Alumax K-KA4Z User Manual

K-KA4Z - Kona
INSTRUCTION MANUAL
KONA CURVED GLASS SLIDING SHOWER DOOR
KK005
CURVED GLASS SLIDING SHOWER DOOR
Please keep this manual and product code number for future reference
and replacement parts ordering if necessary.
READ CAREFULLY AND COMPLETELY BEFORE PROCEEDING
CURVED GLASS SLIDING SHOWER DOOR
IT IS RECOMMENDED THAT YOU WEAR SAFETY GLASSES AT ALL TIMES DURING INSTALLATION
INSTALLATIONOVERCERAMICTILE
HOWTOCAREFORYOURDOOR
Never use scouring powder pads or sharp instruments on metal work or glass panels. An occasional wiping down with a mild detergent diluted in water is all that is needed to keep the panels and aluminum parts looking new.
Product specifications are subject to change without notice.
TOP TRACK WITH ROUNDED CHANNEL
PACKAGING CHECK LIST & HARDWARE
11 12
1
2
3
4
5 76
WALL JAMB (2)
1
EXPANDER (2)
2
BOTTOM TRACK WITH FLAT CHANNEL
GLASS SUPPORT /R (4)
5
BOTTOM TRACK (1)
6
8
SET OF HANDLES (2)
9
SIDE GASKET (2)WALL JAMB SIDE
10
10
9
FIXED PANEL (2)
3
GLASS SUPPORT /L (4)
4
DOOR PANEL (2)
7
SIDE GASKET (4) MAGNET GASKET (2)
8
TOP TRACK (1)
11
12
PAGE 1
OOLS LIST
SCREWDRIVERS
5/16ʼʼ
HEX NUT DRIVER
PACKAGING CHECK LIST & HARDWARE
CERAMIC DRILL BIT TILE
PENCILDRILL MEASURE TAPELEVELSILICON
1/4”
1/8”
DRILL BIT
MALLET
4
GLASS SUPPORT /L (4) GLASS SUPPORT /R (4)
10
(FOR ‘’ POINT ’’
PARIS
GLASS ONLY)
SIDE GASKET (2)WALL JAMB SIDE
OR
15
5
12
MAGNETIC DOOR GASKET (2)
16 17
(M4 X 8)
8
SIDE GASKET 4)
13
SCREW CAP (8)
9
SET OF HANDLES (2)
14
(M4 X 8)
SCREW 3/8” LG (8)
(M4 X 35)
SCREW ½” LG (4)
WALL PLUG (8)
SCREW 1 3/8” LG (14)
PAGE 2
Step
DOOR INSTALLATION STEPS
3
-POSITION AND CENTER THE FRAME TOGETHER WITH WALLJAMBS ONTO THRESHOLD OF SHOWER BASE.
Step
4
- ADJUST AND LEVEL THE FRAME ASSEMBLY.
- TRACE OUTER EDGE OF WALL JAMBS.
- REMOVE FRAME ASSEMBLY FROM BASE.
ON BOTH SIDES
PAGE 4
ÉTAPES D’INSTALLATION DE LA PORTE / DOOR INSTALLATION STEPS
Étape / Step
EXTENSEUR (2)+ RAIL (2) + VIS 1 3/8’’ LG (8)
1
EXPENDER (2) + TRACK (2) + SCREW 1 /3/8’’ LG (8)
Étape / Step
2
INSÉREZ LES JAMBAGES TEMPORELLEMENT
INSERT WALL JAMBS TEMPORALLY
PAGE 3
5A
DOOR INSTALLATION STEPS
5B
6A
5
- REALIGN WALL JAMB WITH REFERENCE LINE (2).
- MARK DRILLING LOCATION FOLLOWING PILOT HOLES.
- DRILL HOLES BY USING SUITABLE 1/4” DRILL BIT.
ON BOTH SIDES
6B
6C
Step
6
- INSERT THE WALL PLUGS (6) AND PUT IN EACH A DROP OF SILICONE.
- SECURE THE WALL JAMB USING 1 3/8” SCREWS (6)
PAGE 5
Step
7
INSERT ONE OF FRAME INTO WALL JAMBSIDE
Insert
ame
rf re
ow
L
DOOR INSTALLATION STEPS
Step
Slide
Push
Slide
Push
8B
8A
INTERIOR SHOWER SIDE
Slide
Push
8
ENGAGE THE OTHER SIDE OF FRAME INTO WALL JAMB
PAGE 6
INTERIOR SHOWER SIDE
GLASS
TOP TRACK
GLASS SUPPORT
Step
9
FIXED PANEL (2) ON BOTH SIDE
DOOR INSTALLATION STEPS
INTERIOR SHOWER SIDE
BOTTOM TRACK
A1
A
A2
INTERIOR SHOWER SIDE
B
Step
10
GLASS SUPPORT (8) + SCREW ½” LG (8)
PAGE 7
Step
11
INSTALL DOOR PANELS
DOOR INSTALLATION STEPS
(OPTIONAL)
PUSH DOWN
13C
INTERIOR SHOWER SIDE
INTERIOR SHOWER SIDE
PUSH DOWN
13A
13B
Step
12
INSERT DOOR PANELS INTO TOP & BOTTOM TRACK
INTERIOR SHOWER SIDE
PAGE 8
Step
13
USE HEX NUT OR PLIERS FOR DRIVER VERTICAL DOOR ADJUSTMENT
DOOR INSTALLATION STEPS
LOOSEN
13A 13B
INTERIOR SHOWER SIDE
13C
VERTICAL ADJUSTMENT
TIGHTEN
13D
13E
Step
14
INSTALL SIDE PANEL GASKET ONTO DOOR PANEL 1 (1)
PAGE 9
Step
15
INSERT EXPANDER CAPS
DOOR INSTALLATION STEPS
Step
A
B
INTERIOR SHOWER SIDE
16
SCREW 3/8” LG (8) + SCREW CAP (8)
ON BOTH SIDES
INTERIOR SHOWER SIDE
PAGE 10
Step
17
INSERT SIDE GASKET WALL JAMB SIDE (2) (both sides)
(FOR ‘’ POINT ’’ GLASS ONLY)
PARIS
INTERIOR SHOWER SIDE
DOOR INSTALLATION STEPS
OR
(FOR 6mm GLASS ONLY)
24
Hours
INTERIOR SHOWER SIDE
Step
SILICONE EXTERIOR OF ( BOTTOM TRACK + ALONG WALL JAMB)
18
PAGE 11
Loading...