American Standard 2555.652 User Manual

Installation
Instructions
TOWNSQUARE
PRESSURE BALANCING BATH AND SHOWER with Built-in Diverter for RIM MOUNT TUB FILLER
with EverClean™ Finish
Congratulations on purchasing your American Standard faucet with EverClean finish found only on American Standard faucets.
EverClean Finish
• One wipe effortlessly removes spots
• Eliminates the need for cleaners and scrubbing
• Permanent surface protectant remains beautiful for the life of the faucet
• EverClean™ available on: Polished Chrome, Satin Nickel, Stainless Steel, Polished Brass (or any combination of these finishes)
To ensure that your installation proceeds smoothly-please read these instructions carefully before you begin.
ROUGHING-IN DIMENSIONS
Required Tools
Phillips Screwdriver
To assure proper positioning in relation to wall, note roughing-in dimensions.
2555.652
FINISHED WALL
1
Certified to comply with ANSI A112.18.1
.3FW
1-5/8" TO 3-1/4"
1/2" I.P.S.
Flat Blade Screwdriver
Plumbers' Putty or Caulking
Channel Locks
Adjustable Wrench
ROUGHING-IN
When soldering, remove PLASTER GUARD, CARTRIDGES and CHECK STOPS (IF PRESENT). When finished soldering,
NOTE
flush valve body, replace cartridges, check stops (if present) and plaster guard to continue installation. Use thread sealant or Teflon tape on threaded connections.
See Roughing-in diagram before starting. Connections are: 1/2" female NPT for threaded inlets Connect RISER PIPE (1) to MANIFOLD (2) top outlet marked "SHR". Connect TUB FILLER PIPE (3) at bottom outlet marked "TUB". For proper positioning the finished wall must be within side wall of PLASTER GUARD (4).
CAUTION
2" REF.
8" REF.
74" FOR HEAD CLEARANCE
7-1/2"
42 to 54" OPTIONAL
8-1/4"
3-11/16"
1-1/4
MAX.
BOTTOM OF
TUB
1/2" NPT
Turn off water at main supply.
If the valve is installed on a fiberglass or other thin wall application, the PLASTER GUARD (4) can be used as a support.
Cut a 4" dia. hole in the shower stall. Drill two additional 1" holes to allow access to the stops. Remove PLASTER GUARD (4), rotate 90 so that indicated screw holes fit MANIFOLD (2). Push CAP on valve, place ESCUTCHEON on and
attach with screws. Connect hot and cold water supplies. Cap off shower pipe (5) and tub filler pipe (6). For support, use pipe BRACES (7) secured to wooden braces. With valve turned off, turn on water supplies. Check for leaks.
FINISHED FLOOR
USUALLY BETWEEN
SHW
TUB
SPOUT MTG. SURFACE
OPTIONAL TO
65'' AND 78''
1/2" NPT
"SEE ILLUSTRATION"
1/2" NPT
˚
INLETS
OUTLETS 1/2" NPT
5-5/8"
THREADED INLETS (STOPS)
1
2
HOT
3
5-5/8"
7
COLD
6
1-3/4"
5
4
INSTALL DIVERTER
2
When finished tiling the wall, remove PLASTER GUARD (1). Remove two screws that secure the DIVERTER LID (2) and remove Lid. Inspect the inside surface of diverter port. Diverter port must be free of any dirt. Clean if necessary.
Install DIVERTER (3) with SCREWS (4) removed with DIVERTER LID (2).
Operate DIVERTER (3). DIVERTER (3) should slide in and out smoothly.
Push on DIVERTER COVER (5).
DIVERTER
PORT
2
3
4
5
1
INSTALL TRIM
3
Push CAP (1) over VALVE CARTRIDGE (2). Mount ESCUTCHEON (3) and gasket to valve body with SCREWS (4). Remove PIPE CAPS (5) from shower pipe and tub filler pipe. Install SHOWER ARM (6) and SHOWER HEAD (7).
CAUTION: Protect finish on SHOWER ARM, SHOWER HEAD and TUB SPOUT when installing.
INSTALL SPOUT
Insert SPOUT SHANK (8) through hole of MOUNTING LEDGE. Make sure that the RUBBER RING (9) is properly seated in RECESS at base of SPOUT (10).
Assemble RUBBER WASHER (11) and BRASS WASHER (12) onto SHANK (8). From underside of ledge secure SPOUT (10) into position with LOCKNUT (13).
Make pipe connections between valve body and SPOUT SHANK (8).
10
RECESS
11
13
8
1/2" NPT
9
BATHING POOL OR MOUNTING LEDGE.
12
6
5
7
1
3
2
4
1/2" NPT
5
.3FW
Loading...
+ 1 hidden pages