Alumax M-94X User Manual

M-94X
INSTRUCTION MANUAL
05.11
M005
Please keep this manual and product code number for future reference
and replacement parts ordering if necessary.
P
PACKAGING CHECK LIST & HARDWARE
11
1
2
3
4
5
6
7
8
1212
PU
10
9
1
SUPPORT BAR (2)
2
WALL JAMB (2)
3
SIDE PANEL (2)
4
DOOR PANEL (1)
5
STRAIGHT HANDLE (1)
6
THRESHOLD (2)
7
HINGE (2)
8
BOTTOM DOOR GASKET (1)
9
THRESHOLD (1)
10
MAGNETIC DOOR GASKET (2)
11
SIDE PANEL GASKET (1)
12
LEVELING BLOCKS (2)
TOOLS AND MATERIALS REQUIRED
DRILL
1/4”
CERAMIC DRILL BIT TILE
SCREWDRIVERS
1/8”
1/4”
ACRYLIC DRILL BIT
HAMMER
SILICONE
MALLET
ALLEN KEY
MEASURE TAPE
½’’
2’’
6’’
WOODEN BLOCK
X 8
ALL PLUG
SCREW 1 1/4" LG
PENCILCUTTING PLIER
a
SCREW CAP
LONG NOSELOCKING PLIER
PACKAGING CHECK LIST & HARDWARE
X 6
b
SCREW 3/8" LG
X 6X 8
SCREW 3/4" LG
LEVEL
X 2 X 2
SCREW 2 1/2” LG
X 2
BOTTOM GLASS CLIP (BTM GL CLIP 1.5)
Step
1
CUT UP THE TEMPLATE
SHOWER DOOR INSTALLATION STEPS
NOTE
USE TEMPLATE TO
LOCATE WALL JAMB
POSITION ON THE BASE
TEMPLATE
Step
2
PLACE THE TEMPLATE ON THE BASE THRESHOLD
SHOWER DOOR INSTALLATION STEPS
WARNING
Wall jamb must be supported and fastened with provided anchors into a stud framing.
ON BOTH SIDE
Step
3
MOUNT THE WALL JAMB (2)
3A
3B
WALL PLUG (6)
4A
Step
4B
4
4C
Step
SHOWER DOOR INSTALLATION STEPS
5
SLIDE THE FIXED PANEL
OVER THE WALL JAMB
ON BOTH SIDES
5A
5B
COVER THE PLIER’S TEETH
BEFOREHAND TO AVOID
SCRATCHING THE ALUMINIUM PARTS.
6A
5C
Step
7
FASTEN (TEMPORARILY)FIXED PANELS (2)
Step
6
FASTEN THE THRESHOLD (2)
SHOWER DOOR INSTALLATION STEPS
IT IS RECOMMENDED TO HAVE TWO PEOPLES FOR THE FOLLOWING INSTALLATION STEP.
Step
8
HINGE (2)
PU
LEVEL GLASS PANELS TO ALIGN HOLES
9B
9A
INTERIOR SHOWER SIDE
REMOVE LEVELING BLOCKS
9C
AFTER HINGES INSTALLATION
Step
BOTTOM DOOR GASKET (1) + LEVELING BLOCKS (2)
9
SHOWER DOOR INSTALLATION STEPS
INTERIOR HANDLE (1)
PU
EXTERIOR HANDLE (1)
10A
10B
Step
HANDLE INSTALLATION
10
10C
INTERIOR SHOWER SIDE
DOOR PANEL
SIDE PANEL
SHOWER DOOR INSTALLATION STEPS
SIDE PANEL “ V “ GASKET
Step
12
MAGNETIC DOOR GASKET (2)
Step
SIDE PANEL GASKET (1)
11
PU
INSTALLATION GUIDE
Loosen the glass clip (#1d). Align the slotte to the
1
fixed panel. The slotted screw head should be on the inside of the shower.
Rest the support bar on the fixed panel inside the
2
tub. Level it and trace an arc on the wall.
ADDENDUM
1
2
Isolate the wall bracket and drill a hole, using a 1/4˝
3
drill bit through the wall. Locate the position of this hole by way of the wall bracket. Insert a wall plug.
Secure the wall bracket to the wall by way of the
4
screw. Assemble the cylindrical joint to the wall bracket.
Secure the glass fastener and wall bracket screws
5
to complete the installation process.
3
4
5
Step
SHOWER DOOR INSTALLATION STEPS
13
LEVEL FIXED PANELS
SUGGESTION
USE A LONG NOSE LOCKING PLIERS
TO TEMPORARILY HOLD
THE FIXED PANEL IN PLACE
Step
SUPPORT BAR (2)
14
(See Addendum)
PU
Step
15
SCREW 3/8” LG + SCREW CAP (6)
B
A
INTERIOR SHOWER SIDE
NON / NO
PRIOR TO FASTENING DOOR ASSEMBLY,
VERIFY MAGNETIC DOOR GASKET ALIGNMENT
AND ALL PANELS SHOULD BE LEVELED.
PAGE 10
SHOWER DOOR INSTALLATION STEPS
Step
16
SILICON SEAL EXTERIOR
24
PU
INTERIOR SHOWER SIDE
Hours
THRESHOLD (1)
To ensure optimal leak protection, it is recommended to install the aluminum threshold by running a bead of silicone under the part and position it between the fixed panels and underneath door panel.
Recommended:
PAGE 11
Loading...