Alpha UL LISTED User Manual

INDUSTRIAL
POWER
Set-Up Instructions
(Liner-Based System)
UL LISTED
________________Important_________________
Report any shortages within 72 hours
Specializing in Environmental and Fire-Life
Safety Compliance for Stationary Battery
Systems
11/07 Rev B
Table of Contents
Part Familiarization…………………………………………………. 2
Required Tools………..……….................................................... 3
Step 1 Verify Measurements…………………………………….... 4
Step 2 Floor Preparation …………............................................. 4
Step 3 Liner Layout………………………………………………… 5
Step 4 Rack & Battery Installation……………………………….. 6
Step 5 Seal Rack & Anchor Bolts………………………………... 7
Step 6 Containment Layout ……………………………….……… 7
Step 7a Barrier Installation w/Anchor Bolts …………………... 8
Step 7b Barrier Installation with Adhesive Option …………… 8
Step 8 Final Assembly – Extrusion Clips ……………………… 9
Step 9 Pillow Installation………………………………………….. 9
Installation Training………………………………………………… 12
Maintenance………………………………………………………….. 13
Product Familiarization
Page 2
Component Listing:
EAGLE BARRIER WALLS
001-06 002-12 002-12ADJ
002-24 002-24ADJ
002-36 002-14ADJ
002-48 002-48ADJ
PILLOWS
SOC NABPILL
FLOOR ANCHORING HARDWARE
1/4” Floor Anchor Bolt Drop-In Floor Anchor Floor Anchor Washer
Anchor Setting Tool
UL LISTED FACTORY FORMED LINER
Corrosion Resistant Liner
Page - 2 -
Page 3
Tools Required for Installation
Anchor Setting tool (Provided) Caulking Gun (Provided) Hammer Drill Hammer Ratchet w/ 7/16” and ½” Sockets Chalk Line Duct Tape Non-Conductive Measuring Tape Marker Utility Knife with Regular or Hook Blades Side Cutters (Snips) Throw-away Latex Gloves Dust Pan and Hand Broom Vacuum Safety Glasses