2. FASTEN THE HINGES TO THE WALL. .................... 8
3. PREASSEMBLE THE DOOR. ................................ 8
4. INSTALL THE DOOR PANEL. ............................... 9
5. INSTALL THE DOOR HANDLE. ............................ 9
6. MOUNT THE WALL JAMB. ............................... 10
7. INSERT THE MAGNETIC GASKET. .......................11
8. POSITION THE FIXED PANEL. ............................ 11
9. FASTEN THE “U” CHANNEL. ............................ 12
10. INSTALL THE FIXED PANEL. ............................ 12
11. FASTEN THE SUPPORT BAR. ........................... 13
12. INSTALL THE DOOR GASKETS. .........................14
13. SILICONE SEAL THE SHOWER. ......................... 15
● General Instructions
- Read this manual carefully and completely before
proceeding.
- It is recommended that you wear safety glasses at all
times during the installation.
● Installation over Ceramic Tiles
- Silicone should be used to seal the gap where the
ceramic tiles meet the
- If your shower door is to be installed over ceramic tiles,
the tiles should lay completely under the wall jamb.
panel.
● Notice
- Caulking: no sealant is required inside the shower.
- All models are equipped with transparent sealing
gaskets.
● Care for your Frameless Shower Door
- Never use scouring powder pads or sharp instruments on
metal pieces or glass panels.
An occasional wiping down with a mild soap diluted
in water is all that is needed to keep the panels and
aluminum parts looking new.
- We recommend wiping the glass panels with a squeegee
after each use.
without notice.
3
INSTRUCTION MANUAL
PARTS LISTING
10
5
6
9
11
1
2
3a
3b
3c
8
7
ITEMPARTSQTY
12
4
1SUPPORT BAR1
2WALL JAMB (TEMPLATE)1
3aSIDE PANEL1
3bEXPANDER 1
3c GASKET1
4ALUMINUM “U” CHANNEL1
5MAGNETIC DOOR GASKET2
6OVAL WALL-MOUNT HINGE2
7LEVELING BLOCKS2
8BOTTOMDOOR GASKET1
9DOOR PANEL 1
10DOOR SIDE GASKET1
11CURVED HANDLE1
12THRESHOLD1
*next page
4
INSTRUCTION MANUAL
21 3/4"21 1/8"
(15" x 70" )14 1/16"
25 3/4"25 1/8"
(19 5/8" x 70" )18 11/16"
33 3/4"33 1/8"
(23" x 70" )22 1/16"
33 3/4"33 1/8"
(21" x 70" )20 1/16"
36(20 3/16” x 75")(13 5/8" x 70" )12 11/16"21 3/4"21 1/8"
MODEL DOOR PANEL SIDE PANELALUM. “U” CHANNELBOTTOM DOOR GASKETTHRESHOLD
40(23 3/16” x 75")24 3/4"24 1/8"
39(22 3/16” x 75")23 3/4"23 1/8"
38(21 3/16” x 75")22 3/4"22 1/8"
37(20 3/16” x 75")
42(25 3/16” x 75")26 3/4"26 1/8"
41(24 3/16” x 75")25 3/4"25 1/8"
44(27 3/16” x 75")28 3/4"28 1/8"
43(26 3/16” x 75")27 3/4"27 1/8"
45(28 3/16” x 75")29 3/4"29 1/8"
49(27 3/16” x 75")28 3/4"28 1/8"
48(26 3/16” x 75")27 3/4"27 1/8"
47(25 3/16” x 75")26 3/4"26 1/8"
46(24 3/16” x 75")
51(29 3/16” x 75")30 3/4"30 1/8"
50(28 3/16” x 75")29 3/4"29 1/8"
53(31 3/16” x 75")32 3/4"32 1/8"
52(30 3/16” x 75")31 3/4"31 1/8"
54(32 3/16” x 75")33 3/4"33 1/8"
(32 3/16” x 75")
58(24" x 70" )23 1/16"
57
DOOR PANEL SIDE PANELALUM. “U” CHANNELBOTTOM DOOR GASKETTHRESHOLD
(32 3/16” x 75")
55
CUSTOM MODEL
56 (22" x 70" )21 1/16"
5
INSTRUCTION MANUAL
PROVIDED HARDWARE
13141516171819
ITEMHARDWAREQTY
13CLEAR SETTING BLOCK3
14CLEAR SETTING BLOCK2
15WALL PLUG4
16SCREW CAP4
17SELF DRILLING SCREW #8-3/83
18SELF-DRILLING SCREW #8-1 1/43
19FLAT HEAD SCREW #6-3/41
TOOLS AND MATERIALS REQUIRED
DRILL
If the shower panels are to be assembled on ceramic tiles, use a 1/4˝ drill bit for ceramic tiles.
*
*
1/4˝& 1/8˝ DRILL BITS
HAMMERSILICONESCREWDRIVERS
PENCIL
CUTTING PLIERLONG NOSE LOCKING PLIERLEVELTAPE MEASURE
MALLET
6
INSTRUCTION MANUAL
DETERMINE HINGES LOCATION
1
LEFT CONFIGURATION
1A.
Determine on which side the hinges will be mounted. It is
recommended to install the hinges on the same side as the
1A
RIGHT CONFIGURATION
showerhead.
USE THE WALL JAMB (#2) AS TEMPLATE
TO MARK DRILLING LOCATIONS FOR
WALL-MOUNTED HINGES.
WALL-MOUNTED HINGES MUST BE SUPPORTED
AND FASTENED INTO A STUD FRAMING.
1B
1B. Trace a centerline on the threshold and run it up along the wall.
1C.
Place the wall jamb (#2) on the threshold by centering the slotted
holes with the centerline.
1D.
Mark the drilling locations at the top and bottom of the wall jamb.
Drill a hole at each location with a 1/4” drill bit.
1C
INTERIOR
SHOWER SIDE
2
INTERIOR
SHOWER SIDE
RIGHT CONFIGURATION SHOWN
1D
7
INSTRUCTION MANUAL
2
2A.
3
FASTEN THE HINGES TO THE WALL.
NEVER PLACE THE GLASS DIRECTLY
ON THE FLOOR.
Fasten the hinges (#6) to the wall as illustrated.
PREASSEMBLE THE DOOR.
INTERIOR
SHOWER SIDE
2A
3A.
Temporarily insert the bottom door gasket
(#8) under the door panel.
Install the 2 leveling blocks (#7) onto the
3B.
bottom lip of the gasket.
Place the magnetic gasket (#5) on top of
3C.
the bottom door gasket (#8) and insert it on
the door panel using a mallet.
5
8
7
9
FINAL RESULT
8
INTERIOR
SHOWER SIDE
LIP
6
7
INTERIOR
SHOWER SIDE
9
3C
3A
5
3B
7
8
INSTRUCTION MANUAL
4
4A.
4B.
4C.
INSTALL THE DOOR PANEL.
IT IS BEST TO HAVE 2 PEOPLE
WORKING ON THIS STEP.
Place the door assembly on the shower threshold
and level it.
Fasten the hinges as illustrated using the Allen key.
Remove the leveling blocks (#7) and the bottom
door gasket.
4B
9
INTERIOR
SHOWER SIDE
4A
7
INSTALL THE DOOR HANDLE.
5
Install the curved door handle (#11) as illustrated.
5A.
4C
9
11
9
INSTRUCTION MANUAL
6
MOUNT THE WALL JAMB.
2
6A
6B
15
6C
NOTE
CHOOSE 1 OF THE 2 HOLES AT THE TOP
AND BOTTOM OF THE WALL JAMB.
18
6A.
Place the wall jamb (#2) on the center of the
threshold and align it using a level. Trace the outer
edge of the wall jamb and the holes onto the wall.
Remove the wall jamb.
6B. With a 1/4˝ drill bit, drill 3 holes into the wall using
the marks as a guide.
6C.
the drilled hole location, skip this step.
(b) Insert the wall plugs (#15) and put in each a drop
of silicone.
6D. Secure the wall jamb using the 1 1/4˝ screws (#18).
2
6D
6C(a)6C(b)
TOP VIEW
WALL STUD
18
TOP VIEW
2
15
18
10
INSTRUCTION MANUAL
7
7A.
8
INSERT THE MAGNETIC GASKET.
INTERIOR
SHOWER SIDE
5
Align the magnetic gasket to the bottom edge of the
POSITION THE FIXED PANEL.
3
3
COVER THE PLIER’S TEETH BEFOREHAND TO
AVOID SCRATCHING THE ALUMINUM PARTS.
3
5
5
2
8B
4
14
8A.
Align the aluminum “u” channel (#4) on the threshold and
insert a clear setting block (#14).
8B.
aluminum “u” channel. Secure it using a locking plier.
8A
8C
8C.
Adjust and level the glass panels. The magnetic gaskets
must be alligned and in contact.
IF MORE ADJUSTMENTS ARE NEEDED, INSERT OTHER
SETTING BLOCKS (#13&14) IN THE “U” CHANNEL.
11
INSTRUCTION MANUAL
FASTEN THE “U” CHANNEL.
9
9A
5
9B
4
Mark the location of the aluminum “u” channel (#4) on
9A.
Realign the aluminum “u” channel on the threshold and
9B.
drill a hole using a 1/8˝ drill bit at about 2˝ from the edge.
Put a drop of silicone in the hole and fasten the “u” channel with a 3/4˝ long screw (#19). Place the clear setting
block (#14) back over the screw.
10
INSTALL THE FIXED PANEL.
2
19
OPTIONAL
RUN A BEAD OF SILICONE IN THE
ALUMINUM “U” CHANNEL.
14
19
10A
2
10A.
the aluminum “u” channel. Secure it with the locking
plier.
10B.
Combine the 3 3/8˝ screws (#17) with the inner
10C. Snap the screw caps (#16a) on the screws.
3
17
16a
10C
10B
16b
3b
INTERIOR
SHOWER SIDE
12
INSTALLATION GUIDE
ADDENDUM
Loosen the glass clip (#1d). Align the slotte to the
1
fixed panel. The slotted screw head should be on the
inside of the shower.
Rest the support bar on the fixed panel inside the
2
tub. Level it and trace an arc on the wall.
Isolate the wall bracket and drill a hole, using a 1/4˝
3
drill bit through the wall. Locate the position of this
hole by way of the wall bracket. Insert a wall plug.
1
2
3
Secure the wall bracket to the wall by way of the
4
screw. Assemble the cylindrical joint to the wall
bracket.
Secure the glass fastener and wall bracket screws
5
to complete the installation process.
4
5
INSTRUCTION MANUAL
11
11A.
11B.
11C.
11D.
FASTEN THE SUPPORT BAR.
Loosen the set screws in the connector (#1c).
Pivot the connector to orient the glass clip (#1d)
Unscrew the glass clip. Align the slotted hole to the
the inside of the shower.
Tighten all the screws.
1b
1a
11A
1d
1c
11B
11C
11D
11E
11E.
the shower. Level it and trace an arc on the wall.
11F.
Locate the screw position using the cylindrical part.
With a 1/4˝ drill bit, drill a hole in the wall and insert a
wall plug (#15).
11G. Put the bar back in place. Tighten all the screws.
11F
11G
13
INSTRUCTION MANUAL
12
INSTALL THE DOOR GASKETS.
9
12A
INTERIOR
SHOWER SIDE
5
8
12B
45º
12A. Align the bottom door gasket (#8) to the wall and project
on it the 45° magnetic gasket (#5) surface.
12B. Using the cutting plier, trim the bottom door gasket at
12C.
Open the door and clean the door panel surface on
which the door side gasket (#10) will be placed. Align
gasket. Make sure it is oriented as illustrated.
8
10
RIGID PART
± 1/8"
± 5/8"
12C
± 1/2"
SUGGESTED TRIMMING
12D
12D. Stick the door side gasket on the door panel.
10
INTERIOR
SHOWER SIDE
14
INSTRUCTION MANUAL
13
SILICONE SEAL THE SHOWER.
HOURS
13A
13A.
Silicone seal the exterior of the shower along the wall
and the aluminum “u” channel (#4).
13B.
Position the threshold (#12) under the door panel as
illustrated. Lift it to pass a bead of silicone underneath.
Apply silicone on the outside edges.
9
8
12
INTERIOR
SHOWER SIDE
13B
WE RECOMMEND TO HOLD THE THRESHOLD
(#12) IN PLACE WITH TAPE WHILE DRYING.
15
Loading...
+ hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.