Alfresco AXEVPT10 Specifications

5
4
"
8
AXEVP-T10 TYPICAL INSTALLATION
COUNTERTOP CUTOUT REQUIREMENTS
AXEVP-T10 UNIT
7
"
16
MAXIMUM
HEIGHT
3
"
MAXIMUM REACH
COUNTERTOP + SUB-TOP
MATERIALS DEPTH
16
NOTE:
COUNTERTOP SURFACE MATERIAL AND SUB-TOP MATERIAL MUST HAVE A MINIMUM OF 1/2" AND A MAXIMUM OF 2-7/8" TOTAL THICKNESS.
72" OF 3/8" Ø SOFT DRAWN COPPER SUPPLIED WITH UNIT
4" COLUMN
ADJUSTABLE
10" 12" OR
14"
HIGH
4-1/2" SQUARE CUTOUT
ACCESS REQUIRED TO UNDERCOUNTER FOR CONNECTION AND INSTALLATION
1-5/8 MIN. BACK
CLEARANCE
BACK SUPPORT PLATE
5
"
4
8
18"
EXTENDED
RADIUS
MAX.
6"
BASE COVER SIZE
5
7
"
16
5
7
"
16
6"
12"
MIN.
EXTENDED
RADIUS
NOTE:
THE AXEVP-T10 POT FILLER TOWER REQUIRES A WATER LINE THAT MUST BE SUPPLIED UNDER THE COUNTERTOP FOR PROPER OPERATION. THE UNIT IS SUPPLIED WITH 6 FT OF 3/8" Ø SOFT DRAWN COPPER FOR CONNECTION TO A FAUCET COMPRESSION VALVE BY CUSTOMER.
SUPERIOR EQUIPMENT SOLUTIONS 7039 EAST SLAUSON AVENUE COMMERCE, CA. 90040
LAST SAVED BY: »» Adrian «« Tuesday, October 31, 2017 12:11:45 PM
THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF SUPERIOR EQUIPMENT SOLUTIONS INC. ANY REPRODUCTION IN PART OR AS A WHOLE WITHOUT WRITTEN PERMISSION FROM SUPERIOR EQUIPMENT SOLUTIONS, INC. IS PROHIBITED.
DRAWN BY: CREATED:
ADRIAN CRISCI
5/5/2009 2:04:33 PM
PROJECT TITLE:
AXEVP-T10
DRAWING TITLE:
AXEVP-T10 POT FILLER TOWER
DRAWING NO.:
AXEVP-T10
SHEET 1 OF 1
Loading...