IT IS MANDATORY TO HAVE A WALL STUD ON EACH SIDE OF THE
SHOWER UNIT TO SECURELY FASTEN THE RAIL TO THE WALLS.
KW002
INSTRUCTION MANUAL
GENERAL INSTRUCTIONS
Read this manual carefully and completely before proceeding.
It is recommended that you wear safety glasses at all times during the installation.
INSTALLATION OVER CERAMIC TILES
If your shower door is to be installed over ceramic tiles, the tiles should lay completely under the wall jamb.
Silicone should be used to seal the gap where the ceramic tiles meet the
NOTICE
Caulking: no sealant is required inside the shower.
Some models are equipped with clear sealing gaskets.
CARE FOR YOUR SHOWER DOOR
Never use scouring powder pads or sharp instruments on metal pieces or glass panels. An occasional wiping down with a mild
soap diluted in water is all that is needed to keep the panels and aluminum parts looking new.
We recommend wiping the glass panels with a squeegee after each use.
panel.
PRODUCT SPECIFICATIONS ARE SUBJECT TO CHANGE WITHOUT NOTICE.
2
TOOLS AND MATERIAL REQUIRED
INSTRUCTION MANUAL
LONG NOSE LOCKING PLIER
L BITS
SILICONE
DRILLSCREWDRIVERS
PENCIL
CUTTING PLIER
MALLET
TO INSTALL THE SHOWER DOOR ON CERAMIC TILES, USE A 1/4’’ DRILL BIT FOR CERAMIC TILES.
RUBAN DOUBLE FACE VHB
LEVEL
TAPE MEASURE
5/16” HEX NUT DRIVER
3
PARTS LISTING
INSTRUCTION MANUAL
19
9
18
HARDWARE
13
16
5
1
14
20
23
6
11
24
3
4
8
22
21
25
7
2
14
13
19
16
12
ITEM PARTSQTY
1
2FIXED PANEL1
3UNIVERSAL EXPANDER
4
5MIDGASKET1
6DOOR PANEL1
7BOTTOM DOOR GASKET 1
8DOOR SIDE GASKET 1
9RUNNING RAIL1
10DOOR FRONT THRESHOLD1
11STRAIGHT HANDLE BAR1
12U CHANNEL1
13ROLLERS2
14ANTI-JUMP2
15DOOR RECEIVER1
16DOOR STOPPER1
17
18WALL MOUNT BRACKET2
19GLASS FASTENERS2
ITEM HARDWAREQTY
20WALL PLUG4
21SCREW CAP3
22BACK SCREW CAP3
23PAN SELF DRILLING SCREW # 8 - 3/8"3
24PAN SELF-DRILLING SCREW # 8 - 1-1/4"4
25
WALL JAMB (REGULAR PUNCH)1
FIXED PANEL GASKET
15
BOTTOM GUIDE1
2mmKEY1
10
17
17
4
15
1
1
INSTRUCTION MANUAL
POSSIBLE CONFIGURATIONS
Recommended door panel according to showerhead location. Choose right or left door opening, according with recomandations.
Trace a centerline on the threshold of the base. Determine on which side the wall jamb will be mounted.
BASE SOLD
SEPARETLY.
Right
INTERIOR
SHOWER SIDE
Left
5
VvVV
1
DOOR PANEL ASSEMBLY
Use a mallet to install the bottom gasket (7)
1a
on the bottom of the door panel (6). To
facilitate installation place the door panel on
the cardboard packaging box and use it as
platform. Notice that the holes are situated at
the top of the door panel.
Measure and cut 3/8” off the edge of the
1b
gasket. Cut on the opposing side of the door
handle holes.
Install both rollers (13) through the top holes
1c
of the door panel. Be sure that the adjustment
wheels are turned on the position of the
minimum thickness that is orientated towards
the bottom.
Install the door handle (11). Holes for the
1d
screws are located on the back of the handle
that must be located on the interior of the
shower area.
1b
3/8’’
1a
INSTRUCTION MANUAL
6
DOOR HANDLE HOLES
7
1c
INTERIOR
SHOWER SIDE
!
!
MINIMUM THICKNESS
ORIENTED TOWARDS
THE BOTTOM
13
1d
INTERIOR
SHOWER SIDE
11
INTERIOR
SHOWER SIDE
6
DOOR PANEL ASSEMBLY (CONTINUED) 1
Place door panel (6) inside the shower area to
1e
simplify following installation procedures. Place
the panel on a cushioned surface, such as a
towel or carboard, to prevent damage either to
the panel or to the base.
1e
INSTRUCTION MANUAL
6
!
!
CARBOARD OR TOWEL
TO PROTECT
2
RUNNING RAIL
Unfasten the set screws (x4) from each of the
2a
wall brackets (18). Remove the back plates
from the wall brackets and set them aside.
Slide the wall brackets away from the ends of
2b
the running rail (9) as illustrated.
2a
2b
18
9
7
3
FIXED PANEL ASSEMBLY
Assemble the panel
3a
with the running rail. Align
running rail holes with the
holes of the panel.
Install glass fasteners(19) to
join the panel(2) and
the running rail (9). Be sure
to place gaskets between all
contact with glass and metal
parts. Fasten with
hex 3mm key.
Place U-channel (12)
3b
temporarily on the bottom of
the panel (2). Slide the
panel pre-assembled
with expander (3) and gasket
(4) into the wall jamb (1).
Level the glass panel
assembly with the wall jamb.
3a
19
19
INSTRUCTION MANUAL
SIDE VIEW
9
2
19
INTERIOR
SHOWER SIDE
3b
1
INTERIOR
SHOWER SIDE
2
INTERIOR
SHOWER SIDE
9
SIDE VIEW
9
19
2
12
8
3
FIXED PANEL ASSEMBLY (CONTINUED)
Reassemble temporarily
3c
the angled wall back plate
to the wall bracket on the
running rail. Temporarily
place bottom guide (17)
on the bottom of the
panel (2).
Place temporarily the
3d
panel assembly on the
threshold of the base on the
line that was marked previously. Push wall brackets
against wall (x2) and level.
3c
INSTRUCTION MANUAL
3d
Trace the outer edges of the
3e
wall brackets (x2).
TOP VIEW
17
2
3e
INTERIOR
SHOWER SIDE
9
INSTRUCTION MANUAL
4
WALL JAMB INSTALATION
Push the wall jamb against the wall. Lock into position by clamping the wall jamb and expander with pliers. Trace the position of the
4a
wall jamb on the wall as illustrated. Trace the position of the U channel (12) and of the bottom guide (17) on the threshold of the base.
Mark the location of the bottom guide’s hole.
4b
Remove the panel assembly with the running rail along with the wall jamb , wall brackets the U-channel and the bottom guide. Put
aside. Remove the gasket from the bottom guide.
4a
TOP VIEW
SHOWER SIDE
INTERIOR
COVER THE
PLIER’S TEETH
BEFOREHAND
TO AVOID
SCRATCHING
THE ALUMINUM
PARTS.
4b
THE BACK OF BOTTOM GUIDE (17) MUST BE
PLACED AT THE SAME LEVEL WITH INNER
THRESHOLD OF SHOWER BASE.
10
INTERIOR
SHOWER SIDE
WALL JAMB INSTALATION (CONTINUED)
4
INSTRUCTION MANUAL
Replace the wall jamb against wall using
4c
centerline previously marked as a guide.
Be sure to center the slotted holes with the
centerline. Level and mark locations of the
four holes to be drilled. Remove the wall jamb.
Drill a hole in each location with a 1/4” drill bit.
4d
Insert one drop of silicone in each hole in the
4e
wall before inserting the supplied wall plugs(x4).
4c
1
4d
4e
20
CERAMIC TILE
INSTALLATION
USE A DRILL BIT FOR
CERAMIC TILES.
11
WALL JAMB INSTALATION (CONTINUED)
4
Add silicone to the exterior bottom edge of
4f
the wall jamb.
Fasten the wall jamb to the wall with 1-1/4”
4g
screws (24) through the previously installed
wall plugs. (x4)
Add silicone to interior bottom edge of
4h
wall jamb
4f
4h
INTERIOR
SHOWER SIDE
INSTRUCTION MANUAL
4g
24
WALL BRACKET BACK PLATE
5
Align the back plates of the wall
5a
brackets to previously traced
mark lines on the wall. Trace
the holes centers to determine
drilling location (x2). Remove the
back plates.
Drill marked holes in walls by
5b
using the 1/4” drill bit.
5a
7a
INTERIOR
SHOWER SIDE
5b
INTERIOR
SHOWER SIDE
12
5
WALL BRACKET BACK PLATE (CONTINUED)
INSTRUCTION MANUAL
Insert one drop of silicone in each hole bored
5c
in the wall before inserting the wall plugs.
Screw in head screws through holes to
5d
secure back plate of bracket to wall (x2)
5c
SAME PROCEDURE FOR OPPOSITE SIDE OF WALL
6U-CHANNEL LOCATION
5d
Apply double sided VHB tape to the bottom
6a
of the U-channel (12).
Place the u-channelagainst the wall
6b
jamb and align it to the line marked
previsouly on base.Then press down to
secure to the base.
CLEAN BOTTOM OF U-CHANNEL AND BASE
BEFORE
APPLYING DOUBLE SIDED VHB TAPE
TO UNDERSIDE OF U-CHANNEL.
6a
6b
12
13
INSTRUCTION MANUAL
7
BOTTOM GUIDE INSTALLATION
Place bottom guide to the edge of the U-Channel .Center the front bottom guide channel to the center of the U-Channel. Once in place
7a
mark hole location and remove bottom guide.
Drill with 1/8” drill bit in marked location, then apply a drop of silicone in hole.
7b
Reposition bottom guide and secure in place. Top with screw cap.
7c
Place the gasket in the bottom guide.
7d
7a
7b
INTERIOR
SHOWER SIDE
7c
INTERIOR
SHOWER SIDE
17
7d
14
INTERIOR
SHOWER SIDE
8
FIXED PANEL INSTALLATION
Install the panel. Insert
8a
the running rail into the wall
bracket back plates that
were installed previously.
Insert the glass panel in the
front bottom guide channel.
Push wall brackets towards
8b
the wall and lock in with
the back plates previously
secured to the wall. Repeat
on opposite side.
Tighten set screws to
8c
secure in place with
provided Allen key. (X8)
INSTRUCTION MANUAL
8a
8b
TOP VIEW
8c
15
9
SECURE THEWALL JAMB AND EXPANDER
Drill through the wall jamb a hole with the 1/8” drill bit, to
9a
perce through the expander. (x3)
Screw 3/4” screws (23) through holes to hold expander
9b
and wall jamb together in place. (x3) Cover all screws with
screw caps (21).
9a
9b
22
INSTRUCTION MANUAL
INTERIOR
SHOWER SIDE
24
21
DOOR PANEL INSTALLATION 10
Install door panel (6) by
10a
aligning the rollers (13) on
running rail (9) and by
aligning the door panel (6)
with the back channel of
bottom guide (17)
Slide door to insure a
10b
smooth stable glide.
21
23
10a10b
13
6
9
16
INTERIOR
17
SHOWER SIDE
DOOR GASKETS INSTALLATION
11
Temporarily install midgasket
11a
(5) and the door gasket (8) to
door panel.
Close door entirely, mark
11b
interference of the gaskets
with the running rail.
Cut gasket at marked
11c
locations using cutters. Note
that midgasket (5) needs only
to be cut below the running
rail. The top part is no longer
required for assembly.
Reinstall gaskets from
11d
bottom working your way up.
Use a mallet to insure that
the gaskets are fully pushed
onto glass panel door.
INSTRUCTION MANUAL
11a
5
5
11b
8
REMOVE GASKET FROM
PANEL BEFORE CUTTING.
INTERIOR
SHOWER SIDE
8
INTERIOR
SHOWER SIDE
5
11c
8
11d
17
6
12 ANTI-JUMP & DOOR STOPPER
INSTRUCTION MANUAL
12a
located below the running rail. Be sure to place
gaskets between contact of glass and aluminium
parts. (x2)
Install door stopper (16) located in the interior shower
12b
next to wall jamb. Use hole provided in running rail.
lenap rood fo seloh rewol ni )41( pmuJ-itnA llatsnI
12a
INTERIOR
SHOWER SIDE
14
GASKETS
12b
INTERIOR
SHOWER SIDE
INTERIOR
SHOWER SIDE
16
INTERIOR
SHOWER SIDE
18
13 DOOR RECEIVER INTALLATION
Place door receiver (15) against the wall, so
13a
receiver. Mark hole location.
Remove door receiver and drill in marked
13b
location with 1/8” drill bit.
Insert one drop of silicone into hole.
13c
Reposition and secure in place with
13d
provided screw then place the screw cap.
eht otni ylhtooms sedils lenap rood eht taht
13a
15
INSTRUCTION MANUAL
13b
THRESHOLD
14
Place threshold (10) between wall and
14a
bottom guide as shown in 14a. Cut off
any excess length.
Apply silicon on the bottom of threshold as
14b
indicated in 14b. Secure threshold in place.
14a
13c
13d
CUT ONLY IF NECESSARY
14b
INTERIOR
SHOWER SIDE
10
19
15 SEALING
Silicone the outside of the shower unit along the wall jamb and the exterior side of aluminum threshold and U-channel.
15a
Wait 24 hours before using the shower to allow silicon to dry.
15b
15a
INSTRUCTION MANUAL
20
15b
HOURS
Loading...
+ hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.