Ambirad VS(A)15UT4, VS(A)15UT, VS(A)20UT, VS(A)25UT, VS(A)30UT User guide

...
Page 1
SERVICING & COMMISSIONING MANUAL
FOR VISION
®
VS RANGE
OF RADIANT TUBE HEATERS
INDEX Section
Introduction & Document Index Installation Requirements-------------------------------------------------1
Commissioning Instructions----------------------------------------------2 Servicing Instructions------------------------------------------------------3 Spare Parts-------------------------------------------------------------------4 Fault Finding Guide --------------------------------------------------------5 Replacing Parts -------------------------------------------------------------6 User and Operating Instructions ----------------------------------------7
WARNINGS
AmbiRad equipment must be installed and maintained in accordance with the relevant provisions of the Gas Safety (Installations and Use) Regulations 1998 for gas fired products. Due account should also be taken of any obligations arising from the Health and Safety at Works Act 1974 or relevant codes of practice. In addition the installation must be carried out in accordance with the current IEE wiring regulations (BS 7671), BS 6896:2005 (Industrial & Commercial) and any other relevant British Standards and Codes of Practice by a qualified installer. All external wiring MUST comply with the current IEE wiring regulations.
Page 2
Introduction.
Welcome to the new range of high efficiency AmbiRad Vision radiant tube heaters. Local regulations may vary in the country of use and it is the installers responsibility to ensure that such regulations are satisfied All installation, assembly, commissioning and service procedures must be carried out by suitable qualified competent persons to the statutory regulations in the country of use. When assembling, installing, commissioning and servicing is undertaken on radiant tube heaters specified in these instructions, due care and attention is required to ensure that working
Document Index.
1 Installation Requirements
1.1 Health & Safety
1.2 Model definitions
1.3 Technical Details
2 Commissioning Instructions
2.1 Tools Required
2.2 Balancing the Herringbone System
2.3 Balancing a DL System
2.4 Commissioning Chart for VS Unitary Heaters
3 Servicing Instructions
3.1 Tools required
3.2 Burner Description
3.3 Burner Removal
3.4 Burner Gas Injector Servicing
3.5 Burner Head and Electrode Servicing
3.6 Combustion Fan Assembly Induced Burner
at height regulations are adhered to at the mounting heights specified.
PLEASE READ this document prior to
installation to familiarise yourself with the components and tools you require at the various stages of assembly.
All Dimensions shown are in mm unless otherwise stated.
The manufacturer reserves the right to alter specifications without prior notice.
3.7 Combustion Fan Assembly Forced Burner
3.8 Radiant Tube Servicing
3.9 Reflector Servicing
3.10 Inspection of Flue
3.11 Re-commissioning after Service
4 Spare Parts 5 Fault Finding Guide 6 Replacing Parts
6.1 Burner Controller Replacement
6.2 Air Pressure Switch Replacement
6.3 Gas Valve Replacement
7 User and Operating Instructions
7.1 To Start Heater
7.2 To Switch off Heater
7.3 Routine Maintenance Between Service Intervals
7.4 Frequency of Servicing
1. Installation Requirements.
Isolate any electrical supply to the heater and controller before proceeding.
1.1 Health and Safety
AmbiRad heaters must be installed in accordance with the relevant provisions of the Gas Safety (Installations and Use) Regulations
1998. Due account should also be taken of any obligations arising from the Health and Safety at Works Act 1974 or relevant codes of practice. In addition the installation must be carried out in accordance with the current IEE wiring regulations (BS 7671), BS 6896:2005 (Industrial & Commercial) and any other relevant British Standards and Codes of Practice by a qualified installer. Isolate all electrical supplies to the heater & controller before proceeding.
For your own safety we recommend the use of safety boots and leather faced gloves when handling sharp or heavy items. The use of protective eye wear is also recommended.
1.2 Model Definitions
VSUT = AmbiRad Vision U Tube heater with
painted induced burner, stainless steel reflector & end caps. VSUH = AmbiRad Vision U Tube heater in Her­ringbone manifold configurations with painted induced burner, stainless steel reflector & end caps. VSLI = AmbiRad Vision Single Linear heater with painted induced burner, stainless steel re­flector & end caps. VSLF = AmbiRad Vision Single Linear heater with painted Forced burner, stainless steel re­flector & end caps. (Nat Gas ONLY) VSLH = AmbiRad Vision Linear heater in Her­ringbone manifold configurations with painted induced burner, stainless steel reflector & end caps. VSDL = AmbiRad Vision Double Linear heater with painted induced burner, stainless steel re­flector & end caps.
VSAUT, VSAUH, VSALI, VSALF, VSALH & VSADL = As above except: aluminised reflector
with no end caps.
2
Page 3
1.3 Technical Details.
Tables 1a/b/c/d & e - Natural Gas (G20)
No of Injectors
Gas Connection
Flue Nominal Bore mm (in)
Unitary Fan Motor Details
Heater Model
VS(A)15UT4 VS(A)15UT VS(A)20UT VS(A)25UT VS(A)30UT VS(A)35UT VS(A)40UT VS(A)45UT VS(A)50UT
Heat Input kW
Gross Nett
1
½ in BSP Internal thread
125 (5)
230 volt 1 phase 50Hz
Gas
Flowrate
(m³/hr)
15.8 14.2 1.5 11.1 1.3 260x2219x670 41 0.5 2501
15.0 13.5 1.4 10.7 1.3 240x3417x500 43 0.5 2501
19.5 17.6 1.9 10.8 1.5 240x4142x500 50 0.5 2501
23.5 21.2 2.3 8.0 1.8 240x5066x500 60 1.0 2507
29.5 26.5 2.8 9.5 2.0 240x6029x500 70 1.0 2507
36.0 32.4 3.4 9.7 2.3 260x5709x670 92 1.0 2507
40.0 36.0 3.8 12.2 2.3 260x5709x670 92 1.0 2507
44.0 39.6 4.2 8.9 2.9 260x7471x670 121 0.5 2560
48.0 43.2 4.6 9.1 2.5 260x7471x670 121 0.5 2560
Injector
Pressure
(mbar)
Injector
Size
(mm)
Size
(h x l x w)
Weight
(Kg)
Fan
Rating
(A)
Fan
Type
Heater Model
VS(A)15LF6 VS(A)15LF8 VS(A)20LF7 VS(A)20LF10-5 VS(A)25LF8 VS(A)25LF10-5 VS(A)30LF10-5 VS(A)30LF12-5
VS(A)35LF10-5
VS(A)35LF13-5 VS(A)40LF13-5 VS(A)40LF16 VS(A)45LF13-5
Heat Input kW
13.8 12.4 1.3 9.8 1.3 390x5984x315 43 0.5 2501
13.8 12.4 1.3 9.8 1.3 390x8022x315 53 0.5 2501
19.5 17.6 1.9 12.0 1.5 390x6992x315 49 1.0 2507
19.5 17.6 1.9 12.0 1.5 390x10662x315 72 1.0 2507
23.5 21.2 2.3 9.5 1.8 390x8022x315 53 0.5 2501
23.5 21.2 2.3 9.5 1.8 390x10662x315 72 0.5 2501
29.5 26.6 2.8 11.5 2.0 390x10662x315 72 1.0 2507
29.5 26.6 2.8 11.5 2.0 390x12652x315 84 1.0 2507
36.5 32.9 3.5 11.5 2.3 390x10892x470 103 0.5 2501
36.5 32.9 3.5 11.5 2.3 390x13492x470 126 0.5 2501
40.0 36.0 3.8 12.5 2.4 390x13492x470 126 1.0 2507
40.0 36.0 3.8 12.5 2.4 390x16092x470 147 1.0 2507
45.0 40.5 4.3 11.0 2.9 390x13492x470 126 1.0 2507
Gas
Flowrate
(m³/hr)
Injector
Pressure
(mbar)
Injector
Size
(mm)
Size
(h x l x w)
Weight
(Kg)
Fan
Rating
(A)
Fan
Type Gross Nett
VS(A)45LF16 VS(A)50LF13-5 VS(A)50LF16
45.0 40.5 4.3 11.0 2.9 390x16092x470 147 1.0 2507
50.0 45.0 4.8 13.6 3.0 390x13492x470 126 1.0 2507
50.0 45.0 4.8 13.6 3.0 390x16092x470 147 1.0 2507
3
Page 4
Heater Model
VS(A)15LI8 VS(A)20LI7 VS(A)20LI10-5 VS(A)25LI8 VS(A)25LI10-5 VS(A)30LI10-5 VS(A)30LI12-5 VS(A)35LI10-5 VS(A)35LI13-5 VS(A)40LI13-5 VS(A)40LI16 VS(A)45LI13-5 VS(A)45LI16
Heat Input kW
Gross Nett
15.0 13.5 1.4 10.7 1.3 390x7917x315 53 0.5 2501
19.5 17.6 1.9 10.8 1.5 390x6907x315 49 0.5 2501
19.5 17.6 1.9 10.8 1.5 390x10537x315 72 0.5 2501
23.5 21.2 2.3 8.0 1.8 390x7917x315 53 0.5 2501
23.5 21.2 2.3 8.0 1.8 390x10537x315 72 0.5 2501
29.5 26.6 2.8 9.5 2.0 390x10537x315 72 1.0 2507
29.5 26.6 2.8 9.5 2.0 390x12567x315 84 1.0 2507
36.0 32.4 3.4 9.6 2.3 390x10787x470 103 1.0 2507
36.0 32.4 3.4 9.6 2.3 390x13387x470 126 1.0 2507
40.0 36.0 3.8 12.2 2.3 390x13387x470 126 1.0 2507
40.0 36.0 3.8 12.2 2.3 390x16006x470 147 1.0 2507
44.0 39.6 4.2 8.9 2.9 390x13387x470 126 1.0 2507
44.0 39.6 4.2 8.9 2.9 390x16006x470 147 1.0 2507
Gas
Flowrate
(m³/hr)
Injector
Pressure
(mbar)
Injector
Size
(mm)
Size
(h x l x w)
Weight
(Kg)
Fan
Rating
(A)
Fan
Type
VS(A)50LI13-5 VS(A)50LI16
Heater Model
VS(A)15LH6 VS(A)15LH8 VS(A)20LH7 VS(A)20LH10-5 VS(A)25LH8 VS(A)25LH10-5 VS(A)30LH10-5 VS(A)30LH12-5 VS(A)35LH10-5 VS(A)35LH13-5 VS(A)40LH13-5
50.0 45.0 4.8 10.0 2.5 390x13387x470 126 0.5 2560
50.0 45.0 4.8 10.0 2.5 390x16006x470 147 1.0 2507
Heat Input kW
Gross Nett
15.0 13.5 1.4 10.7 1.3 390x5725x315 42
15.0 13.5 1.4 10.7 1.3 390x7763x315 52
19.5 17.6 1.9 10.8 1.5 390x6733x315 48
19.5 17.6 1.9 10.8 1.5 390x10363x315 71
23.5 21.2 2.3 8.0 1.8 390x7763x315 52
23.5 21.2 2.3 8.0 1.8 390x10363x315 71
29.5 26.6 2.8 9.5 2.0 390x10363x315 71
29.5 26.6 2.8 9.5 2.0 390x12393x315 83
36.0 32.4 3.4 9.6 2.3 390x10633x470 101
36.0 32.4 3.4 9.6 2.3 390x13233x470 124
40.0 36.0 3.8 12.2 2.3 390x13233x470 124
Gas
Flowrate
(m³/hr)
Injector
Pressure
(mbar)
Injector
Size
(mm)
Size
(h x l x w)
Weight
(Kg)
VS(A)40LH16 VS(A)45LH13-5 VS(A)45LH16 VS(A)50LH13-5 VS(A)50LH16
40.0 36.0 3.8 12.2 2.3 390x15832x470 145
44.0 39.6 4.2 8.9 2.9 390x13233x470 124
44.0 39.6 4.2 8.9 2.9 390x15832x470 145
50.0 45.0 4.8 10.0 2.5 390x13233x470 124
50.0 45.0 4.8 10.0 2.5 390x15832x470 145
4
Page 5
Heater Model
VS(A)15UH4 VS(A)15UH VS(A)20UH VS(A)25UH VS(A)30UH VS(A)35UH VS(A)40UH VS(A)45UH VS(A)50UH
Heat Input kW
Gross Nett
15.8 14.2 1.5 11.1 1.3 260x2219x670 40
15.0 13.5 1.4 10.7 1.3 240x3417x500 42
19.5 17.6 1.9 10.8 1.5 240x4142x500 49
23.5 21.2 2.3 8.0 1.8 240x5066x500 59
29.5 26.5 2.8 9.5 2.0 240x6029x500 69
36.0 32.4 3.4 9.7 2.3 260x5709x670 91
40.0 36.0 3.8 12.2 2.3 260x5709x670 91
44.0 39.6 4.2 8.9 2.9 260x7471x670 120
48.0 43.2 4.6 9.1 2.5 260x7471x670 120
Gas
Flowrate
(m³/hr)
Injector
Pressure
(mbar)
Tables 2a/b/c & d. Technical Details - Propane Gas (G31)
Heater Model
Heat Input kW
Gross Nett
Flowrate
(l/hr)
Injector
Pressure
(mbar)
Injector
Size
(mm)
Injector
Size
(mm)
(h x l x w)
Size
(h x l x w)
Weight
(Kg)
Size
Rating
Fan
(A)
Weight
(Kg)
Fan
Type
VS(A)15UT VS(A)20UT VS(A)25UT VS(A)30UT VS(A)35UT VS(A)40UT VS(A)45UT VS(A)50UT
Heater Model
VS(A)15UH VS(A)20UH VS(A)25UH VS(A)30UH VS(A)35UH
15.2 13.7 2.16 23.7 1.2 240x3417x500 43 0.5 2501
19.2 17.3 2.73 26.1 1.0 240x4142x500 50 1.0 2507
23.5 21.3 3.34 10.8 1.3 240x5066x500 60 1.0 2507
28.0 25.2 3.98 16.2 1.3 240x6029x500 70 1.0 2507
36.0 32.4 5.12 22.4 1.4 260x5709x670 92 0.5 2560
40.0 36.0 5.68 18.4 1.5 260x5709x670 92 0.5 2560
44.0 39.6 6.25 14.9 1.7 260x7471x670 121 0.5 2560
48.0 43.2 6.82 14.3 1.8 260x7471x670 121 0.5 2560
Heat Input kW
Gross Nett
15.2 13.7 2.16 23.7 1.2 240x3417x500 42
19.2 17.3 2.73 26.1 1.0 240x4142x500 49
23.5 21.3 3.34 10.8 1.3 240x5066x500 59
28.0 25.2 3.98 16.2 1.3 240x6029x500 69
36.0 32.4 5.12 22.4 1.4 260x5709x670 91
Flowrate
(l/hr)
Injector
Pressure
(mbar)
Injector
Size
(mm)
Size
(h x l x w)
Weight
(Kg)
VS(A)40UH VS(A)45UH VS(A)50UH
40.0 36.0 5.68 18.4 1.5 260x5709x670 91
44.0 39.6 6.25 14.9 1.7 260x7471x670 120
48.0 43.2 6.82 14.3 1.8 260x7471x670 120
5
Page 6
Heater Model
VS(A)15LI6 VS(A)15LI8
VS(A)20LI7 VS(A)20LI10-5 VS(A)25LI8 VS(A)25LI10-5 VS(A)30LI10-5 VS(A)30LI12-5 VS(A)35LI10-5 VS(A)35LI13-5 VS(A)40LI13-5 VS(A)40LI16 VS(A)45LI13-5
Heat Input kW
15.2 13.7 2.16 23.7 1.2 390x5879x315 43 0.5 2501
15.2 13.7 2.16 23.7 1.2 390x7917x315 53 0.5 2501
19.2 17.3 2.73 26.1 1.0 390x6907x315 49 0.5 2501
19.2 17.3 2.73 26.1 1.0 390x10537x315 72 0.5 2501
23.5 21.2 3.34 10.8 1.3 390x7917x315 53 1.0 2507
23.5 21.2 3.34 10.8 1.3 390x10537x315 72 1.0 2507
28.0 25.2 3.98 16.2 1.3 390x10537x315 72 1.0 2507
28.0 25.2 3.98 16.2 1.3 390x12567x315 84 1.0 2507
36.0 32.4 5.12 22.4 1.4 390x10787x470 103 1.0 2507
36.0 32.4 5.12 22.4 1.4 390x13387x470 126 1.0 2507
40.0 36.0 5.68 18.4 1.5 390x13387x470 126 1.0 2507
40.0 36.0 5.68 18.4 1.5 390x16006x470 147 1.0 2507
44.0 39.6 6.25 14.9 1.7 390x13387x470 126 0.5 2560
Gas
Flowrate
(l/hr)
Injector
Pressure
(mbar)
Injector
Size
(mm)
Size
(h x l x w)
Weight
(Kg)
Fan
Rating
(A) Gross Nett
Fan
Type
VS(A)45LI16 VS(A)50LI13-5 VS(A)50LI16
Heater Model
VS(A)15LH6 VS(A)15LH8 VS(A)20LH7 VS(A)20LH10-5 VS(A)25LH8 VS(A)25LH10-5 VS(A)30LH10-5 VS(A)30LH12-5 VS(A)35LH10-5 VS(A)35LH13-5
44.0 39.6 6.25 14.9 1.7 390x16006x470 147 0.5 2560
48.0 43.2 6.82 14.3 1.8 390x13387x470 126 0.5 2560
48.0 43.2 6.82 14.3 1.8 390x16006x470 147 0.5 2560
Heat Input kW
15.2 13.7 2.16 23.7 1.2 390x5879x315 42
15.2 13.7 2.16 23.7 1.2 390x7917x315 52
19.2 17.3 2.73 26.1 1.0 390x6907x315 48
19.2 17.3 2.73 26.1 1.0 390x10537x315 71
23.5 21.2 3.34 10.8 1.3 390x7917x315 52
23.5 21.2 3.34 10.8 1.3 390x10537x315 71
28.0 25.2 3.98 16.2 1.3 390x10537x315 71
28.0 25.2 3.98 16.2 1.3 390x12567x315 83
36.0 32.4 5.12 22.4 1.4 390x10787x470 101
36.0 32.4 5.12 22.4 1.4 390x13387x470 124
Flowrate
(l/hr)
Injector
Pressure
(mbar)
Injector
Size
(mm)
Size
(h x l x w) Gross Nett
Weight
(Kg)
VS(A)40LH13-5 VS(A)40LH16 VS(A)45LH13-5 VS(A)45LH16 VS(A)50LH13-5 VS(A)50LH16
40.0 36.0 5.68 18.4 1.5 390x13387x470 124
40.0 36.0 5.68 18.4 1.5 390x16006x470 145
44.0 39.6 6.25 14.9 1.7 390x13387x470 124
44.0 39.6 6.25 14.9 1.7 390x16006x470 145
48.0 43.2 6.82 14.3 1.8 390x13387x470 124
48.0 43.2 6.82 14.3 1.8 390x16006x470 145
6
Page 7
Table 3. Flue details - Natural Gas
Heater Model
VS(A)15UT4 VS(A)15UT VS(A)20UT VS(A)25UT VS(A)30UT VS(A)35UT VS(A)40UT VS(A)45UT VS(A)50UT VS(A)15LI6 VS(A)20LI7 VS(A)25LI8 VS(A)30LI10-5 VS(A)35LI10-5 VS(A)40LI13-5 VS(A)45LI13-5 VS(A)50LI13-5 VS(A)15LI8 VS(A)20LI10-5 VS(A)25LI10-5 VS(A)30LI12-5 VS(A)35LI13-5 VS(A)40LI16 VS(A)45LI16 VS(A)50LI16 VS(A)15LF6 VS(A)20LF7 VS(A)25LF8 VS(A)30LF10-5 VS(A)35LF10-5 VS(A)40LF13-5 VS(A)45LF13-5 VS(A)50LF13-5 VS(A)15LF8 VS(A)20LF10-5 VS(A)25LF10-5 VS(A)30LF12-5 VS(A)35LF13-5 VS(A)40LF16 VS(A)45LF16 VS(A)50LF16
Mass Flow Rate of Flue
Gasses (kg/s)
0.0110
0.0115
0.0117
0.0139
0.0171
0.0193
0.0210
0.0212
0.0261
0.0098
0.0119
0.0131
0.0171
0.0207
0.0216
0.0249
0.0256
0.0100
0.0120
0.0145
0.0174
0.0194
0.0214
0.0237
0.0237
0.0075
0.0106
0.0127
0.0130
0.0157
0.0168
0.0189
0.0206
0.0077
0.0105
0.0126
0.0136
0.0161
0.0167
0.0190
0.0207
Flue Pressure (Pa)
Maximum Flue
Resistance
15 - 31
19 - 30 210 - 270
25 -35 160 - 210
18 - 25 250 - 290
20 - 30 180 - 240
Flue Gas Temp (°C)
200 - 250
7
Page 8
Table 4. Flue details - Propane
Heater Model
VS(A)15UT VS(A)20UT VS(A)25UT VS(A)30UT VS(A)35UT VS(A)40UT VS(A)45UT VS(A)50UT VS(A)15LI6 VS(A)20LI7 VS(A)25LI8 VS(A)30LI10-5 VS(A)35LI10-5 VS(A)40LI13-5
Mass Flow Rate of Flue
Gasses (kg/s)
0.0119
0.0132
0.0147
0.0154
0.0264
0.0281
0.0300
0.0300
0.0105
0.0135
0.0126
0.0180
0.0210
0.0220
Flue Pressure (Pa)
Maximum Flue
Resistance
15 - 31 190 - 240
19 - 30 190 - 240
Flue Gas Temp (°C)
VS(A)45LI13-5 VS(A)50LI13-5 VS(A)15LI8 VS(A)20LI10-5 VS(A)25LI10-5 VS(A)30LI12-5 VS(A)35LI13-5 VS(A)40LI16 VS(A)45LI16 VS(A)50LI16
0.0280
0.0263
0.0109
0.0149
0.0137
0.0185 25 - 35 160 - 200
0.0210
0.0224
0.0268
0.0262
8
Page 9
Table 5. Herringbone Vacuum Fan characteristics
Fan type
Power (W) 550 120
Running current (overload setting) (A) 2.6 0.8
Phase Single Single
Voltage (V) 230 230
Type ‘O’ Type ‘2’
Table 6. Herringbone & DL Settings- Natural Gas (G20)
Model
VS(A)15UH4 VS(A)15UH VS(A)20UH VS(A)25UH VS(A)30UH VS(A)35UH
Cold HB Pressure Hot HB Pressure
O mbar mm H2O mbar
mm H
2
21.4 2.1 12.7 1.2
21.4 2.1 16.3 1.6
19.4 1.9 15.3 1.5
24.5 2.4 20.4 2.0
23.5 2.3 19.4 1.9
25.5 2.5 15.3 1.5
VS(A)40UH VS(A)45UH VS(A)50UH
VS(A)15LH6/DL12
VS(A)15LH8/DL16 VS(A)20LH7/DL14 VS(A)20LH10-5/DL21 VS(A)25LH8/DL16 VS(A)25LH10-5/DL21 VS(A)30LH10-5/DL21 VS(A)30LH12-5/DL25 VS(A)35LH10-5/DL21 VS(A)35LH13-5/DL27 VS(A)40LH13-5/DL27 VS(A)40LH16/DL32
29.6 2.9 17.3 1.7
33.0 3.2 23.5 2.3
33.0 3.2 23.5 2.3
18.4 1.8 13.3 1.3
18.4 1.8 14.3 1.4
19.4 1.9 14.3 1.4
18.4 1.8 14.3 1.4
20.4 2.0 16.3 1.6
22.4 2.2 18.4 1.8
24.5 2.4 19.4 1.9
33.6 3.3 25.5 2.5
27.5 2.7 13.3 1.3
20.9 2.0 12.7 1.2
22.4 2.2 12.2 1.2
21.4 2.1 14.3 1.4
VS(A)45LH13-5/DL27 VS(A)45LH16/DL32 VS(A)50LH13-5/DL27 VS(A)50LH16/DL32
27.5 2.7 16.8 1.6
26.5 2.6 17.3 1.7
30.0 2.9 18.3 1.8
27.5 2.7 17.8 1.7
9
Page 10
Table 7. Herringbone & DL Settings- Propane Gas (G31)
Model
VS(A)15UH VS(A)20UH VS(A)25UH VS(A)30UH VS(A)35UH VS(A)40UH VS(A)45UH VS(A)50UH
VS(A)15LH6/DL12 VS(A)15LH8/DL16
VS(A)20LH7/DL14 VS(A)20LH10-5/DL21 VS(A)25LH8/DL16 VS(A)25LH10-5/DL21
Cold HB Pressure Hot HB Pressure
O mbar mm H2O mbar
mm H
2
21.4 2.1 16.3 1.6
21.4 2.1 16.3 1.6
24.5 2.4 21.4 2.1
26.5 2.6 17.3 1.7
35.7 3.5 21.4 2.1
38.7 3.8 23.5 2.3
37.7 3.7 23.5 2.3
38.7 3.8 24.5 2.4
21.4 2.1 14.3 1.4
19.4 1.9 15.3 1.5
22.4 2.2 15.3 1.5
21.4 2.1 16.3 1.6
22.4 2.2 17.3 1.7
20.4 2.0 16.3 1.6
VS(A)30LH10-5/DL21 VS(A)30LH12-5/DL25 VS(A)35LH10-5/DL21 VS(A)35LH13-5/DL27 VS(A)40LH13-5/DL27 VS(A)40LH16/DL32 VS(A)45LH13-5/DL27 VS(A)45LH16/DL32 VS(A)50LH13-5/DL27 VS(A)50LH16/DL32
28.6 2.8 19.4 1.9
28.6 2.8 20.9 2.0
24.5 2.4 18.4 1.8
21.4 2.1 17.3 1.7
22.4 2.2 18.4 1.8
30.6 3.0 20.9 2.0
34.7 3.4 24.5 2.4
34.7 3.4 23.5 2.3
33.6 3.3 21.4 2.1
30.6 3.0 20.4 2.0
10
Page 11
2. Commissioning Instructions.
These appliances should be commissioned by a qualified engineer.
2.1 Tools Required.
The following tools and equipment are advisable to complete the tasks laid out in this manual.
Leather Faced Gloves
Pozidrive Screwdriver
Suitable alternative tools may be used.
Small Flat Head Screwdriver
Large Adjustable Spanners or 22, 26 & 27mm Spanners for fitting Of Gas Flex.
12mm Spanner
4mm Allen Key
Manometer
2.2 Balancing The Herringbone System
Important When all the heaters have been installed the vacuum settings must be
finally balanced in the hot condition.
Before attempting to start up the heating system it is essential to perform the preliminary balancing of the vacuum level at each burner unit. Isolate each heater unit by unplugging the electrical connector and closing the gas isolating valve.
Start all burners up and allow them to run for at least 20 minutes. Adjust the damper at exit of each heater using a 4mm Allen key in the damper blade securing screw. Observing the vacuum reading using a ‘U’ tube manometer con­nected to the vacuum test point (see figure
29) each damper should be readjusted and set at a hot condition reading as shown in table 9 (NG) and table 10 (LPG) for the ap­propriate size of heater and model.
Wrench with Extension
Ref Description
A
Radiant Emitter Tube
B
Manifold Tube
C
Vacuum Test Point
D
Damper Blade
Figure 1. HB Damper Assembly
B
D
13mm Socket
C
A
2.3 Balancing a DL System
Important When all the heaters have been installed the vacuum settings must be finally balanced in the hot condition.
As with a Herringbone system above, start both burners up and allow them to run for at least 20 minutes. Adjust the damper on the condensate box using a 4mm Allen key in the damper blade securing screw. Observing the vacuum reading using a manometer connected to the vacuum test point (see figure 30) each damper should be readjusted and set at a hot condition reading
as shown in table 9 (NG) and table 10 (LPG) for the appropriate size of heater and model.
Figure 2. DL Condensate Box Assembly
Damper blade
Vacuum test point
11
Page 12
2.4 Commissioning chart for VS series unitary heaters
Check installation has
been carried out to these
instructions.
Remove burner from tube and inspect burner head.
Replace burner on tube
and secure.
Check thermostat is set to
maximum and is calling
for heat.
Ensure gas and electricity
supplies are isolated.
(See servicing instructions)
Reconnect gas hose.
Open isolating valve.
Check soundness.
Switch on electrical supply.
The red neon should now
be illuminated. If restarting
heater a delay of 15s
should be allowed.
Disconnect gas hose from
burner
Open control housing and check that all components
are securely fastened.
The heater should now
run through its start up
sequence and ignite.
Check gas pressure.
Gas Valve adjustment
A successful ignition is indicated
by the amber light illuminating
and remaining illuminated.
Gas inlet test point
Turn off power and check
that all components are
securely fastened.
NO
Has the
burner lit?
YES
Check operation on flame failure.
Check gas pressure.
Check operation of
air pressure switch.
Injector pressure test point.
Adjustment screw under cap to set injector pressure
Close control housing
12
Leave the instructions
with a responsible
person.
Page 13
3. Servicing Instructions.
These appliances should be serviced annually by a competent person to ensure safe and efficient operation. In exceptional dusty or polluted conditions more frequent servicing may be required. The manufacturer offers a maintenance service. Details available on request
3.1 Tools Required.
Suitable alternative tools may be used.
The following tools and equipment are advisable to complete the tasks laid out in this manual.
Leather Faced Gloves
12mm Spanner
Pozidrive Screwdriver
4mm Allen Key
Small Flat Head Screwdriver
Manometer
Wrench with 13mm Socket
Large Adjustable Spanners or 22, 26 & 27mm Spanners for Fitting of Gas Flex.
3.2 Burner Description.
Figure 3. Induced Burner: Models VS(A)LI, VS(A)LH, VS(A)UH and VS(A)DL
Soft Brush
A Ducted Air Inlet B Induced Air Inlet
Please refer to spares for burner components C Ignitor Assembly D Extruded Burner Head E Multi Hole Injector F Ignition Controller
G Gas Valve H Pressure Switch
I Neon's (Red/Amber) J Pepperpot Head
13
Page 14
Figure 4. Forced Gas Burner: Model VSLF
A 2501 or 2507 Fan B Fan Inlet Spigot
C Fan Orifice plate D Fan Mount Plate and Support
E Gasket Set
3.3 Burner Removal (All Options)
Step 1 Isolate mains electric and gas supplies. Unplug the fan and mains
electricity connectors.
Please refer to spares for burner components
F Ignitor Assembly G Gas Valve H Multi Hole Injector
I Neon's (Red/Amber)
J Ignition Controller
K Extruded Burner Head
L Pepperpot Head M Pressure Switch N Jet Carrier
Step 2 Detach the gas supply as shown below, taking care to support the burner connection.
14
Page 15
Step 3 On forced burners with ducted air at­tachment slacken jubilee clip and remove the flexible hose from the fan.
Step 4 Slacken the grub screw on the burner support casting using a 4mm Allen key to enable the burner to be removed from the radiant tube.
the ignition lead assembly and removing the pressure switch silicon tube.
Step 3 The gas injector can be inspected and replaced if contaminated or blocked.
Step 5 Carefully remove the burner to prevent it or any components from falling to the ground and position the assembly in a safe area.
3.4 Burner Gas Injector Servicing
Step 1 Remove the burner support casting and gasket.
Step 2 The burner head assembly can be disconnected by separating the connectors of
When replacing the gas injector use a 12mm spanner and ensure approved
thread sealant is used. Step 4 Refit the burner support casting and
replace the gaskets to ensure effective sealing.
3.5 Burner Head and Electrode Servicing
Step 1 Check the pepper pot burner head for contamination. If necessary the head can be removed for cleaning of the inside of the burner head, see below.
15
Page 16
Step 2 The pepper pot burner head can be replaced ensuring the 5 holes on the outer ring are aligned alongside the probes.
Step 3 The condition of the ignitor assembly can be checked for deterioration. However, we advise replacement at each service to ensure continued reliability.
Step 4 Detach the electrode assembly from the burner head by removing the two screws and separating the ignitor lead connectors.
Step 5 Refit the electrode assembly and ensure the silicon sleeving is fitted as shown above to prevent arcing of the spark electrode.
Step 6 Check the positions and spark gap as shown below.
Step 7 The burner assembly is ready to refit after servicing the combustion fan and the radiant tube assembly.
3.6 Combustion Fan Assembly Induced Burner (Model VSLI/VSALI)
Step 1 Loosen the clamp fitting on the flue
Step 2 Loosen the 4mm grub screw.
Step 3 The combustion fan can now be detached.
16
Figure 5. Burner head detail
Page 17
Step 4 Remove the fan orifice plate spinning.
Step 5 Inspect the impeller and remove any dust with a soft brush.
Step 2 Remove fan spigot fixings.
Step 3 The combustion fan can now be detached.
Step 6 Remove any dust from fan scroll and from around the motor.
Step 7 Ensure the impeller rotates freely. Step 8 Refit components.
3.7 Combustion Fan Assembly Forced Burner (Model VSLF only)
Step 1 On Forced burners with ducted air attachment slacken jubilee clip and remove the flexible hose from the fan.
Step 4 Remove the fan orifice plate spinning. Step 5 Inspect the impeller and remove any dust
with a soft brush. Step 6 Remove any dust from fan scroll and
from around the motor.
Step 7 Ensure the impeller rotates freely. Step 8 Refit components.
17
Page 18
3.8 Radiant Tube Servicing
Step 1 Brush any dust from the exterior of the tubes.
Step 2 Inspect the fan and burner tubes visually. If the tubes appear clean, skip to servicing the reflector.
Step 3 Remove the U bend (or damper - HB products or condensate box - DL products)
Step 4 Withdraw the turbulators from the appliance. Carefully noting their condition and position. Replace turbulators if necessary.
Step 6 If required the interior of the tubes can then be cleaned using an industrial vacuum cleaner or by using long poles and a scraper.
Step 7 Refit components.
3.9 Reflector Servicing
The condition of the reflectors should be noted. If necessary the reflectors can be cleaned with a mild detergent.
This can significantly improve the efficiency of the appliance.
3.10 Inspection of Flue
The flue needs to be inspected and cleaned if necessary or in accordance to the regulations of the country that the appliance is installed.
3.11 Re-commissioning After Service
After servicing of the heater has been undertaken, it will be necessary to re-commission the heater as detailed in Section 3 of these instructions.
Step 5 The turbulators should be cleaned with a soft brush.
18
Page 19
4. Spare Parts.
Required Spares
In order to aid troubleshooting and servicing we recommend that the components shown in this section should be stocked.
Item
Ignition Controller
Nat Gas Valve Twin sol reg 220/240
Propane Valve Twin sol reg 220/240
Part No. Description
2015S
201587
201706
200988 Pepperpot Head
Note Any spare part components that are
not approved by AmbiRad could invalidate the approval of the appliance and validity of the warranty.
Item
Pressure Switch: VSLF All others
Amber Neon (Burner On)
Red Neon (Mains On)
Combustion Fan
Part No. Description
M101355 201013
2175
2180
See Section 1.11
Extruded Burner Head
Injector
Jet Carrier (all except *)
Flame Plate (VS15 ONLY Nat Gas & Propane)
201284 Ignitor Assembly
200358
See section 1.11
200420
201358
Cables: Spark Electrode
(black)
Rectification lead
(purple)
Earth lead
(green/yellow)
Jet Carrier * VS50 UT/UH/LI/LH/DL
Flame Plate (VS35/45 Propane ONLY)
201488 Gasket Set
900225-2 900225-3 900225-1
201630
201571
Flame Plate (VS20/25/30 Propane ONLY)
201854
19
Flame Plate (VS50 Propane ONLY)
201905
Page 20
5. Fault Finding Guide.
Ensure gas & electricity
supplies are enabled.
YES
Does the RED
neon
illuminate?
YES
Does the
combustion fan
run?
YES
NO
NO
YES
Is there power on the burner?
NO
Check:
1. Wiring harness & plugs
2. Vacuum switch operation
3. Replace fan
NO
Check:
1. Burner controller
2. Red neon faulty
Check:
1. Operation of any thermostat
2. Any external fuses
3. Correct voltage is selected
Check:
1. Vacuum switch tubes
2. Emitter tubes, air inlet & flue for obstructions
3. Operation of vacuum switch
4. Replace combustion fan
Does the
amber light
illuminate after
10s purge?
YES
Does the
amber light
illuminate for 10s
then go out?
NO
If the heater still fails to
operate normally,
please contact
the AmbiRad
service department.
NO
YES
Does the
vacuum switch
`pull in`?
Is the burner
sparking?
YES
Does the gas
valve open?
YES
YES
NO
NO
Check:
1. Burner controller
2. Wiring harness
3. Amber neon faulty
Check:
1. Integrity of spark leads
2. Integrity of electrode assembly & spark gap
3. Burner controller
Check:
1. Burner controller
2. Replace gas valve
Check:
1. Burner inlet pressure
2. Burner nozzle pressure
3. Check live & neutral polarity
4. Check presence of good earth
20
Page 21
6. Replacing Parts.
6.1 Burner Controller Replacement
Step 1 Slacken screw in burner lid and open the right hand burner access door.
Step 2 Disconnect burner controller from the wiring harness.
Step 3 Disconnect the HT Lead from burner controller.
6.2 Air Pressure Switch Replacement
Step 1 Disconnect the two silicone impulse tubes.
Step 2 Remove the two screws as shown below.
Step 4 Remove the two screws attaching the controller to the burner and remove.
Step 5 Fit new burner controller. Step 6 Refit HT leads and refit burner controller
to wiring harness. Step 7 Test product and close access door.
Step 3 The air pressure switch can now be removed.
Step 4 Fit the new air pressure switch ensuring the impulse tubes are connected as shown below.
Step 5 Test product and close access doors.
21
Page 22
7.3 Gas Valve Replacement
Step 1 Remove the burner assembly as described in section 4.3 Servicing.
Step 2 Open the right hand access door and detach the burner controller from the wiring harness.
Step 3 Open the left hand access door and detach the impulse hoses from the air pressure switch.
Step 6 Detach the two screws holding the front of the gas valve.
Step 7 Remove the four screws holding the rear burner plate in position.
Step 4 Remove the 4 screws holding the burner head onto the burner assembly.
Step 5 The burner head can now be detached by disconnecting the impulse tube and the burner head wiring.
Step 8 Remove the rear plate.
Step 9 The jet carrier, gas inlet, and wiring harness can now be detached from the gas valve.
Step 10 The two screws retaining the gas valve can then be removed.
Step 11 The gas valve can now be replaced. Step 12 Refit all components in reverse order.
22
Page 23
Step 13 Ensure step screw is in the correct position as indicated in the diagram below. (For Natural Gas burners ONLY).
Step Screw Adjustment
Step 14 Set gas pressures to data badge or as per section 1.3 and ensure reliable burner performance.
Step 15 Test product and close access doors.
23
Page 24
7. User & Operating Instructions.
7.1 To Start the Heater
1. Ensure gas supply is turned on.
2. Electrical supply to the controls is on.
3. Ensure that the controls are correctly set i.e.;
• Clock is correctly set.
• Heater program is correctly set.
• Required room temp is correctly set
4. Once the heating controller ‘calls for heat’ power will be supplied to the heater(s). The red neon will then illuminate.
5. After a pre-purge period of 10 seconds the burner will ignite and the amber neon will then illuminate.
6. If lockout occurs press the lockout reset button (if available), or switch off electrical supply and restart after 15 seconds.
7. If lockout occurs three times consecutively switch off and isolate the gas and electricity supplies.
Contact the AmbiRad Service department.
7.2. To Switch Off Heater
1. Switch off electrical supply to the heater. The burner will stop and the fan will shut off.
2. If the heater is to be switched off for periods in excess of one week it is highly recommended that both the gas and the electrical supplies are turned off.
7.3. Routine Maintenance between Service Intervals
After ensuring that the heater is cold and mains electric isolated, cleaning of the reflectors with a soft cloth and a mild detergent (non solvent based cleaners only) in water can be undertaken.
Additional removal of dust from the radiant tubes, burner and heat exchanger can be undertaken.
7.4 Frequency of Servicing
The manufacturer recommends that to ensure continued efficient and safe operation of the appliance, the heater is serviced annually by a competent person e.g. every year in normal working conditions but in exceptional dusty or polluted conditions more frequent servicing may be required.
The manufacturer offers a maintenance service.
Details are available on request. For Service requirements, please contact
AmbiRad. For further technical and service support
visit our Support Information Database at www.s-i-d.co.uk
AmbiRad Limited Fens Pool Avenue Brierley Hill West Midlands DY5 1QA United Kingdom.
Telephone 01384 489700 Facsimile 01384 489707 Email [email protected] Website www.ambirad.co.uk Technical Suport www.s-i-d.co.uk
AmbiRad is a registered trademark of AmbiRad Limite d. Because of continuous product innovation, AmbiRad reserve the right to change product specification without due notice
24
Document reference number GB/VS/118S/1208
Loading...