IT IS MANDATORY TO HAVE A WALL STUD ON EACH SIDE OF THE
SHOWER UNIT TO SECURELY FASTEN THE RAIL TO THE WALLS.
KW001
INSTRUCTION MANUAL
GENERAL INSTRUCTIONS
• Read this manual carefully and completely before proceeding.
• It is recommended that you wear safety glasses at all times during the installation.
INSTALLATION OVER CERAMIC TILES
• If your shower door is to be installed over ceramic tiles, the tiles should lay completely under the wall jamb.
• Silicone should be used to seal the gap where the ceramic tiles meet the
NOTICE
• Caulking: no sealant is required inside the shower.
• Some models are equipped with clear sealing gaskets.
CARE FOR YOUR SHOWER DOOR
• Never use scouring powder pads or sharp instruments on metal pieces or glass panels. An occasional wiping down with a mild
soap diluted in water is all that is needed to keep the panels and aluminum parts looking new.
• We recommend wiping the glass panels with a squeegee after each use.
panel.
PRODUCT SPECIFICATIONS ARE SUBJECT TO CHANGE WITHOUT NOTICE.
2
TOOLS AND MATERIAL REQUIRED
INSTRUCTION MANUAL
LONG NOSE LOCKING PLIER
1/4˝ & 1/8˝ DRILL BITS
SILICONE
DRILLSCREWDRIVERS
PENCIL
CUTTING PLIER
MALLET
TO INSTALL THE SHOWER DOOR ON CERAMIC TILES, USE A 1/4’’ DRILL BIT FOR CERAMIC TILES.
RUBAN DOUBLE FACE VHB
LEVEL
5/16” HEX NUT DRIVER
TAPE MEASURE
3
INSTRUCTION MANUAL
13
14
15
PARTS LISTING
5
11
16
HARDWARE
20
12
13
21
1
6
22
2
19
23
9
3
24
7
25
10
4
17
18
26
8
ITEM PARTSQTY
1
2
3EXPANDER GASKET1
4FIXED PANEL U CHANNEL1
5MIDGASKET1
6DOOR GASKET1
7 BOTTOM DOOR GASKET1
8 ALUMINUM THRESHOLD1
9
10FIXED PANEL1
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26HEX KEY 3mm1
WALL JAMB1
EXPANDER1
DOOR PANEL1
ROLLERS2
RUNNING RAIL1
WALL MOUNT BRACKET2
GLASS FASTENER2
STOPPER1
ANTI-JUMP2
BOTTOM GUIDE1
DOOR RECEIVER1
DOOR HANDLE2
WALL PLUG8
EXPANDER SCREW6
WALL JAMB SCREW4
FLAT HEAD SCREW 2
SCREW CAP6
HEX SOCKET SET SCREW8
4
VvVV
1
DOOR PANEL ASSEMBLY
Use a mallet to install bottom gasket (7) on the
1a
bottom of the door panel (9). To facilitate installation
place door panel on cardboard packaging box and use
as platform. Notice the holes are situated at the top of
the panel.
Measure and cut 3/8” off the edge of the gasket.
1b
Cut opposing side of door handle holes.
Install both rollers (11) through the top holes of the door
1c
panel. Be sure that the adjustment wheel is turned to
position the minimum thickness of wheel towards the
bottom.
Install door handle (19). Holes for screws are located
1d
on the back handle and must be located in the interior
of the shower door.
INSTRUCTION MANUAL
1a
9
7
DOOR HANDLE HOLES
3/8’’
1b
1c
INTERIOR
SHOWER SIDE
MINIMUM THICKNESS
ORIENTED TOWARDS
THE BOTTOM
!
!
11
1d
INTERIOR
SHOWER SIDE
19
5
2 WALL JAMB INSTALATION
INSTRUCTION MANUAL
Place door panel (9) inside shower to simplify follow-
2a
ing installation procedures. Place the panel on a cushioned surface, such as a towel or carboard, to prevent
damage either to the panel or the base.
Temporarily place bottom guide (17) on shower base.
2b
The back of the bottom guide must be placed with
the inner threshold edge of the shower base.
While keeping bottom guide in place at the edge of the
2c
threshold, trace a line in the center of the front channel.
Continue to trace the center line at the same distance
2d
along the threshold up the side of the wall. This will
locate the placement of your wall jamb.
2b
2a
9
!
!
CARBOARD OR TOWEL
TO PROTECT
!
!
!
2d
2c
INTERIOR
SHOWER SIDE
=
17
THE BACK OF BOTTOM GUIDE (17) MUST BE FLUSH
WITH INNER THRESHOLD OF SHOWER BASE.
6
2 WALL JAMB INSTALATION
INSTRUCTION MANUAL
Place wall jamb against wall using centerline
2e
previously marked as a guide. Be sure to center
the slotted holes with the centerline.
Level and mark locations of the four holes to be
2f
drilled.
Remove the wall jamb.
2g
Drill a hole in each location with a 1/4” drill bit.
2h
2e
2f
1
CERAMIC TILE INSTALLATION
USE A BIT FOR CERAMIC TILE.
2g
2h
1
7
2 WALL JAMB INSTALATION
Insert one drop of silicone in each hole in the wall
2i
before inserting the supplied wall plugs (4x)
Add silicone to exterior bottom edge of wall jamb.
2j
Fasten the wall jamb to the wall with 1-1/4” screws (22)
2k
through the previously installed wall plugs. (x4)
Add silicone to interior bottom edge of wall jamb
2l
2i
2j
2l
INSTRUCTION MANUAL
2k
INTERIOR
SHOWER SIDE
FIXED PANEL
3
Place U-chanel (4) temporarily on bottom of panel
3a
(10).
Slide the panel (10) pre-assembled with expander
3b
(2) and gasket (3) into the wall jamb (1).
Level the glass panel assembly with the wall jamb.
3c
Lock into position by clamping the wall jamb and
3d
expander with pliers.
3a
10
4
3b
1
2
3
10
3c
3d
COVER THE PLIER’S TEETH BEFOREHAND TO AVOID
SCRATCHING THE ALUMINUM PARTS.
8
RUNNING RAIL
4
Unfasten set screws (x4) from wall bracket (13).
4a
Then remove back plate from the wall bracket and set
aside
With back plates of wall brackets removed, slide the
4b
wall brackets away from the ends of the running rail
(12).
INSTRUCTION MANUAL
4a
4b
12
13
GLASS FASTENERS
5
Align running rail holes with holes in panel.
5a
Install glass fasteners (14) to join panel(10) and rail
5b
(12). Be sure to place gaskets between all contact with
glass and metal parts.
Fasten with hex 3mm key.
5c
5b
5a
14
INTERIOR
SHOWER SIDE
5c
INTERIOR
SHOWER SIDE
12
10
9
5 RUNNING RAIL
Push wall brackets against wall (x2) and level.
5d
Trace outer edge of wall bracket. (x2)
5e
INSTRUCTION MANUAL
5d
5e
INTERIOR
SHOWER SIDE
10
INTERIOR
SHOWER SIDE
6 BOTTOM GUIDE
Trace edge of U-channel (4) to determine location of
6a
bottom guide.
Remove glass fasteners, running rail along with wall
6b
brackets, panel and U-channel (4). Put aside.
Only the wall jamb (1) and previously assembled door
panel should stay in place.
6a
6b
INSTRUCTION MANUAL
1
WALL BRACKET BACK PLATE
7
Align back plate of wall bracket to previously traced mark
7a
on wall. Trace hole centers to determine drilling location.
(x2)
Drill marked holes in walls by using the 1/4” drill bit.
7b
Insert one drop of silicone in each hole bored in the wall
7c
before inserting the wall plugs.
Screw in
7d
plate of bracket to wall (x2)
head screws through holes to secure back
4
7a
7c
INTERIOR
SHOWER SIDE
7b
7d
SAME PROCEDURE FOR OPPOSITE SIDE OF WALL
11
4
8 U-CHANNEL EMPLACMENT
Apply double sided VHB tape to bottom of U-channel
8a
(4).
8b
then press down to secure to base.
INSTRUCTION MANUAL
.esab no senil dekram yluosiverp htiw lennahc-u ngilA
CLEAN BOTTOM OF U-CHANNEL AND BASE
BEFORE
TO UNDERSIDE OF U-CHANNEL.
APPLYING DOUBLE SIDED VHB TAPE
8a
4
8b
12
INSTRUCTION MANUAL
4
9 FIX PANEL INSTALLATION
9a
center the front channel of the bottom guide to the
center of U-Channel.
Once in place mark hole location and remove bottom
9b
guide.
Drill with 1/8” drill bit in marked location, then apply a
9c
drop of silicone in hole.
Reposition bottom guide and secure in place. Top
9d
with screw cap.
Install panel. Be sure to level panel and align edge