Please keep this manual and product code number for future reference and re-
placement parts ordering if necessary.
2 PEOPLE REQUIRED
GENERAL INSTRUCTIONS
• Read this manual carefully and completely before
proceeding.
• It is recommended that you wear safety glasses at
all times during the installation.
INSTALLATION OVER CERAMIC TILES
• Silicone should be used to seal the gap where the
ceramic tiles meet the panel.
• If your shower door is to be installed over ceramic
tiles, the tiles should lay completely under the
wall
• jamb.
NOTICE
• Caulking: no sealant is required inside the shower.
Unless otherwise stated.
• Some models are equipped with clear sealing
gaskets.
CARE FOR YOUR SHOWER DOOR
• Never use scouring powder pads or sharp instruments on metal pieces or glass panels. An occasional wiping down with a mild soap diluted in water
is all that is needed to keep the panels and aluminum parts looking new.
• We recommend wiping the glass panels with a
squeegee after each use.
Product
are subject to change without
notice.
201X-25, 202X-25
INSTALLATION MANUAL
PARTS LISTING
HARDWARE
11.1
WALL PLUG #6-1
HINGE
11.2
1
11.3
11.4
11.5
SPACING BLOCK
HINGE
ITEM #PARTS QTY
SCREW #8-3/8
SCREW #8-1 1/4
SCREW CAP
1DOOR PANEL1
2.1FIXED PANEL1
2.2EXPANDER1
2.3 GASKET1
3WALL JAMB1
4HINGE2
5BOTTOM GLASS CLIP2
6SUPPORT BAR1
7BOTTOM DOOR GASKET1
8SIDE GASKET1
11HARDWARE
11.1WALL PLUG #6-14
11.2SELF DRIILLING SCREW #8-3/83
11.3SELF DRILLING SCREW #8-1 1/43
11.4SCREW CAP #8/84
11.5SPACING BLOCK2
4
201X-25, 202X-25
INSTALLATION MANUAL
TOOLS AND MATERIAL REQUIRED
LONG NOSE LOCKING PLIER
PENCIL
CUTTING PLIERLEVELTAPE MEASURE
•Support Bar
see page 18-19
DRILLSILICONESCREWDRIVERS
1/4˝& 1/8˝ DRILL BITS
MALLETBLOCK
INSTALLATION OF COMPONENTS
• Hinges
• Door panel
see page 21
• Return panel
• Bottom clips
see page 16-17
• Side gasket
• Door bottom
see page 20
5
311X-25, 312X-25
INSTALLATION MANUAL
PARTS LISTING
6
4
HARDWARE
11.1
11.2
CHEVILLE #6-1
WALL PLUG #6-1
VIS # 8-3/8
SCREW #8-3/8
HINGE
8
9.2
9.3
11.3
VIS # 8-1 1/4
SCREW #8-1 1/4
9.1
11.4
CAPUCHON COUVRE-VIS
SCREW CAP
11.5
HINGE
BLOC ESPACEUR
SPACING BLOCK
5
4
7
ITEM NO.PARTS QTY
1DOOR PANEL1
2.1FIXED PANEL1
2.2EXPANDER1
2.3GASKET1
3WALL JAMB2
4HINGE2
5BOTTOM GLASS CLIP4
6SUPPORT BAR1
7BOTTOM DOOR GASKET1
8SIDE GASKET1
9.1RETURN PANEL1
9.2EXPANDER1
9.3GASKET1
11HARDWARE
11.1WALL PLUG #6-18
11.2SELF DRIILLING SCREW #8-3/86
11.3SELF DRILLING SCREW #8-1 1/46
11.4SCREW CAP #8/88
11.5SPACING BLOCK2
6
311X-25, 312X-25
INSTALLATION MANUAL
TOOLS AND MATERIAL REQUIRED
LONG NOSE LOCKING PLIER
PENCIL
•Support Bar
see page 18-19
CUTTING PLIERLEVELTAPE MEASURE
DRILLSILICONESCREWDRIVERS
1/4˝& 1/8˝ DRILL BITS
MALLETBLOCK
INSTALLATION OF COMPONENTS
• Hinges
• Door panel
see page 21
• Return panel
• Bottom clips
see page 16-17
• Side gasket
• Door bottom
see page 20
7
311TBX-25, 312TBX-25
GUIDE D’INSTALLATION INSTALLATION MANUAL
PARTS LISTING
6
HARDWARE
4
8
9.2
11.1
WALL PLUG #6-1
HINGE
9.3
10
9.1
11.2
SCREW #8-3/8
11.3
SCREW #8-1 1/4
11.4
11.5
HINGE
SPACING BLOCK
5
4
7
ITEM NO.PARTS QTY
1DOOR PANEL1
2.1FIXED PANEL1
2.2EXPANDER1
2.3GASKET1
3WALL JAMB2
4HINGE2
5BOTTOM GLASS CLIP4
6SUPPORT BAR1
7BOTTOM DOOR GASKET1
8SIDE GASKET1
9.1RETURN PANEL1
9.2EXPANDER1
9.3GASKET1
10TOWEL BAR1
11HARDWARE
11.1WALL PLUG #6-18
11.2SELF DRIILLING SCREW #8-3/86
11.3SELF DRILLING SCREW #8-1 1/46
11.4SCREW CAP #8/88
11.5SPACING BLOCK2
5
SCREW CAP
8
311TBX-25, 312TBX-25
INSTALLATION MANUAL
TOOLS AND MATERIAL REQUIRED
LONG NOSE LOCKING PLIER
PENCIL
CUTTING PLIERLEVELTAPE MEASURE
•Support Bar
see page 18-19
DRILLSILICONESCREWDRIVERS
1/4˝& 1/8˝ DRILL BITS
MALLETBLOCK
INSTALLATION OF COMPONENTS
• Hinges
• Door panel
see page 21
• Return panel
• Bottom clips
see page 16-17
•Towel Bar
see page 22
• Side gasket
• Door bottom
see page 20
9
201X-34, 202X-34
HINGE
INSTALLATION MANUAL
PARTS LISTING
HARDWARE
11.1
WALL PLUG #6-1
1
11.2
11.3
11.4
11.5
HINGE
ITEM NO.PARTS QTY
1DOOR PANEL1
2.1FIXED PANEL1
2.2EXPANDER1
2.3GASKET1
3WALL JAMB1
4HINGE2
5BOTTOM GLASS CLIP2
6SUPPORT BAR1
7BOTTOM DOOR GASKET1
8SIDE GASKET1
11HARDWARE
11.1WALL PLUG #6-14
11.2SELF DRIILLING SCREW #8-3/83
11.3SELF DRILLING SCREW #8-1 1/43
11.4SCREW CAP #8/84
11.5SPACING BLOCK2
SCREW #8-3/8
SCREW #8-1 1/4
SCREW CAP
SPACING BLOCK
10
201X-34, 202X-34
INSTALLATION MANUAL
TOOLS AND MATERIAL REQUIRED
LONG NOSE LOCKING PLIER
PENCIL
CUTTING PLIERLEVELTAPE MEASURE
•Support Bar
see page 18-19
DRILLSILICONESCREWDRIVERS
1/4˝& 1/8˝ DRILL BITS
MALLETBLOCK
INSTALLATION OF COMPONENTS
• Hinges
• Door panel
see page 21
• Return panel
• Bottom clips
see page 16-17
• Side gasket
• Door bottom
see page 20
11
INSTALLATION MANUAL
311X-34, 312X-34
PARTS LISTING
HARDWARE
HINGE
HINGE
9.2
9.3
11.1
WALL PLUG #6-1
11.2
SCREW #8-3/8
11.3
SCREW #8-1 1/4
11.4
SCREW CAP
11.5
SPACING BLOCK
ITEM NO.PARTS QTY
1DOOR PANEL1
2.1FIXED PANEL1
2.2EXPANDER1
2.3GASKET1
3WALL JAMB2
4HINGE2
5BOTTOM GLASS CLIP4
6SUPPORT BAR1
7BOTTOM DOOR GASKET1
8SIDE GASKET1
9.1RETURN PANEL1
9.2EXPANDER1
9.3GASKET1
11HARDWARE
11.1WALL PLUG #6-18
11.2SELF DRIILLING SCREW #8-3/86
11.3SELF DRILLING SCREW #8-1 1/46
11.4SCREW CAP #8/88
11.5SPACING BLOCK2
12
INSTALLATION MANUAL
311X-34, 312X-34
TOOLS AND MATERIAL REQUIRED
LONG NOSE LOCKING PLIER
PENCIL
•Support Bar
see page 18-19
CUTTING PLIERLEVELTAPE MEASURE
DRILLSILICONESCREWDRIVERS
1/4˝& 1/8˝ DRILL BITS
MALLETBLOCK
INSTALLATION OF COMPONENTS
• Hinges
• Door panel
see page 21
• Return panel
• Bottom clips
see page 16-17
• Side gasket
• Door bottom
see page 20
13
311TBX-34, 312TBX-34
HINGE
PARTS LISTING
9.2
9.3
INSTALLATION MANUAL
HARDWARE
11.1
WALL PLUG #6-1
11.2
SCREW #8-3/8
11.3
SCREW #8-1 1/4
11.4
11.5
HINGE
ITEM NO.PARTS QTY
1DOOR PANEL1
2.1FIXED PANEL1
2.2EXPANDER1
2.3GASKET1
3WALL JAMB2
4HINGE2
5BOTTOM GLASS CLIP4
6SUPPORT BAR1
7BOTTOM DOOR GASKET1
8SIDE GASKET1
9.1RETURN PANEL1
9.2EXPANDER1
9.3GASKET1
10TOWEL BAR1
11HARDWARE
11.1WALL PLUG #6-18
11.2SELF DRIILLING SCREW #8-3/86
11.3SELF DRILLING SCREW #8-1 1/46
11.4SCREW CAP #8/88
11.5SPACING BLOCK2
SCREW CAP
SPACING BLOCK
14
311TBX-34, 312TBX-34
INSTALLATION MANUAL
TOOLS AND MATERIAL REQUIRED
LONG NOSE LOCKING PLIER
PENCIL
CUTTING PLIERLEVELTAPE MEASURE
•Support Bar
see page 18-19
DRILLSILICONESCREWDRIVERS
1/4˝& 1/8˝ DRILL BITS
MALLETBLOCK
INSTALLATION OF COMPONENTS
• Hinges
• Door panel
see page 21
• Panneau de retour
• Supports inférieurs
• Return panel
• Bottom clips
voir page 16-17
see page 16-17
•Towel Bar
see page 22
• Side gasket
• Door bottom
see page 20
15
INSTALLATION MANUAL
1
THIS INSTALLATION PROCEDURE APPLIES FOR
ALL RETURN PANELS INSTALLATION REGARDLESS OF QUANTITY OR ADDITIONAL FIXTURE
SUCH AS TOWEL BAR.
Using a measuring tape, mark the center of the
1a.
threshold of the base.
Using the marking established in the previous
1b.
step, run a second line up the wall. Use a level
to ensure verticality of this line.
FIXED PANEL INSTALLATION
201X, 202X, 311X, 312X, 311TBX, 312TBX
3
1a
1c.
Place the wall jamb (3) onto the wall while
ensuring that the wall jamb slotted holes are
centered to the center line. The side with holes
of the wall jamb should face the interior of the
shower.
Drill holes using a Ø1/8˝ drill bit, through the
wall using the wall jamb slotted holes as reference.
Insert a drop of silicone into each hole made in
1d.
the previous step. Insert a wall plug (11.1) into
each hole and from there the wall jamb can be
repositioned and permanently fastened using
self drilling screws #8-1 1/4 (11.3).
1b
INTERIOR
SHOWER SIDE
3
1c
11.3
11.1
1d
16
INSTALLATION MANUAL
201X, 202X, 311X, 312X, 311TBX, 312TBX
1
1e.
Place the bottom clips (5) for return panel on
the line traced previously following dimension
shown on the plan view.
Mark the screw location. Remove temporary
the bottom clips to drill the base using #1/8”
drill bit.
Put silicone onto the bottom clip bottom face
groove and around the hole. Finally, fasten the
bottom clips to the base using the provided
screws. Place the gaskets into bottom clips
slots.
1f.
Slide the return panel assembly into the wall
jamb (3) and through the bottom clips slots.
Once the return panel has been adjusted,
secure the expander (2.2) (9.1) to the wall jamb
(3) by way of a clamp so as to keep the return
panel level.
CONTINUED
1e.
4 1/4”
5
30 3/8”(56301-56302-56303)
21”(4301-4302-4303)
5
5
1g.
Tighten the bottom clips set screws (5).
Secure the wall jamb (3) to the expander (2.2)
1h.
(9.1) by using #8- 3/8 screws (11.2), as well as
screw caps (11.4).
5
1g
1f
8
3
3.3
2.1
2.2
3.1
1h
11.2
11.4
3
17
INSTALLATION MANUAL
201X, 202X, 311X, 312X, 311TBX, 312TBX
2
2a.
Take apart the end component (A) of the support bar with the provided Allen Key.
2b.
Transfer the position of the bottom clip (8) to
the back wall. At 82” from the threshold mark
the position (center of the cylinder ) for the
support bar end component (A) mounting
2d.
Drill the back wall using a Ø1/4”drill bit.
SUPPORT BAR INSTALLATION
2a
6
B
2b
WALL END COMPONENT
A
2c
A
2d
2e.
Apply a bead of silicone in each hole and
insert the wall plug.
Proceed to fasten the wall end components (A)
onto the wall.
To ease subsequent installation on the front
2f.
panel. Insert bar (6) in the component wall (A)
on a horizontal plane as shown.
Tighten the set screws.
2e
MIN 82” | M AX. 8 2 1/4”
DIS TANCE FROM TOP O F TH RES HOLD TO C ENT ER OF WALL EN D C OMPONE NT
5
6
A
B
18
INSTALLATION MANUAL
201X, 202X, 311X, 312X, 311TBX, 312TBX
2
2h.
Insert the clear gasket as shown. Then Loosen
and rotate support bar to grab the front panel.
CONTINUED
2h
B
Clear Gasket
2g.
Level support bar. Tighten the set screws.
.
B
INTERIOR
SHOWER SIDE
5
2g
A
B
INTERIOR
SHOWER SIDE
19
INSTALLATION MANUAL
201X, 202X, 311X, 312X, 311TBX, 312TBX
3
Align the panel side gasket to the glass
3a.
panel edge. Insert it with a 2˝ x 6˝ x 1/2˝ block
and a mallet. Trim the excess using the cutting plier.
3b.
Cut the bottom door gasket (7) as illustrated.
The lip should be about 3/4˝ longer than the
rest.
Rest the door panel (1) on a fat surface. With
3c.
the mallet, insert the bottom door gasket (7) at
the bottom of the door. Make sure the lip faces
the shower side. Install the 2 spacing blocks
(11.5) onto the bottom lip of the gasket (7).
3a
GASKETS INSTALLATION
INTERIOR
SHOWER SIDE
8
2.1
8
2.1
INTERIOR
SHOWER SIDE
2.1
1
3b
Lèvre
Lip
7
3c
7
INTERIOR
11.5
7
SHOWER SIDE
1
8
7
11.5
20
HINGES INSTALLATION
4
4a.
Fasten one side of the hinges (4) onto the
panel (2.1). Do not tighten all the way for
this step to allow other door (1) adjustments.
4b.
Place the door panel vertically next to the
panel (2.1). The holes for the hinges should
be aligned.
INSTALLATION MANUAL
201X, 202X, 311X, 312X, 311TBX, 312TBX
4a
INTERIOR
SHOWER SIDE
1
4
4c.
Fasten the hinge on the door (1).The door
panel must be leveled before tightening the
hinges completely.
Remove the spacing blocks (11.5).
4d.
4d
5d
4b
11.5
4c
11.5
4
21
INSTALLATION MANUAL
201X, 202X, 311X, 312X, 311TBX, 312TBX
5
5a.
For 4302 - 4303 - 56302 -56303 - 4302 4303 - 56302 - 56303.
If installation of return panel (9.1) has not
been performed yet please, refer to step #1
to complete the installation.
Install the towel bar (10) as illustrated.
5b.
TOWEL BAR INSTALLATION
5a
9.1
MODEL: 311TBX - 312TBX
MODEL: 311X - 312X
5b
10
22
INSTALLATION MANUAL
SILICONE SEAL THE SHOWER DOOR
6
6a.
Seal the exterior of the shower along the wall
with silicone. Fill gap between the glass panels and base surrounding the bottom clips (5).
201X, 202X, 311X, 312X, 311TBX, 312TBX
HOURS
5
23
Loading...
+ hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.