR A CLOTH WITH A COARSE SURFACE
M968292
Loading...
+ 5 hidden pages