Installation
Instructions
LUXURY SHOWER
EXTENDER BODY SPRAYS
Thank you for selecting American-Standard...the
benchmark of fine quality for over 100 years.
To ensure that your installation proceeds smoothly-please read these instructions carefully before you begin.
Recommended Tools
1660.130
1660.140
1660.130 1660.140
Certified to comply with ANSI A112.18.1
M968617 Rev.1.2
Flat Blade Screwdriver
ROUGHING-IN DIMENSIONS
ALL CONNECTIONS 1/2" NPT
74mm D.
(2-15/16")
1660.130 Multifunction
Round Body Spray
26mm
(1")
2-1/4" DIA.
(57mm) Hole Saw
(75.6-82.6mm)
2-15/16" - 3-1/4"
12mm
(1/2")
75mm
(3")
Teflon Tape
Electric Drill
1660.140 Multifunction
Square Body Spray
15°
FINISHED WALL
54mm D.
(2-1/8")
57mm D.
(2-1/4")
HOLE SIZE
(63.6-70.6mm)
2-1/2" - 2-3/4"
35mm
(1-3/8")
1/2" NPT
INSTALL SUPPLY PIPING
1
Provide a “Installation Hole” 2-1/8" - 2-3/8" DIA., (54-60mm) and 3-1/4", (83mm) deep. Note: The “Installation Hole”
must be clear to allow body spray clearance.
Install the ELBOW (1) on a support within the wall at the *dimension shown. Secure with
two M5 SCREWS (2) (not provided).
83mm
54-60mm
(2-1/8" - 2-3/8" DIA.)
(3-1/4")
CAUTION
1
{
“Installation Hole”
2
Turn off hot and cold water
supplies before beginning.
54-60mm
(2-1/8" - 2-3/8" DIA.)
“Installation Hole”
FINISHED WALL
82.6mm
(3-1/4")
2
*63.6-70.6mm
(2-1/2" - 2-3/4")
*75.6-82.6mm
(2-15/16" - 3-1/4")
WALL SUPPORT
1
INSTALL PLASTER GUARD
2
Make sure the O-RING (3) is installed on the PLASTER GUARD (1).
Install the PLASTER GUARD (1) into ELBOW (2). Note: The finished wall must be between the Min. & Max.
lines on the PLASTER GUARD (1).
Complete all tiling and wall work. When walls are finished remove PLASTER GUARD (1).
FINISHED WALL
1
MAX.
(LINE MARK)
MINIMUM
(LINE MARK)
REMOVE
INSTALL
3
1
2
3
2
M968617 Rev.1.2